Presentation is loading. Please wait.

Presentation is loading. Please wait.

Chapter Overview 18 June 2009 North Star Chapter 1 2009 Program Theme Practical Applications of Systems Engineering Emphasis – The Program Life Cycle.

Similar presentations


Presentation on theme: "Chapter Overview 18 June 2009 North Star Chapter 1 2009 Program Theme Practical Applications of Systems Engineering Emphasis – The Program Life Cycle."— Presentation transcript:

1 Chapter Overview 18 June 2009 North Star Chapter 1 2009 Program Theme Practical Applications of Systems Engineering Emphasis – The Program Life Cycle

2 Chapter Overview 18 June 2009 North Star Chapter 2 Tonights Agenda 6:15 PM – Registration, Networking, Timber Lodge Appetizers 6:45 PM – Welcome and Chapter Overview Neill Radke, Chapter Co-President 7:00 PM – Application of a Global Systems Engineering Competency Framework; INCOSE 2009 Paper Eileen Arnold 7:45 PM – Personal Rapid Transit Design and Progress Dr. Ed Anderson 8:30 PM – Adjourn

3 Chapter Overview 18 June 2009 North Star Chapter 3 Chapter Calendar Chapter Organization Chapter Communications INCOSE Events SE Certification Job Opportunities Chapter Meeting

4 Chapter Overview 18 June 2009 North Star Chapter 4 8 January – SE Initiatives at Starkey Labs, with a detailed tour of the Starkey facilities Starkey Laboratories 12 February – SE in Production Systems with a tour of the PaR Facilities PaR Systems 12 March – SE in a Student Project Wayzata High School 16 April – SE in Determining Interfaces Medtronic (MTS Corporation as Host) 28 May – SE in the Solar House Student Project National Competition University of Minnesota 18 June – Dry run of papers for INCOSE 2009 plus a special report on worldwide progress in developing the Personal Rapid Transit – PRT - System Eden Prairie Timber Lodge 2009 Meeting Calendar

5 Chapter Overview 18 June 2009 North Star Chapter 5 12 July – The North Star Summer Social, including IS 2009 Debrief Lake Minnetonka Cruise on the 1906 Steamboat Minnehaha Dinner at Biella Italian Restaurant - Excelsior 13 August – SE in Operations and Maintenance Xcel Energy 10 September – SE in Determining Architecture Eaton Corporation 8 October – SE in Architecture and Trade Studies Lockheed 12 November – SE in Requirements Development Honeywell 13 December – Annual North Star Holiday Party Place - TBD 2009 Meeting Calendar

6 Chapter Overview 18 June 2009 North Star Chapter 6 Why sign in? For the past several years we have had the chapter incentive program to encourage attendance at our meetings. For 2009, two $25 gift certificates for the TimberLodge Restaurant will be awarded to any member attending six or more regular meetings or who brings one new member into the chapter. For guests or members attending for the first time, this also insures your notification by email of all subsequent events. Attendance BE SURE AND SIGN THE ATTENDANCE LIST! PLEASE WRITE SO WE CAN READ IT!!

7 Chapter Overview 18 June 2009 North Star Chapter Attendance at our meetings is Growing but so is the cost of Pizza (and Timber Lodge appetizers!) We will continue to have networking time and serve appetizers and soft drinks. We ask that you help us a bit by making a voluntary donation. You decide if and the amount and place it in the gold box. Donations 7 Many thanks, your response so far has been most helpful

8 Chapter Overview 18 June 2009 North Star Chapter Topic: System Integration, Test, Evaluation (SITE) –Introduction to SITE –SITE Entry Criteria –Preparation for SITE –SITE Conduct –SITE Exit Criteria –System Validation –SITE Programmatic and Technical Planning Presenter: Charles Wasson Date: Saturday, 14 November Place: Lockheed Martin, Eagan, MN Fall Tutorial Early Alert! 8

