Polarized 3 He Target Lab Update Presented by Xiaohui Zhan MIT Hall A Collaboration Meeting, Dec. 14, 2007
2
Outline: Oven/Support Structure NMR & EPR New Oven & Other Designs Optics Design & Orders Vertical Coils Test BigBite Frindge Field Investigation Software & Target Spin Sign Signal Cell Production To Do List Students: Chiranjib Dutta (UKY), Joe Katich (W&M), Xiaohui Zhan (MIT) Postdoc: Yi Qiang (DUKE)
3
Oven/Support Structure Support piece on the bottom was burned, install new support structure. Working well: ~250 o C. Old cell Carlos was installed for test. Oven Cell
4
NMR & EPR Tests Good NMR signal EPR underway…
5
New Oven/Optics Ordered from Technical Products, Inc.. New materical: CS85 Structural Insulation. Weigh 29lbs with supports (current oven ~ 45lbs). Oven and support design was done, installation in February. Optics design is done! Most optics components ordered and in house. 6 single FAP and 2 duo FAP in lab, one new duo and single were ordered. Alignment for 2 lasers was done for the tests.
6
Vertical Coils R = 94.62 cm Z: Beamline Y: Vertically up X: Normal to YZ Measured Volume Vertical Coil With 16A current, the average field generated by vertical coils is ~31 Gaus in Y direction (vertical). Most field gradients inside < 10mG/cm (absolute value). Large gradients (~20mG/cm) only happen at the edge of the volume.
7
BigBite Fringe Field Transver sity g2/d2(e,ed) Angle of BigBite -7 o 8o8o 2.8 o dBx/dx (mG/cm) 11.13.66.5 dBz/dz (mG/cm) -13.3-5.8-8.7 dBz/dx (mG/cm) 11.716.315.1 BigBite clamp reduces the gradients by half compared to previous measurements. But also introduce the mirror coils. Simulation was done (Yi Qiang).
8
Results of Simulation (Transversity) Gradient (mG/cm) dBx/dydBy/dzdBz/dxdBx/dxdBy/dydBz/dz By = 28 G Target Chamber 0.0±1.710.3±1.011.9±0.711.2±1.32.2±0.2-13.3±1.1 Pumping Chamber 0.7±0.67.9±0.813.5±0.49.7±0.60.8±1.0-10.5±0.6 By = -28 G Target Chamber -3.4±0.9-18.9±0.811.9±0.711.2±1.32.2±0.2-13.3±1.1 Pumping Chamber -4.6±0.7-17.6±0.812.1±0.311.4±0.52.8±1.1-14.2±0.9 Bx = 28 G Target Chamber -1.7±0.4-4.3±0.118.0±1.615.7±5.34.8±2.2-20.5±3.3 Pumping Chamber -2.4±1.1-2.8±1.418.4±1.315.5±1.2-0.8±2.1-14.7±1.8 Bx = -28 G Target Chamber -1.7±0.4-4.3±0.15.9±2.76.7±2.8-0.5±1.8-6.2±1.2 Pumping Chamber -1.5±1.2-6.3±1.47.2±1.45.5±1.34.5±2.1-10.0±1.6
9
Target Spin Sign Signal+DAQ Flip target spin every ~20min Hardware signal: goes to CODA datastream Software signal: LABVIEW to EPICS RF frequency monitoring & quarter-wave plate rotation monitor Cell Production 16 new cells were done! (8 from W&M and 8 from UVa) Most cell polarization > 40%, a few>50%, max~60% (W&M)
10
To Do List 1.New oven test with all new cells (NMR, EPR, Spin-Flip). 2.Cell characterization. 3.New pick-up coils inside the oven. 4.Target spin sign signal/DAQ. 5.Target IOC. 6.Software collection & analysis. Will be ready before installation in May 1st, 2008! Thanks to: Jian-Ping, Todd, Walfgang, Al, Susan, Jaideep, Ameya, Aidan…
Similar presentations
© 2018 SlidePlayer.com Inc.
All rights reserved.
Ppt on combination of resistances organization Ppt on fauna of italy Ppt on cartesian product sql Ppt on computer hardware and networking Ppt on reuse of waste materials What does appt only means of transportation Ppt on acute myeloid leukemia Ppt on bond length table Ppt on review of literature apa Ppt on machine translation service