ECE 477 Design Review Group 11  Spring 2005 Paul Dulle Pat McLaughlin Randy Scheifele Chad Bjorklund David Meyer.

Similar presentations


Presentation on theme: "ECE 477 Design Review Group 11  Spring 2005 Paul Dulle Pat McLaughlin Randy Scheifele Chad Bjorklund David Meyer."— Presentation transcript:

1 ECE 477 Design Review Group 11  Spring 2005 Paul Dulle Pat McLaughlin Randy Scheifele Chad Bjorklund David Meyer

2 Outline Project overviewProject overview Project-specific success criteriaProject-specific success criteria Block diagramBlock diagram Component selection rationaleComponent selection rationale Packaging designPackaging design Schematic and theory of operationSchematic and theory of operation Preliminary PCB layoutPreliminary PCB layout Software design/development statusSoftware design/development status Project completion timelineProject completion timeline Questions / discussionQuestions / discussion

3 Project Overview MAVerick (Motorized Assault Vehicle) is a mobile gun platform controlled by a cellular phone that has the ability to establish full-duplex communication with a command center in order to transmit control and status signals. It will contain a paintball gun attached to the platform which will fire at moving targets and have the ability to detect obstacles.

4 Project-Specific Success Criteria ability to detect moving targets using an ultrasonic/IR sensor ability to identify and detect obstacles ability to encode and send control signals through a cellular phone to control the tank/gun ability to receive and decode control signals from the cellular ability to send status information from the tank to the controlling device

5 Block Diagram

6 Component Selection Rationale Microcontroller

7 Component Selection Rationale DTMF Encoder DTMF Decoder

8 Component Selection Rationale Ultrasonic Sensor

9 Packaging Design The MAVerick will be packaged in the above pictured tank. The turret will be removed and replaced by a paintball gun. The circuit board and all wires will be housed inside of the tank. All sensors will be mounted on the outside of the tank as seen in the next figure.

10 Length of Tank = 27” Width of Tank= 12” Length of Paintball Gun = 19” The numbers on the drawing correspond to the components in the parts list. Figure 1: Overhead view of tank concept drawing.

11 Width of base = 6” Length of base = 6” Height of base = 2”

12 1. Atmel Mega16 Microprocessor 2negligible13.12 2. Remote Control Tank 1859.00 3. Brass Eagle Marauder Paintball Gun 11.333.45 4. Top Gun Joystick 1.832.45 5. Motokata Wireless Reversing & Parking Sensor 4.3519.00 6. Ademco Infrared Motion Sensor 3.4524.60 7. DTMF Encoder ICS5089 4negligible5.00 8. DTMF Decoder 4negligible16.00 9. Senscomp Ultrasonic Sensor 615088 1.4155.00 10. Senscomp Ultrasonic Housing 619395 1negligible7.50 11. Link Actuator 1.35.50 12. Linksys Wireless-B Internet Video Camera 1.38106.91 13. Minebea Stepper Motor 2.47.90 Major Parts(more than $1) Number Total Weight(lbs.) Total Cost(US $)

13 Schematic/ Theory of Operation Motor ControlMotor Control

14 Schematic/ Theory of Operation Stepper Motor ControlStepper Motor Control

15 DTMF CircuitsDTMF Circuits Schematic/ Theory of Operation

16 Ultrasonic SensorUltrasonic Sensor Schematic/ Theory of Operation

17 JoystickJoystick Schematic/ Theory of Operation

18 MicrocontrollerMicrocontroller

19 Schematic/ Theory of Operation HeadersHeaders

20 Preliminary PCB Layout Command CenterCommand Center

21 Preliminary PCB Layout TankTank

22 Software Design/ Development Status TankTank

23 Software Design/ Development Status Command CenterCommand Center

24 Project Completion Timeline PCB Layout – Done by March 7 thPCB Layout – Done by March 7 th Board Population – Done by March 24 thBoard Population – Done by March 24 th Physical Construction – Done by March 31 stPhysical Construction – Done by March 31 st Software Development – Done by April 19 thSoftware Development – Done by April 19 th Senior Design Report – Done by May 2 ndSenior Design Report – Done by May 2 nd

25 Questions / Discussion