ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.

Similar presentations


Presentation on theme: "ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice."— Presentation transcript:

1 ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria A TERM PAPER ON WORKING RELATIONSHIP BETWEEN ARCHITECT AND QUANTITY SURVEYOR IN NIGERIA: SCOPE OF MUTUAL RESPONSIBILITIES AND AREA OF CONFLICT. BY ASEYAN BABAJIDE SUNDAY (ARC-07-0943)

2 ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria TABLE OF CONTENTS. 1.0INTRODUCTION 2.0WHO IS AN ARCHITECT 3.0WHO IS A QUANTITY SURVEYOR 4.0ROLES OF AN ARCHITECT 5.0ROLES OF A QUANTITY SURVEYOR

3 ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria TABLE OF CONTENTS CONTN. 6.0WORKING RELATIONSHIP BETWEEN THE ARCHITECT AND QUANTITY SURVEYOR 7.0AREA OF CONFLICT BETWEEN THE ARCHITECT AND THE QUANTITY SURVEYOR 8.0 CONCLUSION REFERENCES

4 ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria 1.0INTRODUCTION The roles of architect and the quantity surveyors in the building industry are complimentary to each other. They work as consultant’s seeing to the success of the project from the design brief to commissioning.

5 ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria 2.0WHO IS AN ARCHITECT 3.0WHO IS A QUANTITY SURVEYOR An architect is a person who translates the user’s needs into the builder’s requirements. A quantity surveyor control costs within construction projects “and may involve the use of a range of management procedures and technical tools to achieve this goal”.

6 ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria 4.0ROLES OF AN ARCHITECT  Handing over of site to contractor for commencement of work.  Approving contractors programme of work.  Checking and confirmation of setting out of building.  Coordination of consultants site activities.  Site inspection at least once a month.  Holding site meeting.  Etc.

7 ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria 5.0ROLES OF A QUANTITY SURVEYOR  Single rate approximate estimates.  Cost planning.  Procurement advice.  Measurement and quantification.  Document preparation, especially bills of quantity.  Etc.

8 ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria 6.0WORKING RELATIONSHIP BETWEEN THE ARCHITECT AND THE QUANTITY SURVEYORS This includes;  Sketch drawing and initial cost estimate.  Preparation and opening of tender.  Appraisal of tenders.  Interim valuation, approval and awarding of payment certificate.

9 ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria 7.0AREA OF CONFLICT  Architects design details.  How cost of the design relates to quality of finishes.  Construction methods and cost.  Design issues and aesthetics were often an area of conflict for both parties.

10 ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria 8.0CONCLUSION A successful project is very much depends on the construction professionals to act as an effective manager. They must be a good communicator in “handling and managing conflicts and negotiating terms with various stakeholders in the project”.