Connecting Dwarka with the NH8, the Expressway will bring Delhi and Gurgaon closer Currently, only 2 roads of connectivity between Delhi and Gurgaon-MG.

Similar presentations


Presentation on theme: "Connecting Dwarka with the NH8, the Expressway will bring Delhi and Gurgaon closer Currently, only 2 roads of connectivity between Delhi and Gurgaon-MG."— Presentation transcript:

1

2 Connecting Dwarka with the NH8, the Expressway will bring Delhi and Gurgaon closer Currently, only 2 roads of connectivity between Delhi and Gurgaon-MG Road and the NH8 Not enough to tackle the heavily increasing traffic of daily commuters between Delhi and Gurgaon A whole new corridor of connectivity

3 With Dwarka Expressway, connectivity becomes smoother, faster and so much easier! IGI airport - a mere 2.5 kms away Also bridges the gap between 16 new Residential Sectors A whole new corridor of connectivity

4 And this is how Gurgaon will soon look, when the Expressway opens up The changing face of Gurgaon

5

6 Planned around a world of opportunities and development Dwarka Expressway marks the beginning of a golden era in real estate Acts as a new channel of business and commerce between Delhi and Gurgaon World-class infrastructure and facilities to transform lives of residents and investors A catalyst of change and development

7 A result of years of planning, research and development by the best brains in real estate Aided by experts and top professionals in the Corporate and Government sector, a range of exciting projects in the residential and commercial space are already underway Years of thought and planning

8 No more toll for commuters between Delhi and Gurgaon! No more delays and traffic jams at the toll gate on NH8! All thanks to the toll plaza moving beyond Manesar shortly No more toll! No more delays!

9 From power-shortage to power-surplus, Haryana’s power supply improving massively 4 new power plants have been set up by the Haryana Government Power generation capacity of the state has increased from 1587 MW to 5800 MW in the last 5 years Power cuts are history

10 Reputed educational institutions flocking to areas surrounding the Expressway MatriKiran School under construction Modern School opening a branch in Sector 91, Gurgaon Other well-known schools of Delhi are currently looking to expand on this stretch Exciting opportunities in Education

11 Nationally and internationally famous healthcare organizations setting up branches around the Dwarka Expressway Reputed names in healthcare have/in process of finalizing Dwarka Expressway as the location of establishment Boom in Healthcare

12 All this adds up to making the Dwarka Expressway a new hub of exciting developments in real estate and the Golden Road!

13 18 kms long and 150 mtrs wide, with 60 mtrs of greenery on both sides, the Dwarka Expressway is 2x that of the NH8 14 kms out of the 18 kms is already constructed The widest road in the NCR

14 Constructed means black-topped and driveable The double yellow line indicates the constructed expressway Dwarka Expressway From Haryana From Delhi

15 Gurgaon - Manesar Urban Complex - 2025 AD

16 800 mtrs handed over to Indian Railways for construction of Rail over-bridge, with HUDA paying Railways Rs. 38 Crores in advance already (Expected Completion Time: 16 months) 700 mtrs under various HUDA utilities such as HT pillars and water works which HUDA is in the process of shifting (Expected Completion Time: 6 months) The balance 2.5 kms – has been resolved The Expressway today: The remaining 4 kms

17 On 30.9.2013, HUDA announced a rehabilitation policy which was published in the Times of India The latest on the 2.5 kms under stay order

18 People with built up homes / structures are being offered alternative plots in Sectors 110A and 37C The plots on offer are of the same size as the plots being taken over HUDA has already acquired 145 acres in the above 2 Sectors for this purpose Only 15 acres required to re-settle all the petitioners As Per Policy Published on 30.09.13

19 Applicants had till 30.10.2013 to apply under this policy HUDA has received applications from 80% of the residents on this stretch and is sorting them out All petitions expected to be resolved under this process in the next 3-4 months As Per Notice Published on 30.09.13

20

21 S.No. Chainage Length Clear Length Status Constructed / NOT Remarks Month of Handing Over FromTo 10468 Not ExecutedBuilt up Area- 2468750282 Executed End of Dec 11 375076515 Executed May-13 4765900135 Executed Dec-11 590096060 Executed May-13 696020001040 Executed End April 11 72000205050 Executed End April 11 82050207020 Executed 92070212050 ClearWMM II CompletedMid August 13 102120217050 Not ExecutedStay on Land 112170226090 ClearWMM II CompletedMid August 13 12226033501090 Executed End April 11 Actual availability of stretches (As per Actual Site condition)

22 S.No. Chainage Length Clear Length Status Constructed/ NOT Remarks Month of Handing Over FromTo 133350337020 HSIIDC drain 143370340030 Executed Jan-13 1534003975575 ExecutedReliance SEZ landJan-13 1639754100125 Executed Feb 12 1741004300200 Executed 184300431515 Pataudi Road 1943154425110 Executed 204425450075 Executed End April 11 21450066202120 Executed End April 11 22662078001180 Not Executed/ROB ROB, Padmini Factory. 2378008285485 Executed Mid Sep 11 248285834560 Not ExecutedHUDA water sump house 2583458750405 Executed Mid Sep 11

23 S.No. Chainage Length Clear Length Status Constructed/ NOT Remarks Month of Handing Over FromTo 268750880050 One side executed RHS stay on land 27880098201020 Executed Mid Oct 11 289820990080 Not ExecutedSTP Channel 29990010800900 Executed Water logged area completed Last week of Jan 13 301080011700900 Executed end April 11 31117001176060 Executed Mid Oct 11 3211760128501090 Executed Mid Oct 11 33128501290050 Executed Feb-13 341290013000100 Not ExecutedNipon Factory 35130001306060 Executed Feb-13 361306013400340 Executed Nov-11 371340013520120 Executed Nov-11 381352013650130 Executed Nov-11 39136501370050 Clear Slab approach is to be coming

24 40137001378080 Slab culvert over sewer channel is in progress by another contractor Work is stopped from last 2 month i.e on 6th Sep 2013 411378014320540 Executed 421432014900580 ClearWMM 1st layer completed 431490015300400 Not ExecutedNew Palam Vihar – R&R 441530015600300 Not ExecutedNew Palam Vihar – R&R 451560016000400 Not ExecutedNew Palam Vihar – R&R 461600016740740 Not ExecutedNew Palam Vihar – R&R 4716740180351295 Executed 01-Mar 1803514092 Clear Stretch14,092 mtrs. S.No. Chainage Length Clear Length Status Constructed/ NOT Remarks Month of Handing Over FromTo

25 Dwarka Expressway: The Delhi update

26 Thanks to DDA’s efforts, all issues related to land acquisition on Delhi side, resolved Remaining stretch of less than a Km to be ready within the next 6 months Dwarka Expressway: The Delhi update

27 All land issues on Delhi side resolved All issues pertaining to 2.5 kms on Gurgaon side soon to be resolved (Expected Timeline – January’2014) Soon, no more obstacles preventing investing in the Golden Road! All obstacles soon to vanish

28 Strike while hot! (Average rate per sq ft)

29 Some of the best and most trusted names in real estate singling out the Dwarka Expressway as the preferred location for various visionary projects Residential or commercial, most of these projects in full swing and nearing completion Besides, the best developers are building here

30 Glimpses of the Expressway

31

32 The golden road beckons Members of: