Franklin & Marshall College Row Lancaster, PA Aimee Bashore Senior Thesis 2007Construction Management © Elkus Manfredi Architects Franklin & Marshall College.

Similar presentations


Presentation on theme: "Franklin & Marshall College Row Lancaster, PA Aimee Bashore Senior Thesis 2007Construction Management © Elkus Manfredi Architects Franklin & Marshall College."— Presentation transcript:

1 Franklin & Marshall College Row Lancaster, PA Aimee Bashore Senior Thesis 2007Construction Management © Elkus Manfredi Architects Franklin & Marshall College Row Lancaster, PA

2 Aimee Bashore Senior Thesis 2007Construction Management 1. Project Overview 2. Analysis 1 – Building Information Modeling (BIM) Utilization 3. Analysis 2 – Composite Metal Deck v. Precast Concrete Plank Flooring 4. Analysis 3 – Cold Weather Construction 5. Conclusion Outline of Presentation Topics

3 Franklin & Marshall College Row Lancaster, PA Aimee Bashore Senior Thesis 2007Construction Management Project Cost Project Cost –$15,250,000 Project Size Project Size –111,641 SF –6 stories Project Duration Project Duration –15 months –5/8/06 to 7/31/07 Project Delivery Method Project Delivery Method –CM at Risk with a GMP Project Overview

4 Franklin & Marshall College Row Lancaster, PA Aimee Bashore Senior Thesis 2007Construction Management 81% Residential 81% Residential –Top 5 floors containing 65 units - 1, 3 and 4 bedrooms –Handicap-accessible unit, common lounge, and laundry facilities on each floor 15% Retail 15% Retail 4% Offices 4% Offices Building Features

5 Franklin & Marshall College Row Lancaster, PA Aimee Bashore Senior Thesis 2007Construction Management Spread footings with selective compaction grouting Spread footings with selective compaction grouting Strip footings for masonry foundation walls Strip footings for masonry foundation walls Structural steel Structural steel Slab on grade Slab on grade Composite slab on deck Composite slab on deck Load-bearing block and precast hollow core concrete plank Load-bearing block and precast hollow core concrete plank Façade is brick veneer, metal sheeting, and calcium silicate masonry units Façade is brick veneer, metal sheeting, and calcium silicate masonry units Building Design

6 Franklin & Marshall College Row Lancaster, PA Aimee Bashore Senior Thesis 2007Construction Management Features Features –Demolition of historical buildings –Limited pedestrian traffic –Keep footbridge accessible –Reroute gas and electric lines Site Plan – Existing Conditions Campus

7 Franklin & Marshall College Row Lancaster, PA Aimee Bashore Senior Thesis 2007Construction Management Features Features –One main gate for deliveries –Centrally located crane and laydown area –Open site Site Layout Plan – Superstructure Campus

8 Franklin & Marshall College Row Lancaster, PA Aimee Bashore Senior Thesis 2007Construction Management Digital representation of the building process to facilitate exchange and interoperability of information in digital format Digital representation of the building process to facilitate exchange and interoperability of information in digital format BIM covers geometry, spatial relationships, geographic information, quantities, and properties of building components BIM covers geometry, spatial relationships, geographic information, quantities, and properties of building components Application possibilities of BIM include coordination of trades, activity sequencing, and scope of work details Application possibilities of BIM include coordination of trades, activity sequencing, and scope of work details Analysis 1 – Building Information Modeling

9 Franklin & Marshall College Row Lancaster, PA Aimee Bashore Senior Thesis 2007Construction Management Goals Goals –Address benefits of BIM, focusing on owners –Look at the integration of BIM with operations and maintenance procedures –Review software applications Outcomes Outcomes –BIM provides owner with visualization of building –Ease of coordination during construction –Organization of maintenance operations –Benefits for future renovations BIM Goals and Outcomes

10 Franklin & Marshall College Row Lancaster, PA Aimee Bashore Senior Thesis 2007Construction Management Benefits Benefits –Coordination of trades –More detail, more accurate estimates –Reduced paper usage Drawbacks Drawbacks –Integration of new technology Cost, Training, Capability Cost, Training, Capability –Industry’s willingness to change BIM after project completion BIM after project completion –Turnover as-built model, only good if accurate –Ease of future renovation Design and updates Design and updates –Reduce storage space –Helpful for operations and maintenance Questionnaire Results http://www.cadtek.us/src/section2.jpg

