Presentation is loading. Please wait.

Presentation is loading. Please wait.

Deliver sD1 L4 Templates. D1.5 D1.5.1D1.5.3 INPUTS OUTPUTS Receive Order Information Evaluate Size vs. Modal Criteria D1.5.2 Identify Shipment Size Plan.

Similar presentations


Presentation on theme: "Deliver sD1 L4 Templates. D1.5 D1.5.1D1.5.3 INPUTS OUTPUTS Receive Order Information Evaluate Size vs. Modal Criteria D1.5.2 Identify Shipment Size Plan."— Presentation transcript:

1 Deliver sD1 L4 Templates

2 D1.5 D1.5.1D1.5.3 INPUTS OUTPUTS Receive Order Information Evaluate Size vs. Modal Criteria D1.5.2 Identify Shipment Size Plan And Build Loads Planning and Load Building – Process Template

3 D1.5 Plan And Build Loads D1.5.4D1.5.6 INPUTS OUTPUTS Planning and Load Building – Process Template Select Transport Mode Evaluate Loads Against “Efficiency” Criteria D1.5.5 Consolidate Outbound Shipments

4 D1.5 INPUTS OUTPUTS Page 6 of 6 D1.5.7 Notification Of Built Loads D1.6 Plan And Build Loads Planning and Load Building – Process Template

5 D1.6 Route Shipments D1.6.1D1.6.3 INPUTS OUTPUTS Routing Shipments – Process Template Consolidate Carrier Information Identify Available Carriers by Mode D1.6.2 Carrier and Route Optimization

6 D1.6 Route Shipments D1.6.4 INPUTS OUTPUTS Routing Shipments – Process Template Evaluate Criteria vs. Available Carrier Base D1.6.5 Identify Potential Carriers by Key criteria D1.7

7 Select Carriers & Rate Shipments D1.7.1D1.7.2D1.7.3 INPUTS OUTPUTS Tendering Load/Dispatch – Process Template Match Route w/ Available Carriers Evaluate by Service Matches Evaluate By Cost Matches

8 D1.7 Select Carriers & Rate Shipments INPUTS OUTPUTS D1.7.4D1.7.5 Bid Out to Match Carrier Bid Acceptance by Carrier D1.7.6 Choose Bid to Accept Tendering Load/Dispatch – Process Template

9 D1.7 Select Carriers & Rate Shipments INPUTS OUTPUTS D1.7.7 D1.7.8D1.7.9 Tender Load Accepted by Carrier Dispatch D1.9 Tendering Load/Dispatch – Process Template

10 D1.9 Pick Product INPUTS OUTPUTS D1.9.1 D1.9.2D1.9.3 Receive Picking Orders Plan Waves Print Pick Tickets Picking Stocked Product – Process Template

11 D1.9 INPUTS OUTPUTS D1.9.4 D1.9.5D1.9.6 Build Work Packages Assign Packages To Operators Operator Picks Product Picking Stocked Product – Process Template Pick Product

12 D1.9 INPUTS OUTPUTS D1.9.7 D1.9.8D1.9.9 Operator Packs Product Operator Stages Product Products Ready for Loading Pick Product D1.10 Picking Stocked Product – Process Template

13 D1.10 Load Vehicle Generate Ship Docs INPUTS OUTPUTS Tendering/Loading Material – Process Template D1.10.1 D1.10.2D1.10.3 Create BOL Loader Validates Load SL&C or Driver Validates

14 D1.10 Load Vehicle Generate Ship Docs INPUTS OUTPUTS Page 5 of 6 D1.10.4 D1.10.5D1.10.6 Load Vehicle Driver Signs BOL Carrier Transports Tendering/Loading Material – Process Template

15 D1.10 Load Vehicle Generate Ship Docs INPUTS OUTPUTS Page 6 of 6 D1.10.7 Carrier Delivers D1.11 Tendering/Loading Material – Process Template

16 Deliver sD1.1 L4 & L5 Samples

17 Quotation Process – SCOR D1.1

18

19

20

21


Download ppt "Deliver sD1 L4 Templates. D1.5 D1.5.1D1.5.3 INPUTS OUTPUTS Receive Order Information Evaluate Size vs. Modal Criteria D1.5.2 Identify Shipment Size Plan."

Similar presentations


Ads by Google