EUTFPWI Meeting 29-31/10/07 C.Lowry ITER Design Review Decisions Taken 5 Major Issues Identified 1.Blanket Redesign 2.Vertical Stability and Shape Control.

Similar presentations


Presentation on theme: "EUTFPWI Meeting 29-31/10/07 C.Lowry ITER Design Review Decisions Taken 5 Major Issues Identified 1.Blanket Redesign 2.Vertical Stability and Shape Control."— Presentation transcript:

1 EUTFPWI Meeting 29-31/10/07 C.Lowry ITER Design Review Decisions Taken 5 Major Issues Identified 1.Blanket Redesign 2.Vertical Stability and Shape Control 3.ELM and RWM Coils 4.Hot Cell and Test Requirements 5.Tritium and Dust

2 EUTFPWI Meeting 29-31/10/07 C.Lowry Blanket Re-design Main Issues with Blanket Design Refinement of Power Handling Requirements Installation and Remote Handling Constraints Keep vacuum vessel interfaces fixed Minimise changes to the baseline design

3 EUTFPWI Meeting 29-31/10/07 C.Lowry Steady State Wall Loads Parallel (װ) Perpendicular () ~1° Start-up & Ramp-down װ MW15 8 Type of InteractionUnits2001PIDLatest Proposal Outer Midplane RadiationMWm -2 0.5 Power Conducted between ELMs װ MWm -2 None 3 Power Conducted by ELMs װ MWm -2 None0.932.5 (3.4) Energy Conducted by ELMs װ MJm -2 None0.19 (0.93)0.06 (1.7) Near second X-point RadiationMWm -2 0.5 Power Conducted between ELMs װ MWm -2 None 5 Power Conducted by ELMs װ MWm -2 None3.833 Energy Conducted by ELMs װ MJm -2 None0.77 (3.8)0.8 (17) Baffle Region MARFEMWm -2 1.31.40.6

4 EUTFPWI Meeting 29-31/10/07 C.Lowry Wall Loads due to Off-normal events Parallel (װ) Perpendicular () ~1° Type of InteractionUnits2001PIDLatest Proposal (In progress) Plasma position perturbation װ MWm -2 None 150-250 Disruption TQ General װ MJm -2 0.361.6-18 + 0.24-0.48 1.1-18 Near second X-point װ MJm -2 None40-90 + 0.24-0.48 28-45 Disruption CQMJm -2 0.722.5 VDE EnergyMJm -2 60 None Energy װ MJm -2 None 100-680 Power װ MWm -2 None 600

5 EUTFPWI Meeting 29-31/10/07 C.Lowry Design Philosophy Shape first wall to shadow exposed edges Improve the hydraulic connector by providing larger access hole Details: Ports 18 poloidal bands of advanced standard modules ~100mm 8% or less degradation in power handling at upper X- point

6 EUTFPWI Meeting 29-31/10/07 C.Lowry Concept Under Construction Wall start-up is being considered, and first indications are encouraging An in-vessel detachable first wall has several advantages, and is being pursued

7 EUTFPWI Meeting 29-31/10/07 C.Lowry Original Shape Modified Shape Shifted inward by 9 cm li=1.1 – SOF 15 MA – full k Inward shift = 9cm Reference VS (6kV) Instability growth time goes from 71ms 37ms Outside control range, the plasma is vertically unstable Vertical Stabilisation and Plasma Position and Shape Control G.Saibene

8 EUTFPWI Meeting 29-31/10/07 C.Lowry Fast H-L transition ( loss in 1-2 s IW contact for up to ~ 5s) can lead to large loads on the inner wall Vertical Stabilisation and Plasma Position and Shape Control A.Loarte

9 EUTFPWI Meeting 29-31/10/07 C.Lowry Vertical Stabilisation and Plasma Position and Shape Control Stabilisation Increased Voltage Possibility was excluded on grounds of coil reliability Passive stabilisation being investigated, starting with assessment of forces

10 EUTFPWI Meeting 29-31/10/07 C.Lowry ELM and RWM Coils Wall Mounted Option Picture frame Concept Port Coil Concept Port plugs to be designed to allow retro-fit

11 EUTFPWI Meeting 29-31/10/07 C.Lowry Tritium and Dust Design Change Requests were submitted regarding both the measurement and removal of tritium and dust, and accepted for study DCRs 131 and 106 The importance of these issues was accepted, and C.Alejaldre, the DDG for Safety and Security has been charged to coordinate these activities and propose a workable solution. ITER material strategy Start ITER with carbon divertor and Be wall to allow a wide range of scoping studies Change to a W divertor before the end of the non-active phase to allow characterisation of the divertor prior to the active phase Watch This Space !

12 EUTFPWI Meeting 29-31/10/07 C.Lowry