11 Franklin & Marshall College Row Lancaster, PA Aimee Bashore Senior Thesis 2007Construction Management Penn State Penn State –University Park Project Cost Project Cost –$60,000,000 Building Size Building Size –113,000 SF Design Phase Design Phase –October 2005 to April 2007 Construction Phase Construction Phase –January 2007 to January 2009 Building Features Building Features –library, mock courtroom, classrooms, offices, cafeteria, and parking BIM Case Study – Dickinson School of Law Building

12 Franklin & Marshall College Row Lancaster, PA Aimee Bashore Senior Thesis 2007Construction Management Decision to use BIM late in 2006 Decision to use BIM late in 2006 Hope that additional costs will be outweighed by any “savings" from use of BIM Hope that additional costs will be outweighed by any “savings" from use of BIM –Easier coordination –Less conflicts –Less time lost in field High quality as-builts High quality as-builts Ease of maintenance operations Ease of maintenance operations BIM Case Study – Dickinson School of Law Building

13 Franklin & Marshall College Row Lancaster, PA Aimee Bashore Senior Thesis 2007Construction Management Owner benefits before, during, and after construction Owner benefits before, during, and after construction Owner characteristics Owner characteristics –Understand time = money –Enforce training for using the technology –Set standards among design, construction, and conclusion of project Facility Management Facility Management –Knowledgeable employees –Update technology BIM from an Owner Perspective

14 Franklin & Marshall College Row Lancaster, PA Aimee Bashore Senior Thesis 2007Construction Management Tool to maintain as-built model Tool to maintain as-built model Facility manager functions Facility manager functions –Space and asset management –Project management –Emergency management –Maintenance management Facility manager features Facility manager features –Tabular or graphical output –view, query, pan, zoom, print, and share facility drawings –Planning, tracking, and managing BIM Software Review – Autodesk FMDesktop

15 Franklin & Marshall College Row Lancaster, PA Aimee Bashore Senior Thesis 2007Construction Management 1. Decision to invest the money into the technology 2. Ability to hire knowledgeable designers and contractors 3. Eliminates room for drawing storage 4. Simplifies maintenance operations 5. Eases future renovations BIM Conclusions – Relating BIM to Franklin & Marshall

16 Franklin & Marshall College Row Lancaster, PA Aimee Bashore Senior Thesis 2007Construction Management Problem Problem –Current system is a combination of composite metal deck and precast hollow core concrete plank Goal Goal –Compare two systems based on methods, schedule, and cost Outcomes Outcomes –Precast concrete plank has higher cost –Composite metal deck has longer schedule –Precast concrete plank better suited to repetition and residential construction Analysis 2 – Composite Metal Deck v. Precast Plank

17 Franklin & Marshall College Row Lancaster, PA Aimee Bashore Senior Thesis 2007Construction Management Floor System Comparison Composite Metal Deck More on-site labor More on-site labor Formwork Formwork Reinforcement Reinforcement More bearing walls needed for support More bearing walls needed for support More affordable equipment More affordable equipment Horizontal load resistance Horizontal load resistance Precast Concrete Plank Eliminates on-site prep work Eliminates on-site prep work High strength – less support needed High strength – less support needed Substantial crane needed Substantial crane needed Delivery expenses Delivery expenses Less sound transmission Less sound transmission Longer fire safety rating Longer fire safety rating

18 Franklin & Marshall College Row Lancaster, PA Aimee Bashore Senior Thesis 2007Construction Management Main Functions: 1. Platform during construction 2. Act as a form 3. Provide positive bending reinforcement for a concrete slab 4. Provide resistance to horizontal wind or earthquake loads Flooring Design – Composite Metal Deck

19 Franklin & Marshall College Row Lancaster, PA Aimee Bashore Senior Thesis 2007Construction Management Flooring Design – Composite Metal Deck Deck and Bearing Wall Deck and Steel Beam

20 Franklin & Marshall College Row Lancaster, PA Aimee Bashore Senior Thesis 2007Construction Management Flooring Design – Precast Hollow Core Concrete Plank Speedy production and erection Speedy production and erection Fire protection rating up to 4 hrs Fire protection rating up to 4 hrs Noise control Noise control Unique designs, colors, and textures Unique designs, colors, and textures

21 Franklin & Marshall College Row Lancaster, PA Aimee Bashore Senior Thesis 2007Construction Management Exterior Wall Connection Interior Wall Connection Exterior Wall Connection Interior Wall Connection Flooring Design – Precast Hollow Core Concrete Plank

22 Franklin & Marshall College Row Lancaster, PA Aimee Bashore Senior Thesis 2007Construction Management Composite Metal Deck Cost: $1,288,000 Cost: $1,288,000 Schedule: 45 days Schedule: 45 days Precast Concrete Plank Cost: $1,583,500 Cost: $1,583,500 Schedule: 30 days Schedule: 30 days Cost and Schedule Comparisons Comparison parameters 5 upper floors of building 5 upper floors of building Total of 93,034 square feet Total of 93,034 square feet Same crew size for each system Same crew size for each system

23 Franklin & Marshall College Row Lancaster, PA Aimee Bashore Senior Thesis 2007Construction Management 1. Precast plank approximately $300,000 more than composite metal deck 10% of structural cost 10% of structural cost 2% entire budget cost 2% entire budget cost 2. Composite metal deck 15 days longer than precast plank 3. Varying floor layouts and uses 1 st floor tenant space 1 st floor tenant space 2 nd - Roof are repeated pattern and residential space 2 nd - Roof are repeated pattern and residential space Flooring Analysis Conclusions

24 Franklin & Marshall College Row Lancaster, PA Aimee Bashore Senior Thesis 2007Construction Management Problem Problem –Concrete activities scheduled during winter months, effect on those activities –Schedule and cost impacts Goals Goals –Analyze requirements for cold weather concrete work –Analyze effects on schedule and budget Outcomes Outcomes –Concrete activities on critical path, difficult to change –Expedite work to avoid working in extreme conditions Analysis 3 – Cold Weather Construction

25 Franklin & Marshall College Row Lancaster, PA Aimee Bashore Senior Thesis 2007Construction Management Cold weather construction at 40 o F Cold weather construction at 40 o F Average temperatures for Lancaster, PA Average temperatures for Lancaster, PA –December 40 o F/24 o F –January 35 o F/19 o F –February 39 o F/21 o F –March 49 o F/29 o F Air-entraining agents Air-entraining agents Increase set time Increase set time Reduced strength gain rates Reduced strength gain rates Cold Weather and Concrete

26 Franklin & Marshall College Row Lancaster, PA Aimee Bashore Senior Thesis 2007Construction Management Concrete activities on critical path Concrete activities on critical path Steel delayed, delaying concrete work Steel delayed, delaying concrete work Bulk of concrete work in December, January, February, and March Bulk of concrete work in December, January, February, and March Expedite work Expedite work –Increase crew size –Extend working hours –Weekend work Schedule Analysis

27 Franklin & Marshall College Row Lancaster, PA Aimee Bashore Senior Thesis 2007Construction Management Temporary Heat Temporary Heat –Cost of natural gas –Heater rentals Temporary Protection Temporary Protection –Labor (overtime) Extended hours Extended hours Weekend work Weekend work –Material Hoses Hoses Blankets Blankets Plastic window covers Plastic window covers Additional cost approximately $145,000 Additional cost approximately $145,000 Cost and Material Analysis

28 Franklin & Marshall College Row Lancaster, PA Aimee Bashore Senior Thesis 2007Construction Management Expedited work Expedited work –Longer working hours –Weekend work Concrete protection Concrete protection –Temporary heaters –Steam hoses –Insulating blankets –Plastic window/opening covers Admixtures Admixtures Need to have a good temporary protection plan Need to have a good temporary protection plan Cold Weather Conclusions

29 Franklin & Marshall College Row Lancaster, PA Aimee Bashore Senior Thesis 2007Construction Management Analysis 1 – Building Information Modeling Analysis 1 – Building Information Modeling –Design phase: aid in visualization, reduce rework –Construction phase: ease coordination, reduce change orders –Lifecycle: ease maintenance operations and future renovations Analysis 2 – Composite Metal Deck v. Precast Plank Analysis 2 – Composite Metal Deck v. Precast Plank –Precast plank suited for residential and repetition projects –Precast plank would increase cost by 2%and decrease schedule by 3 weeks Analysis 3 – Cold Weather Construction Analysis 3 – Cold Weather Construction –Need a good temporary protection plan –Schedule can be reduced by expediting work Summary and Conclusions

30 Franklin & Marshall College Row Lancaster, PA Aimee Bashore Senior Thesis 2007Construction Management Questions? Acknowledgments Acknowledgments –Penn State AE Faculty –Penn State OPP Personnel –Alexander Building Construction, LLC –Campus Apartments, Inc –Elkus|Manfredi Architects –Franklin & Marshall College –BIM Questionnaire Participants –My Friends and Family