Presentation is loading. Please wait.

Presentation is loading. Please wait.

Report to the collaboration Yifang Wang IHEP Progress of the construction –SSM: Valve box successful, magnet cool down in mid June –Mechanical structure.

Similar presentations


Presentation on theme: "Report to the collaboration Yifang Wang IHEP Progress of the construction –SSM: Valve box successful, magnet cool down in mid June –Mechanical structure."— Presentation transcript:

1

2 Report to the collaboration Yifang Wang IHEP

3 Progress of the construction –SSM: Valve box successful, magnet cool down in mid June –Mechanical structure of EMC: under manufacture –Schedule: Keep on –Funding: Keep on

4 EB meetings Website Computing Progress of construction Management plan

5 A Proposal for the BESIII Management Yifang Wang

6 Management structure SpokespersonsEB Technical coordinator Run coordinator Software and Computing coordinator Physics coordinators Speakers bureau Publication committee Technical board Computing board PCC SCC

7 Technical coordinator Appointment procedure –Nominated by spokesperson(s) in consultation with EB and ratified by IB –Term: three years renewable Responsibilities –Coordinate activities for detector construction and upgrades, organize discussions on technical matters, resource allocation, etc. –Organize safety efforts and enforce safety rules –Plan and organize detector installation –Organize efforts for the summer maintenance Nomination: Yuan-Bo Chen(IHEP)

8 Run coordinator Appointment procedure –Nominated by spokesperson(s) in consultation with EB and ratified by IB –Term: three years renewable Responsibilities –Daily operation of the detector –Resource management for the daily operation –Responsible for external contacts for daily operation: accelerator, utilities, … –Shift planning, training and organization Nomination: Jun-Guang Lu(IHEP)

9 Software and computing coordinator Appointment procedure –Nominated by the spokesperson(s) in consultation with EB and ratified by IB –Term: three years renewable Responsibilities –Organize software groups and recommend their group leaders to EB after consultation with the software coordination committee (SCC). –Allocate resources (man power, computing…) for software development and data production –Responsible for the software development, testing, release and maintenance –Responsible for establishing the computing environment –Responsible, assisted by physics coordinator(s), for the data production, quality control, calibration and data management Nomination: Wei-Dong Li(IHEP)

10 Software Coordination committee (SCC) Organization –Software and computing coordinator –Computing board chair –Physics coordinator and deputy coordinator –Software group leaders –Chaired by the software and computing coordinator Responsibilities –Discuss all important matters related to software and advise the software and computing coordinator

11 Physics coordinators Appointment procedure –Nominated by spokespersons in consultation with EB and ratified by IB –Term: 1 year as deputy coordinator and 1 year as coordinator Responsibilities –Organize physics analysis and physics tools groups, recommend their conveners to EB after consultation with the physics coordination committee (PCC). –Organize and chair analysis meetings, arrange parallel and plenary physics sessions at collaboration meetings. –Organize discussions on physics priorities, running plans, Monte Carlo production priorities, etc. –Allocate resources(computing, man power, … ) for physics analysis –Organize efforts, in coordination with the software coordinator, for data quality checks, performance tests, calibration verification, … –Organize efforts to provide common analysis tools, methods, standards, and data (such as luminosities, bad runs, … ) –Responsible for high quality and efficient publication of physics papers, including tracking analysis progress, appointing paper referees, … Nomination: Ya-Jun Mao(PKU) Haibo Li(IHEP)

12 Physics coordination committee (PCC) Organization –Physics coordinator and deputy coordinator –Software and computing coordinator –Computing board chair –Publication committee chair –Speakers Bureau Chair –physics group and analysis tool group conveners –Chaired by the Physics coordinator Responsibilities –Discuss all important matters to physics analysis and advise the physics coordinator

13 Speakers bureau Organization –Nine members: three standing members, six appointed members –Standing members: Physics coordinator, software coordinator and technical coordinator –Appointed members: Nominated by spokespersons in consultation with EB and ratified by IB for a renewable term of 1 years –Chaired by speakers bureau chairman, appointed by the spokesperson in consultation with EB and ratified by IB for a renewable term of 1 year –Spokespersons may attend the meeting as ex officio members Responsibilities –propose policies for selecting speakers –Keep statistics of speakers –Contact potential conference organizers to get talks –Appoint speakers –Organize rehearsal of talks for conferences Nomination: Chair: Xiao-Yan Shen(IHEP) Secretary: X.H. Mo(IHEP) Member: S. Komamiya(Tokyo) Z.P. Zhang(USTC) K.J. Zhu(IHEP) S. Jin(IHEP)

14 Technical board Organization –Spokesperson(s), technical coordinator, run coordinator, physics coordinator, software coordinator, chief engineers, sub-detector group leaders, safety and quality control officers,… –Chaired by the spokesperson, if absent, by the technical coordinator Responsibilities –Discuss and resolve all technical matters of the detector construction, installation and operation –Establish major maintenance plan –Propose detector upgrades –Discuss and allocate resources (man power, funding, …)

15 Publication committee Organization –Seven members: two standing members, five appointed members –Standing members: physics and deputy physics coordinator –Appointed members: Nominated by spokespersons in consultation with EB and ratified by IB for a renewable term of 1 years –Chaired by the publication committee chairman, appointed by the spokesperson in consultation with EB and ratified by IB for a renewable term of 1 year –Spokespersons may attend the meeting as ex officio members Responsibilities –propose publication policies, including review and submission processes, final paper editing, documentation requirements, responsibilities and obligations of paper writers and referees, … –propose similar policies for conference talks –Enforce common analysis tools, methods, standards, and data (such as luminosities, bad runs, … ) –Resolve or propose to resolve paper disputes Nomination: Chair: W.G. Li(IHEP) Member: U. Wiedner(Bochum) C.Z. Yuan(IHEP) X.Y Zhang(SDU) G. Rong(IHEP)

16 Computing board Organization –Seven members: two standing members, five appointed members –Standing members: Software and computing coordinator, Physics coordinator –Appointed members: Nominated by spokespersons in consultation with EB and ratified by IB for a renewable term of 3 years –Chaired by the board chairman, appointed by the spokesperson in consultation with EB and ratified by IB for a renewable term of 3 year. If absent, chaired by the Software and computing coordinator. Responsibilities –Estimate and determine the needs of computing resources (including CPU, networking and storage) for the data production and analysis –coordinate resources (funding, computing power from inside and outside of IHEP, …) –Organize efforts to build the computing facility –Discuss and resolve all technical matters for the computing system –Establish policies for the use of computing facilities –Propose upgrade plans Nomination: Chair: G. Chen(IHEP) Member: K. Peters(GSI) Y.N. Gao(Tsinghua) Y.Z. Sun(IHEP) J.L. Ping(NNU)


Download ppt "Report to the collaboration Yifang Wang IHEP Progress of the construction –SSM: Valve box successful, magnet cool down in mid June –Mechanical structure."

Similar presentations


Ads by Google