Large Disturbance in the European Power System on the 4th of November 2006 CAMS/RRPA Panel Session Mitigation and Prevention of Cascading Outages: Methodologies.

Similar presentations


Presentation on theme: "Large Disturbance in the European Power System on the 4th of November 2006 CAMS/RRPA Panel Session Mitigation and Prevention of Cascading Outages: Methodologies."— Presentation transcript:

1 Large Disturbance in the European Power System on the 4th of November 2006 CAMS/RRPA Panel Session Mitigation and Prevention of Cascading Outages: Methodologies and Practical Applications PES General Meeting, Vancouver, Canada July 24, 2013 Janusz Bialek (Durham), Vladimir Terzija (Manchester), Taiying Zheng (Manchester), Walter Sattinger (Swissgrid)

2 Site of two UNESCO Wold Heritage Sites 3 rd oldest university in England Durham University

3 PMAPS 2014, Durham International Conference on Probabilistic Methods Applied to Power Systems, 7-10 July 2014 Paper submission deadline 30 Nov

4 Source of data and diagrams: UCTE Final Report System Disturbance on 4 November M households affected, 16,724 MW lost The worst disturbance in 50 years of UCTE/ENTSOE in terms of the number of TSOs affected and frequency deviations involved Duration 1 hour and 35 minutes (22:10-23:45) but only 38 minutes three island operation

5 East-West transfer 15 GW of wind (5.5%) High flows around Germany Source: UCTE Voltage phase angle differences in the UCTE system at 22:00 Source: UCTE Abschlussbericht zur Systemstörung 4. Nov Loading pre-disturbance

6 Note the difference between scheduled and actual flows (e.g. FR-D, FR-BE) due to loop flow phenomenon Especially important D-NL, D-PL due to high wind Source: UCTE

7 Timeline 18 Sept: a shipyard request EON for a routine disconnection of double circuit 380 kV line in Northern Germany on 5 Nov 3 Nov: the shipyard request to bring forward the disconnection by 3 hours EON agrees provisionally but does not modify Day Ahead Congestion Forecast (DACF) distributed to all TSOs 4 Nov, 7 pm: EON informs RWE and TenneT about new time for the line outage 9.30 pm: EON concludes empirically, without updated (N-1) analysis, that the outage would be secure (it wasnt!) Image:

8 RWE does (N-1) analysis of its area which indicates high but secure loading 9.38: EON disconnects the line : warnings of high flows EON assesses the situation empirically, without simulations, and decides to couple a busbar to reduce the current by 80 A Result: the current increases by 67 A and the line trips Cascading line tripping all over UCTE and separation into 3 regions with different frequencies Source: UCTE

9 0.8 GW deficit 49.7 Hz 8.9 GW deficit 49 Hz 10 GW surplus 51.4 Hz Source: UCTE

10 Western Europe: 8.9 GW deficit Drop of frequency halted by load shedding But frequency drop caused tripping of 10.7 GW of generation (40% wind)

11 North-Eastern Europe: 10 GW surplus Initial rise of frequency halted by AGC and tripping of frequency-sensitive generation (mainly wind) As frequency started to drop, windmills started to reconnect automatically worsening the situation Situation stabilised by manual action of TSOs Source: UCTE

12 South-Eastern Europe: modest 0.8 GW deficit No load shedding activated, subsystem (N-1) secure Source: UCTE

13 Resynchronisation A number of uncoordinated unsuccessful attempts made without knowledge of the overall UCTE situation Full resynchronisation after 38 minutes Source: UCTE

14 UCTE root cause analysis Main points: – (N-1) security rule, inadequate inter-TSO coordination – Lack of situational awareness – Other factors (wind farms, lack of coordination)

15 Improvements since 2006: situational awareness Web-based visibility of cross-border flows in Europe, ACE, generation traffic light system to indicate security, control reserves and state of IT infrastructure RAAS – real-time awareness and alarming system, EAS (ENTSO-E awareness) – all TSOs have the same view – the information maintenance is done on two central points with highly redundant infrastructure.

16 Improvements since 2006: coordinated (N-1) security analysis All national files are merged into one common CE load flow file each TSO downloads the complete system and perform complete (n-1) calculation. Evening phone/web/video conference of all the TSOs to coordinate remedial actions

17 Further Measures: Synchronized Measurement Technology, WAMS WAMS HSE/PMU-SE Situational Awareness Dynamic Security Assessment Decision Making

18 All measurements are synchronised by GPS signal Data Records during 39 Minutes of the Islanding System Operation Source: W.Sattinger, Swissgrid

19 Large Disturbance in the European Power System on the 4th of November 2006 CAMS/RRPA Panel Session Mitigation and Prevention of Cascading Outages: Methodologies and Practical Applications PES General Meeting, Vancouver, Canada July 24, 2013 Janusz Bialek (Durham), Vladimir Terzija (Manchester), Taiying Zheng (Manchester), Walter Sattinger (Swissgrid)


Download ppt "Large Disturbance in the European Power System on the 4th of November 2006 CAMS/RRPA Panel Session Mitigation and Prevention of Cascading Outages: Methodologies."

Similar presentations


Ads by Google