Presentation is loading. Please wait.

Presentation is loading. Please wait.

Overview of the IEEE Process. Overview of Process l Project Approval l Develop Draft Standards l Ballot Draft l IEEE-SA Standards Board Approval l Publish.

Similar presentations


Presentation on theme: "Overview of the IEEE Process. Overview of Process l Project Approval l Develop Draft Standards l Ballot Draft l IEEE-SA Standards Board Approval l Publish."— Presentation transcript:

1 Overview of the IEEE Process

2 Overview of Process l Project Approval l Develop Draft Standards l Ballot Draft l IEEE-SA Standards Board Approval l Publish Standard l Resources

3 Overview of Process contd

4 Introduction l Staff Liaison l Answers questions about procedures l Along with chair, ensures that procedures are followed l Keeps you informed l New products l New services l Policy changes l Brings your ideas and concerns to the Standards Board and its committees

5 Project Approval Process

6 Project Authorization Request (PAR) Submission Staff Contact: NesCom Secretary – Sherry Hampton s.hampton@ieee.org +1 (732) 562-6003 l The PAR is a legal document l The PAR is the authorization of work by the IEEE-SA Standards Board l IEEE extends the umbrella of indemnification to people working on an authorized standards project, if they follow the rules

7 Tips on Completing Your PAR l Spell out all acronyms l Be clear and succinct in your scope and purpose l Copyright agreement l Be aware of coordination l Check appropriate category for document

8 Development of the Draft Standard

9 Tips for Draft Development l Develop an outline l Assign writing among working group members l Technical editor gathers inputs and ensures technical consistency l Avoid writing document in meetings l Working with an IEEE Project Editor speeds the project l Refer to IEEE Standards Style Manual for document structure and utulize draft template.

10 Sponsor Balloting

11 Sponsor Ballot Service l Staff Contact: Electronic Balloting Specalist – Penny Stanton, Balloting Center +1 (732) 562-6532 l IEEE Standards Department provides a sponsor ballot service

12 Sponsor Forms a Balloting Group l Issue invitation to ballot l Specifies responsibilities of balloters l Requests classifications (P, U, G, GI, A) l Sponsor approves balance l No one interest category can be 50% or more l Once balloting begins, the balloting group remains static l IEEE-SA membership or payment of a fee is required in order to ballot

13 Response and Results of Balloting l Response l Need 75% return l Ballot fails with less than 75% return l Results l Need 75% approval l Attempt to resolve negative ballots l No mandate to resolve all ballots l After consensus (75% approval) is reached, establish 60- or 90-day timeline for resolution of comments l Recirculate revised draft and comments l Prepare report for RevCom l Show evidence of attempts to resolve each Must Be Satisfied comment associated to negative ballot l Show evidence and results of recirculation

14 Approval of the Draft Standard

15 How to Complete a Successful RevCom Submission CONTACT: RevCom Secretary – Dave Ringle, +1 (732) 562-3806 l Review Committee (RevCom) recommends action to the Standards Board l Submittal must match information on PAR l When is a revised PAR necessary? l Any substantive change, i.e., scope, title, l Proof of mandatory coordination l SCC10, SCC14 and Editorial

16 Post-Approval and Publication

17 l IEEE Project Editor l Does final copy edit of text l Ensures that technical integrity of document is maintained l Formats electronic text into proofs l Committee review l Correction l Publication l Complimentary copies and awards

18 Resources l IEEE-SA Standards Board Bylaws l IEEE-SA Standards Board Operations Manual l IEEE Standards Companion l IEEE Standards Style Manual l Working Guide for Submittal of PAR and PAR Form l Working Guide for Submittal of Proposed Standards and Submittal Form l Standard Development Online

19 Electronic Resources l Web l http://standards.ieee.org/ http://standards.ieee.org/ l myProject - https://development.standards.ieee.org/my-site https://development.standards.ieee.org/my-site l Public and private areas available for IEEE standards working groups l Mailing lists l Electronic mailfirst initial.last name@ieee.org l Contact the Electronic Services group at spa- admin@ieee.org

20 For more information on Overview of Process Contact your staff liaison OR Standards Development Online: http://standards.ieee.org/resources/development/index.html


Download ppt "Overview of the IEEE Process. Overview of Process l Project Approval l Develop Draft Standards l Ballot Draft l IEEE-SA Standards Board Approval l Publish."

Similar presentations


Ads by Google