Presentation is loading. Please wait.

Presentation is loading. Please wait.

Printer Working Group Provo – December 2003 Plenary.

Similar presentations


Presentation on theme: "Printer Working Group Provo – December 2003 Plenary."— Presentation transcript:

1 Printer Working Group Provo – December 2003 Plenary

2 Provo Agenda Tuesday - WBMM 9:00-5:30 Wednesday Plenary 8:30-Noon Plenary 8:30-Noon Semantic Model 1:30-5:30 Semantic Model 1:30-5:30Thursday PSI 8:30-Noon PSI 8:30-Noon IPP-FAX; JobX and Extensions 1:30- 5:30 IPP-FAX; JobX and Extensions 1:30- 5:30 Friday – Notif/Discovery BOF 8:30-1:00

3 Jan / Feb Agenda Planning Wednesday – WBMM (should we go 2 days?) Thursday – Plenary / SM Friday – Other?

4 2004 Meeting Planning Guidelines Jan - Florida, Vegas or Microsoft Mar/April - D.C. June - Vancouver B.C / or Microsoft Aug - Montreal Fall – Madison, WI (Ira) December - San Diego Misc Above locations vs hosted meetings vs UPnP, FSG, PODi, CIP4 harmony

5 January 2004 MONTUEWEDTHUFRI 1 New Year 2 56 7 UPnP Vegas 89 12 IEEE 802 13 IEEE 802 14 IEEE 802 15 IEEE 802 16 IEEE 802 19 MLK 20212223 2627282930

6 February 2004 MONTUEWEDTHUFRI 23 4 xxx 5 xxx 6 xxx 9 PODi 10 PODi 11 PODi 1213 1617 18 Redmond (MSFT, DMTF); San Jose (ADBE) 19 Redmond (MSFT, DMTF); San Jose (ADBE) 20 Redmond (MSFT, DMTF); San Jose (ADBE) 2324252627

7 March 2004 MONTUEWEDTHUFRI 1 IETF 2 IETF 3 IETF 4 IETF 5 IETF 89 10 UPnP San Jose 1112 15 IEEE 802 16 IEEE 802 17 IEEE 802 18 IEEE 802 19 IEEE 802 2223242526 293031

8 April 2004 MONTUEWEDTHUFRI 12 5 D.C. 6 D.C. (FSG) 7 D.C. 8 D.C. 9 D.C. 1213141516 1920212223 262728 29 Green Day (JP) 30

9 May 2004 MONTUEWEDTHUFRI 3 National Day (JP) 45 6 Drupa 7 Drupa 10 Mothers Day; Drupa 11 Drupa 12 Drupa 13 Drupa 14 Drupa 17 Drupa 18 Drupa 19 Drupa 2021 24 Vancouver B.C.; Japan 25 Vancouver B.C.; Japan 26 Vancouver B.C.; Japan 27 Vancouver B.C.; Japan 28 Vancouver B.C.; Japan 31 Memorial Day

10 June 2004 MONTUEWEDTHUFRI 1234 7891011 1415161718 21 Fathers Day 22232425 282930

11 July 2004 MONTUEWEDTHUFRI 12 5 4 th of July 6789 12 IEEE 802; NYC 13 IEEE 802; NYC 14 IEEE 802; UPnP NYC 15 IEEE 802; NYC 16 IEEE 802; NYC 19 Montreal; Boston (Zoran) 20 Montreal; Boston (Zoran) 21 Montreal; Boston (Zoran) 22 Montreal; Boston (Zoran) 23 Montreal; Boston (Zoran) 2627282930

12 August 2004 MONTUEWEDTHUFRI 2 IETF 3 IETF 4 IETF 5 IETF 6 IETF 910111213 1617181920 2324252627 3031

13 September 2004 MONTUEWEDTHUFRI 123 6 Labor Day 78910 1314151617 20 Madison 21 Madison 22 Madison 23 Madison 24 Madison 2728 29 UPnP Munich 30

