Presentation is loading. Please wait.

Presentation is loading. Please wait.

Axel Pawlik. APNIC 16, 22 August, Seoul. 1 RIPE NCC Update.

Similar presentations


Presentation on theme: "Axel Pawlik. APNIC 16, 22 August, Seoul. 1 RIPE NCC Update."— Presentation transcript:

1 Axel Pawlik. APNIC 16, 22 August, Seoul. http://www.ripe.net 1 RIPE NCC Update

2 Axel Pawlik. APNIC 16, 22 August, Seoul. http://www.ripe.net 2 Droogte in Nederland en record lage waterstanden (links) In de ochtenduren van 17 augustus bereikte de waterstand in de Rijn een historisch dieptepunt. Bij Lobith werd 7,17 meter boven NAP gemeten. Het oude record was 7,22 meter op 13 september 1991. De lage waterstanden in de grote rivieren worden slechts voor een klein deel bepaald door de actuele droog in Nederland, maar wordt vooral bepaald door de neerslag in de stroomgebieden van de rivieren. De droogte in Zuid-Europa past in de computerverwachtingen van het toekomstig klimaat. In het veranderende klimaat neemt hier de kans op zomerdroogte toe. Uit de metingen van de laatste jaren blijkt dat nog niet maar volgens de prognoses voor Zuid-Europa wordt niet alleen een toename verwacht van zware neerslag maar ook een afname van de zomerneerslag van mogelijk 20%. (zie ook watertekorten in waterrijk Nederland en de droogtestudie)(linkshistorisch droogte in Zuid-Europaveranderende klimaat watertekorten in waterrijk Nederland droogtestudie Dried in the Netherlands and record low water positions

3 Axel Pawlik. APNIC 16, 22 August, Seoul. http://www.ripe.net 3 Executive Board Who Is Who An Organisational Update Managing Director CTO Chief Scientist CFOHead Member Services

4 Axel Pawlik. APNIC 16, 22 August, Seoul. http://www.ripe.net 4 Registration Services Steady response time to resource requests –2 days or less for last year Improving resolution times –90% within 8 days Telephone contact –Call back service –Proactive telephone calls

5 Axel Pawlik. APNIC 16, 22 August, Seoul. http://www.ripe.net 5 Policy Update New Address Policy WG –LIR-WG split into 2 new WGs and mailing lists Updated IPv4 document (draft) –http://www.ripe.net/ripe/draft-documents/ipv4- policies.htmlhttp://www.ripe.net/ripe/draft-documents/ipv4- policies.html Update to status: attribute (values) –http://www.ripe.net/ripe/draft-documents/status- attributes.htmlhttp://www.ripe.net/ripe/draft-documents/status- attributes.html –Will develop proposal in co-operation with APNIC

6 Axel Pawlik. APNIC 16, 22 August, Seoul. http://www.ripe.net 6 LIR Portal Membership service Simplified resource request forms –Calculating forms –Interactive help function Allocation Editor –Lets LIRs update allocation inetnum objects directly PKI login –Secure certificate Tools –Useful utilities https://lirportal.ripe.net/

7 Axel Pawlik. APNIC 16, 22 August, Seoul. http://www.ripe.net 7 k Root Developments AMS-IX instance of k.root-servers.net online –Proof of concept complete –Marks the beginning of anycast k root service Investigating next phase –Deployment of more instances k.root-servers.org website updated with more routing policy information

8 Axel Pawlik. APNIC 16, 22 August, Seoul. http://www.ripe.net 8 Membership Liaison Membership Liaison Officer responsibilities: –Liaison activities and regional support for RIPE NCC members –Developing communication channels for member feedback –Improving interaction between RIPE NCC and members Projects: –RIPE NCC regional meeting in the Middle East Dubai, UAE, 7-9 December 2003 –Actively seek input from members –Support for RIPE NCC Services WG & RIPE Meetings –Collaboration with RIRs on membership issues

9 Axel Pawlik. APNIC 16, 22 August, Seoul. http://www.ripe.net 9 Information Services RIPE NCC has been collecting data since its inception –Hostcount, TTM, RIS, … 10 years, time to revisit and adjust direction Strategy paper: RIPE 271, RIPE NCC Hostcount in the 21 st century: –Measurements are necessary for long and short term operations –RIPE NCC is ideally suited to do them –Results should be made public –Results should be easy to use in daily operations

10 Axel Pawlik. APNIC 16, 22 August, Seoul. http://www.ripe.net 10 Changes in the coming months Central entry point for all statistics maintained by the RIPE NCC –Uniform data formats –Consistent myASN feature added to the RIS TTM will become an open service DNS monitoring added Incident response procedure and team Suggestions and ideas: tt-wg@ripe.net

11 Axel Pawlik. APNIC 16, 22 August, Seoul. http://www.ripe.net 11 X.509 for RIPE NCC LIRs LIRs get client certificates from LIR Portal LIR Portal login with certificate Database updates pending –S/MIME e-mail update authentication –SSL synchronous and web update authentication Wizard for adding X.509 auth to mntners coming Interaction with RIPE NCC hostmasters Q4 2003

12 Axel Pawlik. APNIC 16, 22 August, Seoul. http://www.ripe.net 12 RIPE Database Developments New update program –Improved acknowledgment messages Unreferenced person object auto-cleanup in place –Began 29 May 2003 –Steady deletions, drop from 300k to 200k objects RPSLng (RPSL for IPv6 and multicast) –Prototypes running, not yet IETF standard –Client and server source code also available

13 Axel Pawlik. APNIC 16, 22 August, Seoul. http://www.ripe.net 13 Association News Membership developments surpassing expectations Increase number of Billing Categories –XS, S, M, L, XL AoA changes proposed –To increase flexibility –Voting rights GM at RIPE 46 Budget 2004 –Stable –FTE stable at ~ 93, less than budgeted for 2003, increasing services / service levels

14 Axel Pawlik. APNIC 16, 22 August, Seoul. http://www.ripe.net 14 RIPE 46 Amsterdam, 1-5 September


Download ppt "Axel Pawlik. APNIC 16, 22 August, Seoul. 1 RIPE NCC Update."

Similar presentations


Ads by Google