World Bank Procurement Training1. Procurement Legal Framework Political situation HISTORY ECONOMY LEGAL Background Institutions International Agreements.

Similar presentations


Presentation on theme: "World Bank Procurement Training1. Procurement Legal Framework Political situation HISTORY ECONOMY LEGAL Background Institutions International Agreements."— Presentation transcript:

1 World Bank Procurement Training1

2 Procurement Legal Framework Political situation HISTORY ECONOMY LEGAL Background Institutions International Agreements World Bank Procurement Training2

3 Law?Guidelines? Administrative complaint system? Procurement office? External Audit? Judicial complaint system? Procurement Agency? World Bank Procurement Training3

4 PERFORMANCE INTEGRITY INSTITUTIONS LEGAL ACTION PLAN/ RECOMMENDATIONS IMPACT of the LEGAL SYSTEM World Bank Procurement Training4 The impact of the legal background on 1, 2, and 4 will be studied in the following slides

5 This presentation aims at clarifying the legal context of the countries for a pedagogical purpose. It does not and it can not reflect all the variations and particularities that are the product of each countrys history. For simplicity, the expression civil law system will be used in the following slides even if it is not actually endorsed by many countries which prefer to call it the romano-germanic system. World Bank Procurement Training5

6 1. ASSESSMENT (CPARs and UCS stage 1) LEGAL Civil law systems Common law systems Common findings : Limited scope of application of the procurement legislation; Limited access to procurement information; Lack of transparency; Excessive use of single source/direct contracting; Lack of complaint mechanism for unsuccessful bidders; Individual conflict of interests and organizational conflict of interest; Lack of sanctions; World Bank Procurement Training6

7 Is there a regional trade agreement concerning procurement? Accessing process to a regional trade area? Impact of bilateral trade agreements? Constitution: Legal force of international agreements? International arbitration permitted? World Bank Procurement Training7

8 Government Procurement Agreement (WTO) UNCITRAL Model Law Regional Procurement provisions: EU Directives, WAEMU, COMESA OECD/DAC methodology Working Group on Transparency of WTO Regional Trade agreement: e.g. NAFTA OECD Convention on combating bribery World Bank (& other MDBs) Guidelines World Bank Procurement Training8

9 Plurilateral (NOT multilateral) Agreement between 37 WTO countries (over 150 countries are members of WTO) Treaty Signed in 1994, renegotiated in 2007 New interest form several countries in negotiating accession World Bank Procurement Training9

10 10 Albania Armenia Negotiating accession Commitments to access GeorgiaJordan Kyrgyz RepublicMoldovaOmanPanama Chinese Taipei Croatia Former Yugoslav Republic of Macedonia INDIA Saudi Arabia Observers Albania, Argentina, Armenia, Australia, Cameroon, Chile, China, Colombia, Croatia, Georgia, Jordan, the Kyrgyz Republic, Moldova, Mongolia, Oman, Panama, Sri Lanka, Chinese Taipei and Turkey. Three intergovernmental organizations, IMF, OECD and UNCTAD CHINAMongolia

11 No requirement for public bid opening Late bid possible under specific circumstances A procuring entity shall not penalize any supplier whose tender is received after the time specified for receiving tenders if the delay is due solely to mishandling on the part of the procuring entity Negotiations possible A Party may provide for its procuring entities to conduct negotiations : A procuring entity shall: (b)where negotiations are concluded, provide a common deadline for the remaining participating suppliers to submit any new or revised tenders. World Bank Procurement Training11

12 GPA (2007) Article XV Treatment of Tenders and Contract Awards it shall award the contract to the supplier that … has submitted: (a)the most advantageous tender; or (b)where price is the sole criterion, the lowest price. World Bank Procurement Training12 EU 2004/18 Article 53 Contract award criteria The criteria on which the contracting authorities shall base the award of public contracts shall be either: (a)when the award is made to the tender most economically advantageous…; or (b)the lowest price only

13 World Bank Procurement Training13 2. Identifying the Legal environment of the country What is the current system? What is the Legal framework?