9 Chapter Overview 18 June 2009 North Star Chapter 2009 Chapter Organization INCOSE Certification Advisory Group (CAG) Eileen Arnold – Chair CAG Project Manager Dave Walden Contact Eileen Arnold Systems Science SE Technical Process Architecture SE Management Process Requirements Risk SE Support Processes Measurement Modeling & Tools Specialty Engineering Application Sectors President Neill Radke & John Palmer Secretary Bob Hunter Treasurer Mark Elpers Dir. Industry Mark Feitel President Elect Mark Elpers Past President Elliot Abrons Dir. Acad/Govt Eileen Arnold North Star Leadership Communication Eileen Arnold Technical Operations

10 Chapter Overview 18 June 2009 North Star Chapter Communication North Star Chapter Web Site: www.incose.org/northstar North Star Newsletter – The Integrator –June 2009 issue to be published and viewable/downloadable on 21 June North Star Chapter Meeting Information –Charts from past meetings are viewable and downloadable on the website

11 Chapter Overview 18 June 2009 North Star Chapter 11 INCOSE Events Details online @http://www.incose.org June 22 – 26, 2009: PSM (Practical Software and Systems Measurement ) Orlando, Florida July 15, 2009: Terminal 5 Rail Project: An Untold Success Story INCOSE Webinar July 19 - 23, 2009: INCOSE International Symposium Singapore July 11 - 15, 2010: INCOSE International Symposium Chicago

12 Chapter Overview 8 May 2008 North Star Chapter Chapter Overview 18 June 2009 Professional Certification Program International Council on Systems Engineering has established a multi-level Professional Certification Program to provide a formal method for recognizing the knowledge and experience of systems engineers, regardless of where they may be in their career.

13 Chapter Overview 18 June 2009 North Star Chapter For opportunities, either with your company or that you know of: Go to www.incose.orgwww.incose.org –Select Education and Careers –Select Post a Job –Create an account –Post job openings –Select View Jobs to see the listings Job Opportunities 13

14 Chapter Overview 18 June 2009 North Star Chapter ISO 15288 Systems Engineering Project Life Cycle Stakeholder Requirements Definition VerificationRequirements Analysis Transition Architectural Design Validation Implementation Operation Integration Maintenance Disposal Project PlanningProject Assessment Project Control Decision MakingRisk ManagementConfiguration Management Information Management Stakeholder Requirements Definition VerificationRequirements Analysis Transition Architectural Design Validation Implementation Operation Integration Maintenance Disposal Enterprise Environment Management System Life Cycle Process Management Quality Management Resource ManagementInvestment Management Supply Acquisition

15 Chapter Overview 18 June 2009 North Star Chapter Eileen Arnold, CSEP-ASQ, is currently a principal systems engineer at BAE Systems in Fridley, Minnesota. She has 29 years of experience in the engineering and management of HW, SW, and Systems to include product development, modeling and simulation, SE competency, measurement/analysis, and systems life cycle process for both the commercial and defense sector. She is currently Co-Chair of the INCOSE Certification Advisory Group (CAG). She helped start the INCOSE Heartland Chapter and is most active in the North Star Chapter acting as the Director of Government and Academia, editor of the chapter newsletter The Integrator and as web master of the chapter web site. She has been President of both Chapters. Eileen Arnold 15

16 Chapter Overview 18 June 2009 North Star Chapter Dr. Ed Anderson was a professor of Mechanical Engineering at the U of MN for 23 years where he worked on the theory and application of Personal Rapid Transit (PRT) systems. He chaired four international conferences on PRT, lectured and gave courses widely in the U. S. and abroad on transit systems analysis and design, authored the textbook Transit Systems Theory, and published over 100 technical papers, mostly on PRT topics. In 1981, he initiated the design of a new PRT system, and in 1986, he moved to Boston University as a Professor of Aerospace and Mechanical Engineering where he formed an industry team with members from five Boston-area companies to carry his PRT design to the point that in 1989 it attracted the attention of the Chicago RTA and Raytheon Company. In 1994, he moved back to the Minneapolis area where he has continued to work on commercialization of his system, which he now calls an Intelligent Transportation Network System (ITNS). Ed Anderson 16


Download ppt "Chapter Overview 18 June 2009 North Star Chapter 1 2009 Program Theme Practical Applications of Systems Engineering Emphasis – The Program Life Cycle."

Similar presentations


Ads by Google