Project Plan for VMC. VMC Project [1.0.0] [labor-hour = 1956 hr] Project Management [1.1.0] [labor-hour = 196 hr] System Engineering [1.2.0] [labor-hour.

Similar presentations


Presentation on theme: "Project Plan for VMC. VMC Project [1.0.0] [labor-hour = 1956 hr] Project Management [1.1.0] [labor-hour = 196 hr] System Engineering [1.2.0] [labor-hour."— Presentation transcript:

1 Project Plan for VMC

2 VMC Project [1.0.0] [labor-hour = 1956 hr] Project Management [1.1.0] [labor-hour = 196 hr] System Engineering [1.2.0] [labor-hour = 320 hr] Subsystem Development [1.3.0] [labor-hour = 1250 hr] System Integration and Testing [1.4.0] [labor-hour = 100 hr] Purchase [1.5.0] [labor-hour = 20 hr] Project Support [1.6.0] [labor-hour = 70 hr] Project Execution Plan (PEP) [1.1.1] [labor-hour = 80 hr] Project Monitor & Control [1.1.2] [labor-hour = 80 hr] PEP Review [1.1.3] [labor-hour = 16hr] System Requirement Analysis (SRA) [1.2.1] [labor-hour = 110 hr] SRA Review [1.2.2] [labor-hour = 4 hr] System Design Specification (SDS) [1.2.3] [labor-hour = 100 hr] SDS Review [1.2.4] [labor-hour = 3 hr] System Test Document (STD) [1.2.5] [labor-hour = 100 hr] STD Review [1.2.6] [labor-hour = 3 hr] VMC-REM Design & Testing [1.3.1] [labor-hour = 250 hr] VMC-PSS Design & Testing [1.3.2] [labor-hour = 250 hr] VMC-AM Design & Testing [1.3.3] [labor-hour = 250 hr] VMC-SYN Design & Testing [1.3.4] [labor-hour = 300 hr] VMC-TMS Design & Testing [1.3.5] [labor-hour = 200 hr] Software & Hardware Integration Testing [1.4.1] [labor-hour = 100 hr] Purchase Multi-Core Platform [1.5.1] [labor-hour = 20 hr] Configuration Management (CM) [1.6.1] [labor-hour = 30 hr] Technical Specification Writing [1.6.2] [labor-hour = 40 hr]

3

4 Project Life Cycle Architecture Design Requirement Development Project Planning System Subsystem System Development System Integration and Testing Design System Implementation

5 Project Life Cycle Definition According to the technique and specification, this project is developed by Waterfall Model The project could be divided into four phases: P1: Requirement and Specification Development Phase (2008/07/25~2008/10/31) P2: System Development Phase (2008/11/01 ~ 2009/04/30) P3: System Integration Phase (2009/05/01 ~ 2009/05/31) P4: The Phase of Concluding the Project (2009/06/01 ~ 2009/06/30)