14 CIVIL LAW COUNTRIES COMMON LAW COUNTRIES Strict hierarchy of norms (Constitution, law, Regulation, Circular, order, Individual decision) Codification Case law ? Administrative law/private law Flexible hierarchy ? Guidelines, Guidance, Waiver No codification Judiciary and Case law Arbitration and ADR No distinction between public and private law World Bank Procurement Training14

15 Countries following a common law system are typically those that were former British colonies or protectorates, including the United States and Commonwealth members. Common law is the system of law which is based on judges decisions, custom and practice rather than on written laws. There is not always a written constitution or codified laws/statutes. Judicial decisions are binding – decisions of the highest court can generally only be overturned by that same court or through legislation. A common law system is generally less prescriptive, more flexible, quickly adapted to changes than a civil law system. e.g : waiver Case-law systemrequires a well functioning court system, strong reliance on precedent ( stare decisis ) Main issues in client countries: uncertainty, lack of coherence of the judicial decisions leading to proliferation of guidances, guidelines and regulations World Bank Procurement Training15

16 The Legal Framework is based on Administrative Regulations. Under that approach, the Ministry of Finance, or other relevant ministries/ organs/agencies, issue regulations, in some cases in the form of a procurement manual, pursuant to powers granted by a statute or regulation such as a Finance or Treasury Act. Fragmentation : In some States that applied such an approach, there is an accumulation of various sets of overlapping and sometimes inconsistent regulations, instructions and circulars modifying earlier texts World Bank Procurement Training16

17 Former French, Dutch, German, Spanish or Portuguese colonies or protectorates, including much of Central and South America and many African countries. Also, most of the Central and Eastern European and East Asian countries follow. The civil law system is a codified system of law taking its origins from Roman law. There is a written constitution and specific codes ( e.g., civil code, codes covering corporate law, tax law and criminal law); Only legislative/regulatory enactments are considered binding. A civil law system is generally considered more prescriptive than a common law system Main issues in client countries: Rigidity. Heavy and slow process to enact the procurement law depending on the political agenda. Minor rules should be kept in the regulations World Bank Procurement Training17

18 Administrative law is a branch of public law. It is, in a limited definition, the body of law that governs the activities of Government administrative agencies (in the US). In an extensive definition it covers almost all the decision-making process of all administrative units at the national level (Agencies, ministries or even some Presidential decisions) or at the local level (local governments) + all public bodies using public funds. Not only it oversights the making process of individual decision concerning citizens but also of general regulations. It could also concern public contracts (including procurement contracts), contratacion publico in Spanish). These decisions or regulations are reviewed by the courts (civil courts or sometimes, by specialized courts called Administrative courts). In some civil law systems, Administrative law is essentially a judge-made law (case law). + e.g., Germany, writings of legal scholars have significant influence on the courts World Bank Procurement Training18

19 CIVIL LAW COMMON LAW References to the Constitution (if applicable) + other laws + regulations in the procurement field No chapter on definitions. Many legal concepts are already defined (by former laws, case-law or practice). E.g. Procurement contracts (or marchés publics in French), Concessions and affermage. Subdivisions: Chapters, Sections, Articles References to the Constitution (if applicable) + other laws + regulations in the procurement field No chapter on definitions. Many legal concepts are already defined (by former laws, case-law or practice). E.g. Procurement contracts (or marchés publics in French), Concessions and affermage. Subdivisions: Chapters, Sections, Articles Introduction No list of other laws Summary Chapter on definitions Subdivisions: Chapters/Parts Sections Provisions/regulations Introduction No list of other laws Summary Chapter on definitions Subdivisions: Chapters/Parts Sections Provisions/regulations World Bank Procurement Training19 CIVIL LAW

20 COMMON LAW Public contracts/private contracts Procurement proceedings heavily regulated Criterium= Price ; sealed bidding No bid security No performance bond but warranty Performance and administration of the contract by Standards clauses/ GCC Public contracts/private contracts Procurement proceedings heavily regulated Criterium= Price ; sealed bidding No bid security No performance bond but warranty Performance and administration of the contract by Standards clauses/ GCC No distinction between public and private contracts Procurement proceedings lightly regulated Criterium= best value negotiations Bid bond/security Performance bond No standardization (= no SBDs, no GCC) No specific powers granted to the Public authority No distinction between public and private contracts Procurement proceedings lightly regulated Criterium= best value negotiations Bid bond/security Performance bond No standardization (= no SBDs, no GCC) No specific powers granted to the Public authority World Bank Procurement Training20

21 English Law (contrary to US law) used to require that the promisee himself must suffer the legal detriment (consideration). Since 1999, Right of Third Parties Act, certain third parties can enforce contracts to which they are not parties. Change in the contract: admitted for long time in US law, more recently in English law because of the consideration doctrine Promise/Offer by the Promisor Acceptance by the Promisee World Bank Procurement Training21 Consideration

