Presentation is loading. Please wait.

Presentation is loading. Please wait.

Selenium Removal from Mine Waters

Similar presentations


Presentation on theme: "Selenium Removal from Mine Waters"— Presentation transcript:

1 Selenium Removal from Mine Waters
Raymond J. Lovett, Ph.D. Environmental Chemist ShipShaper, LLP Morgantown, WV

2 SUPPORT National Mine Land Reclamation Center, West Virginia University United States Office of Surface Mining Magnum Coal Company Catenary Coal

3 Typical Southern West Virginia Mine Water
[Se] = 13 ug/L [Fe] = 0.15 mg/L [SO4-2] = 980 mg/L Alkalinity = 235 mg/L as CaCO3 pH = 7.1

4 Problems Overriding Concern Specific Problems for Treatment
Regulatory limit near 5 ug/L Specific Problems for Treatment Low level of Se Differing chemistries Selenate, SeO4-2, Se(VI) Selenite, SeO3-2, Se(IV)

5 Selenium Removal Difficulties
Different dissolved species No direct precipitation chemistries Reduction of selenate is difficult (slow) Sulfate may interfere

6 Treatment System Objectives
Effluent maximally 5 ug/L Se Low installation cost Low operating cost Passive

7 Demonstrated Chemistries
Adsorption or co-precipitation by Fe(III) hydroxides Biological (bacterial reduction) Reverse osmosis Reduction by Fe(0)

8 Reduction with Iron Metal
SeO4-2 +Fe(0) => Fe(II,III) +Se(0) SeO3-2 +Fe(0) => Fe(II,III) +Se(0)

9 Selenium Species on Iron

10 Field Trial Catenary Coal
Test in a real setting Real, variable input chemistry Continuous Se Input

11 Field Trial System

12 Field Trial System

13

14

15

16

17

18 Catenary Post Trial 1

19 Catenary Post Trial 2

20 Catenary Post Trial 3

21 Catenary Post Trial 4

22 Catenary Post Trial 5

23 Reduction with Iron Metal
Potential Removal of selenate and selenite Passive Problems Iron Oxides/ Dissolved Fe, Mn Exhaustion Passivation Expense (surface area)

24 Bacterial Estimated Cost
Flow = 285 gpm Capital Cost = $7.2 to $10 million O&M = Unknown

25 Reverse Osmosis Estimated Cost
Flow = 200 gpm Capital Costs = $1.2 million O&M = $5.85 million/year

26 Iron Hydroxide Estimated Cost
Flow = 200 gpm Capital Cost = $0.69 to 1.03 million O&M = $1.39 million/year

27 Zerovalent Iron Estimated Cost
Flow = 250 gpm* Capital costs = $478,000 O&M = $150,000 to $300,000 * Gravity flow, includes surge

28 Conclusions Iron metal removes selenate and selenite, but currently requires long contact times Manganese and iron generated Temperature sensitive (?) Less expensive than other methods


Download ppt "Selenium Removal from Mine Waters"

Similar presentations


Ads by Google