1 Marco Echeverria Society of Hispanic Professional Engineers

2 Role Definition Planning Phase Development and Testing Phase Process Validation Deliverables Simulation Overview Simulation in Training Process Q & A

3 After 10 years and $ 230,000, Guy makes his own Boeing 747 Flight Simulator

4 After 6 months and 1000 lh, guy and gal have a plant floor simulator Control Room HMI Simulation Virtual Controllers Process Management and Data acquisition and Data acquisition Systems Systems

5 Simulationsupports ProcessEngineeringqualifies ControlsEngineeringleads Defines controls platform Identifies Controls components Establish Controls Standards. Device Behavior Library Unit Behavior Library Identify custom process requirements Process knowledge. Process Knowledge Process parameters Tuning parameters Project limits.

6 Development Phase Scope of Work + Contractor imbedded Project Responsibilities Contractor imbedded Project Responsibilities Simulation Phase Definition Simulation Phase Definition Simulation Configuration Simulation Configuration Tests Definition Tests Definition Process Validation Process Validation Ongoing Tests Ongoing Tests Factory Acceptance Test Factory Acceptance Test Deliverables. Deliverables. Device Simulation Configuration Controls Programming & HMI configuration Unit Simulation Configuration Validation Phase Automatic Device Tests Test Definition Process Validation Change Management Custom Process Tests Fine tuning FAT

7 Partial simulation blocks with small projects + Device Simulation Configuration Controls Programming & HMI configuration Unit Simulation Configuration Development Phase Validation Phase Automatic Device Tests Custom Process Tests Fine tuning Test Definition Process Validation Change Management CIP Continuous Improvement and training simulation environment Or Complete simulation environment in grass roots project

8 Prevent Defects Risk Management Defects found and fixed Root cause analysis Automatic Device Tests + Development Phase Validation Phase Custom Process Tests Fine tuning CIP Continuous Improvement Process

9 Webex Webex (Internet / Intranet) Recognized as simple to configure and utilize Recognized in bringing people together to solve functional problems clearly and effectively Recognized as a Unique testing platform for Information systems that depend on a running, data generating system. Startups begin earlier, in a simulated fashion. Start-up Punch lists are created earlier and contractors are held in closer control to minimize startup delays. Simulations created in one project have been used as the basis for another. Simulation, builds assets: Testing and Training Assets.

10 Webex Webex (Internet / Intranet) Training sessions may be held anywhere it is most desirable. Complete Systems utilizing core components. Engineering equipment is fully utilized.

11 …Reduce Startup Simulation as a Q A Tool Spend more time in simulation and testing …Build Simulation Asset

12 Q & A