1 The Ku-band Network Nara Institute of Science and Technology AI3 Nara NOC Team UMEDA Toshiyuki

2 The state of Nara NOC s Aug 15-16, All equipment to the new room s Cold Dry and Clean room s All router and modem have few troubles s The new cables are introduced. s The receiving signal power is higher than before

3 The measurement of the receiving signal power s The signal power from ITB, AIT and NAIST (9/1 - 9/30) s From NAIST is a return signal power s We measured the network unavailable time. s The C/N of the receiving power is under 6dB

4 The receive signal power s ITB s 761min is under 6dB(C/N) s 98.24% is available s AIT s 250min is under 6dB(C/N) s 99.41% is available

5 The receive signal power (2) s NAIST s 54.5min is under 6dB(C/N) s 99.87% is available

6 The signal power chart

7 The problems s ITB s The receiving signal power is variable s AIT s The receiving signal power is very variable s The receiving signal power is a little low

8 How to solve the problems s Please ask Mr. Mizuno

9

10

11

12

13

14

15

16

17 s 1 1:13:30 - 1 8:00:00 (406.5min) s 1 12:41:00 - 1 12:48:00 (7min) s 1 13:05:30 - 1 13:12:00 (6.5min) s 20 9:43:00 - 20 10:39:30 (56.5min) s 20 17:14:00 - 20 17:40:00 (26.5min) s 20 19:27:30 - 20 19:28:00 (0.5min) s 22 15:27:30 - 15:35:30 (8min) s : : 17: : 1min30sec s : : 06: : 30sec s : : : : 57min30sec s : : 16: : 5min s : : : : 163min30sec s : : 19: : 21min30sec