AMS TIM, CERN Apr 12, 2005 AMS Computing and Ground Centers Status Report Alexei Klimentov —

Similar presentations


Presentation on theme: "AMS TIM, CERN Apr 12, 2005 AMS Computing and Ground Centers Status Report Alexei Klimentov —"— Presentation transcript:

1 AMS TIM, CERN Apr 12, 2005 AMS Computing and Ground Centers Status Report Alexei Klimentov — Alexei.Klimentov@cern.ch

2 2 Alexei Klimentov. AMS TIM @ CERN. Apr 2005. Outline  AMS Computing and Ground Centers  AMS@CERN - Regional Centers Data Transfer (J.Gong/M.Boschini) AMS@CERN  Offline and Analysis Software (J.Alcaraz)

3 3 Alexei Klimentov. AMS TIM @ CERN. Apr 2005. AMS-02 Ground Support Systems Payload Operations Control Center (POCC) at CERN (first 2-3 months in Houston) CERN Bldg.892 wing A “control room”, usual source of commands receives Health & Status (H&S), monitoring and science data in real-time receives NASA video voice communication with NASA flight operations Backup Control Station at JSC (TBD) Monitor Station in MIT “backup” of “control room” receives Health & Status (H&S) and monitoring data in real-time voice communication with NASA flight operations Science Operations Center (SOC) at CERN (first 2-3 months in Houston) CERN Bldg.892 wing A receives the complete copy of ALL data data processing and science analysis data archiving and distribution to Universities and Laboratories Ground Support Computers (GSC) at Marshall Space Flight Center receives data from NASA -> buffer -> retransmit to Science Center Regional Centers analysis facilities to support geographically close Universities

4 4 Alexei Klimentov. AMS TIM @ CERN. Apr 2005.

5 5 AMS-02 Computing  Computing requirements, architecture and cost estimation http://ams.cern.ch/AMS/Reports/AMSnote- 2002_01_02.pdf http://ams.cern.ch/AMS/Reports/AMSnote- 2002_01_02.pdf  SW and technology evaluation –Cluster solution »AMS / Elonex joint project »SW evaluation (V.Choutko)  Distributed data analysis issue –ROOT and AMS Root packages for bulk data analysis in cluster and single node environment (D.Grandi, N.Sevilla, P.Zuccon)

6 6 Alexei Klimentov. AMS TIM @ CERN. Apr 2005. AMS-02 Computing. SOC. 1/3  SOC prototype is running –Analysis, processing and data store facilities –DB and Web services –Data transfer station (INFN Milano) –MC production and Analysis SW –Users support  CERN started Bldg.892 basement refurbishment –SOC prototype will be moved from “even” partition to “odd” partition in May/June  Manpower issue will be discussed LR-24 months (draft is ready)  Bulk of computers and disks purchasing LR – 12 months –LR-24 months SOC prototype (cluster or traditional solution)

7 7 Alexei Klimentov. AMS TIM @ CERN. Apr 2005. AMS-02 Computing. SOC. 2/3  SW (working prototypes are in production) –Data transmission (M.Boschin, A.Eline, J.Gong, A.Klimentov,H.Wu) –Data processing framework (V.Choumilov, V.Choutko, A.Klimentov) –Analysis (J.Alcaraz, V,Choutko) –DataBase (A.Klimentov)  Cluster Solution for AMS-02 SOC –HW evaluation »AMS/Elonex joint project (6 months May- Nov 2005) »V.Choutko, A.Eline, A.Klimentov, SEU –SW evaluation »System SW - done (V.Choutko) »Application SW for AMS distributed data analysis – in progress (J.Alcaraz,V.Choutko,D.Grandi, N.Sevilla, P.Zuccon)

8 8 Alexei Klimentov. AMS TIM @ CERN. Apr 2005. AMS-02 Computing. SOC. 3/3  MC Production (period 2005A and 2005B) –Some minor problems with SW releases –Stable run for more than a year –Aachen request for AMS-01 MC production (background study for positron selection from converted bremsstrahlung gammas) - fulfilled –18 AMS Universities and labs (more coming) –Manpower ( O.Kounina volunteered to work as MC production manager )

9 9 Alexei Klimentov. AMS TIM @ CERN. Apr 2005. Year 2005 MC Production  MC Production started Jan 15, 2004  Central MC Database  Distributed MC Production  Central MC storage and archiving  Distributed access (under test)

10 10 Alexei Klimentov. AMS TIM @ CERN. Apr 2005. MC Production Statistics URL: pcamss0.cern.ch/mm.html ParticleMillion Events protons 3264 Helium 233.2 electrons 39.3 deuterons 42.3 positrons 7 Anti-protons 0.8 Carbon 1.8 gammas 60.1 nucleis 41.2

11 11 Alexei Klimentov. AMS TIM @ CERN. Apr 2005. AMS-02 Computing. GSC@MSFC.  Architecture - defined  Operations issues – agreed with MSFC personnel  NASA HOSC/POIC – AMS GSC – tbd, manpower tbd  Data transmission (MSFC-MIT, MSFC-AMS@CERN)MSFC-AMS@CERN –Tests conducted in 2003 –More tests beg 2006 (NASA and HEP network upgraded) –SW is ready and in production for AMS MC data transmission

12 12 Alexei Klimentov. AMS TIM @ CERN. Apr 2005. AMS-02 Computing. POCC.  Architecture – defined  Software –Commanding (TReK ?) –Online monitoring –Data validation and online processing – prototype in production (V.Choutko) –Voice communication with NASA (tested, G.Carosi)

13 13 Alexei Klimentov. AMS TIM @ CERN. Apr 2005. Outline  AMS Computing and Ground Centers  AMS@CERN - Regional Centers Data Transfer (J.Gong/M.Boschini) AMS@CERN  Offline and Analysis Software (J.Alcaraz)


Download ppt "AMS TIM, CERN Apr 12, 2005 AMS Computing and Ground Centers Status Report Alexei Klimentov —"