3m + KRH timing inconsistency D Mott 14/04/2011. Using brigade 3m Stage2_UK_v004_RAW_dm1.ce (from KRH)

Similar presentations


Presentation on theme: "3m + KRH timing inconsistency D Mott 14/04/2011. Using brigade 3m Stage2_UK_v004_RAW_dm1.ce (from KRH)"— Presentation transcript:

1 3m + KRH timing inconsistency D Mott 14/04/2011

2 Using brigade 3m Stage2_UK_v004_RAW_dm1.ce (from KRH)

3 Importing KRH plan red timings means an inconsistency

4 Inconsistent timings induced inconsistency in brigade plan inconsistency in KRH plan (note that FPOL with NY is also inconsistent, the previous slide does not show this)

5 the task FPOL with NY has 1600 as earliest start (details removed) comes from top level estimates of timings - sy ld for krh has 1300 as earliest completion time, and this chain of tasks takes 300 in total a bug – should be more visible the task FPOL with NY has 1600 as earliest start

6 the task FPOL with NY has 1600 as earliest start (more details)

7 the task FPOL with NY has 1375 as latest start come from the KRH CE

8 Amendment? Why is: –the task named 'FIX en in PARIS' has 1600 as latest completion time. in the CE?

9 After removing fixed completion times from KRH plan these now seem to be underconstrained?