22 The call for bids = invitation to make an offer The bidder is the offeror Limited power of revocation of the offer = the bid security is an option ( a separate consideration/contract) No contract exists until the public entity (the offeree) accepts one bid. The acceptance of the offer creates the contract ; but there is no formalization of the acceptance World Bank Procurement Training22

23 Mailbox rule (British case 1818 Adams v. Lindsell) = an offer is effective when it is received by the offeree while an acceptance is effective on dispatch. The US-English law does not impose an obligation on a party to volunteer information to the other contracting party, with exception World Bank Procurement Training23

24 In English law, intention of the parties: property in goods is transferred when the parties (essentially the seller) to the contract intend it to be transferred. In French law, the transfer of property is an immediate result of the agreement between the parties and the intention of the parties is irrelevant after that moment, even though the goods are not delivered nor the price paid (Civil Code article 1583). Signature and formalization are required. In German law, two conditions: the agreement of the parties (legal basis) and the delivery of the goods (article 929 of the Civil Code). World Bank Procurement Training24

25 Modification/change clause Differently from the courts in most civil law countries, under the common law the courts have not the power to adjust or adapt the contract to changing circumstances. Incidents, contractual events Termination World Bank Procurement Training25

26 CIVIL LAW COMMON LAW This indemnification covers 90- 95% of costs incurred between the date on which the economic balance of the contract was disrupted and the date on which the event of « imprévision » disappears or is overcome. as long as the economic balance of the contract is not disrupted, hardship-related costs are borne by the company. continuing hardship entitles the State to terminate ongoing payments (except loss of profits) and/or to take over the project. At best in Common Law, a hardship clause imposes an obligation to meet and to discuss possible re-balancing of contract. Page 26

27 Page 27 In Common Law: A contractual term but not a « term of art » by which one or both parties are excused from performance i.e. no contractual term, no excuse. Burden of proof on party claiming to prove: beyond his control ; no reasonable way to avoid or mitigate; impossible (not merely more difficult or expensive); and not necessarily unforeseeable. Different from « Frustration » whereunder a contract may be discharged if something occurs after formation making it physically or commercially impossible to fulfil the contract (e.g. the building in which the performance is to take place is destroyed). If the contract contains a force majeure clause then the contract cannot be frustrated as the parties have dealt with the situation.

28 Principle of privity of contract in both systems Consequence on the complaint mechanism and actions against the existing contract US law already accepted that Third parties could enforce contracts to which they are not a party. Right of Third parties Act 1999 WB Audit clause and third party rights? World Bank Procurement Training28

29 Registration of companies, commercial law Freedom of information Law Criminal Law Competition Law Public Domain/ ownership of the land Guaranties, legal liabilities Arbitration for public matters Court of Auditors and (public) accounting mechanisms Civil Servants Law World Bank Procurement Training29

30 Consistency between the procurement system and the Constitutional framework, hierarchy of norms Organization of the country: federalist, decentralized, centralized with deconcentration Legal background: civil law (emphasis on norms) or common law (emphasis on institutions)

31 Judicial system: Civil courts Commercial courts? Administrative courts? Proceedings? Powers? Efficiency? Staffing? Status of the court of Auditors: established by the Constitution? Independence? Efficiency? What implication in the procurement review system?/ Audit system?

32 Anti-trust policy/competition law? Anti-trust Body? Sanction of collusive practices? Sectors regulations? Civil service law: does it permit to create a specific position for procurement staff? Requirements for hiring? Specific incentives? Revolving door provision? Code of ethics? Prevention of conflict of interest?

33 PPP law? Specific or covered by procurement framework? Institutions in charge, methods of procurement, complaint system, oversight of the performance Arbitration? Availability of arbitration for public contracts? Appropriation/ budgetary proceedings Environmental issues

34 ASSESSMENT (CPARs and UCS Stage 1) INSTITUTIONS Common issues : Common findings : Unclear involvement of several institutions, overlaps Political interferences; political appointments Hegemony of certain ministries; Central Tender Boards responsible of reviewing most of the procurement proceedings; Conflict of interest between traditional Central Tender Board functions and the review of bidder complaints; Lack of an independent Review Body; Lack of material and legal resources for Court of Auditors; Civil law systemsCommon law systems World Bank Procurement Training34