14 October 2004 MONTUEWEDTHUFRI 1 45678 1112131415 1819202122 2526 27 UPnP Redmond 2829

15 November 2004 MONTUEWEDTHUFRI 1 Halloween 2345 8 IETF 9 IETF 10 IETF 11 IETF 12 IETF 15 South Carolina; Austin (DMTF) 16 South Carolina; Austin (DMTF) 17 South Carolina; Austin (DMTF) 18 South Carolina; Austin (DMTF) 19 South Carolina; Austin (DMTF) 22 23 Thanksgiving (JP) 24 25 Thanksgiving 26 2930

16 December 2004 MONTUEWEDTHUFRI 123 678910 1314151617 202122 23 Emperor (JP) 24 Christmas Eve 27282930 31 New Years Eve

17 Steering Committee Recommendations Add PWG treasury report to Plenary Consider adding PWG officer - Marketing Consider twice yearly executive symposium Call for interest on new projects (Discovery, Notifications, IPP?, Fonts) Best Practices Coordination with other groups (UPnP) Try to coordinate better with Microsoft, FSG, W3C, Oasis and DMTF in 2004 Investigate additional opportunities to align with standards developing in consumer and high-end

18 ISTO PWG Report MembershipTreasury Members Page Check your logos Check your logos

19 PWG Officers One nominee per position Term ending September 2005 Chair – Harry Lewis Vice Chair – Lee Farrell Secretary – Jerry Thrasher Thanks to Bill Wagner – departing Secretary Thanks to Bill Wagner – departing Secretary

20 PWG Process Need to finish See pwg-process20-2003-1010

21 PWG Project Status CR Charter approved Charter approved Last Call completed on specification and best practice Last Call completed on specification and best practice Formal vote to close 12/19/2003 Formal vote to close 12/19/2003 No Interop planned (CS only) No Interop planned (CS only) Viewed as footnote to semantic model Viewed as footnote to semantic modelWBMM Charter approved Charter approved Preliminary draft of specification for Ops and Actions Preliminary draft of specification for Ops and Actions Continue to work on Schema for Report, Alert, Resources Continue to work on Schema for Report, Alert, Resources Work on requirements document Work on requirements document Harmony with CIM, WSDM a goal Harmony with CIM, WSDM a goalIFX Requirements spec & PDF/is in Last Call ending Jan 6, 2004 Requirements spec & PDF/is in Last Call ending Jan 6, 2004 IFX Protocol spec finishing up IFX Protocol spec finishing upXHTML-P Cross referencing CSS Print Profile Proposed Candidate Recommendation date March 2004PSI Final spec issued Last call scheduled following Provo meetingSM Document Object, JobX and Overides are published CS. SM in Last Call with few minor changes SM start final vote following Provo meeting Schema planned to become final after Provo Extension model under considerationMaint Printer/Finisher MIB and IANA Charset MIB in editors queue. Formal status pending final IANA considerations

22 PWG Reflectors CR (Character Repertoire) FIN (Finisher) IFX (IPP - Fax) IPP (Internet Printing Protocol) JMP (Job Monitoring MIB) P1394 (1394 Printing [inactive]) PS (Print Services) PWG (PWG Discussion) PWG-ANNOUNCE (PWG Announcements) SDP (Server Device Protocol [inactive]) SENSE (Asynchronous Notification [inactive]) SM (Semantic Model) UPD (Universal Printer Driver Format) WBMM (Web based device management) XP (XHTML-Print)

23 Related Standards PODi Open source PPML consumer Open source PPML consumer Standard Test suite / images Standard Test suite / imagesJDF Color extensions spec and IPP mapping Color extensions spec and IPP mappingFSG JTAPI, PAPI JTAPI, PAPIW3C Copyright agreement for XHTML-P Copyright agreement for XHTML-POasis Web Services Management Framework Web Services Management FrameworkUPnPDMTF


Download ppt "Printer Working Group Provo – December 2003 Plenary."

Similar presentations


Ads by Google