35 World Bank Procurement Training35 Institutional organization Justice organization The institutional model is linked to the Legal system

36 Emphasis on the Institutions The Commission shall have a distinct corporate identity with perpetual succession and a common seal and may sue and be sued in its corporate name. Government agencies, decentralized bodies What approvals during the tender process are required and from whom? World Bank Procurement Training36

37 CIVIL LAW COMMON LAW Regulatory body= Branch of the Executive ( e.g. in the MOF) Procurement entities= permanent committee with civil servants Deconcentration of the procuring power: pyramidal structure, levels depending on thresholds Contract signed by the Minister or his delegates (deconcentred levels) Prior control by ministries, internal system and administrative control Regulatory body= Branch of the Executive ( e.g. in the MOF) Procurement entities= permanent committee with civil servants Deconcentration of the procuring power: pyramidal structure, levels depending on thresholds Contract signed by the Minister or his delegates (deconcentred levels) Prior control by ministries, internal system and administrative control Regulatory body established by Statutes (Independent Agencies) Procurement entities: ad-hoc committee (Procurement Committee, bid-evaluation panel, steering committee) Panel shall prepare and submit an evaluation report for the consideration of the Procurement Committee Term appointed procurement officers + required experts Regulatory body established by Statutes (Independent Agencies) Procurement entities: ad-hoc committee (Procurement Committee, bid-evaluation panel, steering committee) Panel shall prepare and submit an evaluation report for the consideration of the Procurement Committee Term appointed procurement officers + required experts World Bank Procurement Training37

38 CIVIL LAW COMMON LAW Prior review is performed by Ministry of Finance or by a centralized body that performs the quality control. Where there is wider capacity, this responsibility is deconcentred to specific bodies within line ministries/contracting entities. Efficiency of the system is based on the independence of entities. Prior review is performed by Ministry of Finance or by a centralized body that performs the quality control. Where there is wider capacity, this responsibility is deconcentred to specific bodies within line ministries/contracting entities. Efficiency of the system is based on the independence of entities. Performed by the contracting entities themselves. Efficiency of the system is based on the independence of the individuals Performed by the contracting entities themselves. Efficiency of the system is based on the independence of the individuals World Bank Procurement Training38

39 1. Internal review 2.Appeal: Judicial review 1. Internal review 2.Administrative Review Panel 3.Appeal: Judiciary 1. Internal review 2. Court of Auditors and Judicial review World Bank Procurement Training39

40 CIVIL LAW COMMON LAW Protest and complaints : Courts (civil or administrative) Judges are civil servants + independent Protest and complaints : Courts (civil or administrative) Judges are civil servants + independent Protests: Peer / Administrative + professional Judiciary only for appeal or parallel Protests: Peer / Administrative + professional Judiciary only for appeal or parallel World Bank Procurement Training40

41 ASSESSMENT (CPARs and UCS Stage1) Common findings : Lack of anti-corruption institutions-sanctions Limited prosecution of procurement corruption cases; Deficient post review mechanisms; Absence of effective appeal mechanism for unsuccessful bidders; Lack of resources for the judicial system; 3 INTEGRITY Civil LawCommon Law World Bank Procurement Training41

42 CIVIL LAW COMMON LAW Strong emphasis on the judiciary Reluctance to go for arbitration in public affairs Case-law? Strong emphasis on the judiciary Reluctance to go for arbitration in public affairs Case-law? Precedent : Under the doctrine of Stare Decisis, common-law judges are obliged to adhere to previously decided cases, or precedents.Stare Decisis Critics of the Judiciary Precedent : Under the doctrine of Stare Decisis, common-law judges are obliged to adhere to previously decided cases, or precedents.Stare Decisis Critics of the Judiciary World Bank Procurement Training42

43 CIVIL LAW COMMON LAW Inquisitorial Active role of the Judge Written communication is prevailing Process of collecting evidence is a public function conducted by the Court. The Judge is in charge to find the truth not to decide which argument is stronger. Inquisitorial Active role of the Judge Written communication is prevailing Process of collecting evidence is a public function conducted by the Court. The Judge is in charge to find the truth not to decide which argument is stronger. Adversarial, Passive role of the Judge: oversees the proceedings. Strong emphasis on the oral argument Process of discovery is conducted by the parties Adversarial, Passive role of the Judge: oversees the proceedings. Strong emphasis on the oral argument Process of discovery is conducted by the parties World Bank Procurement Training43

44 Sovereign Act doctrine for the Government decisions. Exception in specific areas. Judicial review is different from an administrative appeal. In Judicial review the Court will only look at the method and the proceedings of the decision. An administrative appeal is performed by a higher body in the agency to assess also the correctness of the decision. Sovereign Act doctrine for the Government decisions. Exception in specific areas. Judicial review is different from an administrative appeal. In Judicial review the Court will only look at the method and the proceedings of the decision. An administrative appeal is performed by a higher body in the agency to assess also the correctness of the decision. World Bank Procurement Training44

45 Recommendations World Bank Procurement Training45 2. ACTION PLAN RECOMMENDATIONS

46 CIVIL LAW COMMON LAW Main issues in a civil law system: centralization of the procurement process, lack of external controls, Targets: independency of the procurement Authority, Streamline the complaint and review mechanisms Main issues in a common law system: competition among agencies and procurement bodies, uncertainty of the legal procurement framework Targets: clarify and rationalize the institutional framework, Secure the legal environment World Bank Procurement Training46

47 Court of Auditors Competition/Antitrust Agency or Sector Agencies Procurement regulatory body should be involved in negotiations of international trade agreement dealing with procurement World Bank Procurement Training47

48 Create a specific delay before contract signature (Standstill period) Screening Non-automatic suspension of the contract proceedings Access of Third parties? Impact in the existing contract? World Bank Procurement Training48

49 Adoption of international treaties, conventions and uniform rules containing elements of both the civil law and the common law. 1980 Vienna Sales Convention. The UNIDROIT Principles for International Commercial Contracts They are aimed to serve as a model to national legislators and to provide guidance to courts and arbitrators when interpreting existing uniform law and deciding disputes relating to international commercial contracts. The 2000 INCOTERMS regulate the transfer of risk and costs in contracts of sale. Soft law: Commission on European Contract Law (the Lando Commission) has prepared the Principles of European Contract Law There are similar examples in other fields of law, like international carriage of goods, international payments, international commercial arbitration. World Bank Procurement Training49

50 WB PROCUREMENT GUIDELINES OTHER INTERNATIONAL STANDARDS Mandatory provisions for procurement methods, SBDs, GCC But they dont consider: Institutions, Complaint mechanism, arbitration, enforcement of International agreements Mandatory provisions for procurement methods, SBDs, GCC But they dont consider: Institutions, Complaint mechanism, arbitration, enforcement of International agreements UNCITRAL Model Laws International Procurement Agreements (GPA) Regional Trade Agreements EU Procurement Directives WAEMU Procurement Directives ( UEMOA ) COMESA procurement Directive FIDIC + OECD reports World Bank Procurement Training50

51 the UN Convention Against Bribery and Corruption (UNCAC); the OECD Convention on Combating Bribery of Foreign Public Officials in International Business Transactions; the OECD Revised Recommendation on Combating Bribery in International Business Transactions. World Bank Procurement Training51

52 Procurement model law drafted for countries lacking procurement legal framework Agreed in 1994 new draft should be adopted in 2011 It is NOT a Treaty but a Model Law No binding provisions but recommendations Drafted by an expert group and approved by UNCITRAL Committee (60 countries) World Bank Procurement Training52

53 RECOMMENDATIONS UNCITRAL Model Law 1994 Unrestricted access to bidders: open competition shall be the rule; Comprehensive specifications in bidding documents; Full disclosure of evaluation criteria; Public bid opening; No negotiation for goods and works; The UNCITRAL Model Law does not provide specific recommendation for Institutions; World Bank Procurement Training53

54 1994 VERSIONDRAFT Bid opening (art.33) All suppliers or contractors that have submitted tenders, or their representatives, shall be permitted by the procuring entity to be present at the opening of tenders. Negotiations (art.35) No negotiations shall take place between the procuring entity and a supplier or contractor with respect to a tender submitted by the supplier or contractor. Provisions for consultant services New provisions in draft More procedures See UNCITRAL web site under working procurement 1 World Bank Procurement Training54

55 FRAMEWORK AGREEMENTS E-PROCUREMENT World Bank Procurement Training55

56 World Bank Procurement Training56 Operation & Efficiency


Download ppt "World Bank Procurement Training1. Procurement Legal Framework Political situation HISTORY ECONOMY LEGAL Background Institutions International Agreements."