© 2010 Institute of Nuclear Power Operations HPRCT 2010 SITE HUMAN PERFORMANCE EVENT-FREE DAY RESET CRITERIA Tom Kriesel INPO Tom Kriesel INPO.

Similar presentations


Presentation on theme: "© 2010 Institute of Nuclear Power Operations HPRCT 2010 SITE HUMAN PERFORMANCE EVENT-FREE DAY RESET CRITERIA Tom Kriesel INPO Tom Kriesel INPO."— Presentation transcript:

1 © 2010 Institute of Nuclear Power Operations HPRCT 2010 SITE HUMAN PERFORMANCE EVENT-FREE DAY RESET CRITERIA Tom Kriesel INPO Tom Kriesel INPO

2 © 2010 Institute of Nuclear Power Operations HPRCT 2010 Historical Review INPO , Human Performance Key Performance Indicators June 2008 Industry Developed Established significance criteria (consequence based) for HU Events Event Rate Performance Indicator Event Rate = # of events (over last 18 mons.) x 10,000 Total person hrs. worked over last 18 mons. INPO , Human Performance Key Performance Indicators June 2008 Industry Developed Established significance criteria (consequence based) for HU Events Event Rate Performance Indicator Event Rate = # of events (over last 18 mons.) x 10,000 Total person hrs. worked over last 18 mons.

3 © 2010 Institute of Nuclear Power Operations HPRCT 2010 Historical Review First Quarter 2009, plants started reporting data in Consolidated Data Entry (CDE) system Monthly number of Human Performance Errors Quartile ratings calculated by INPO based on monthly and quarterly data Industry data found under Additional INPO Indicator Results on Plant Information Center homepage First Quarter 2009, plants started reporting data in Consolidated Data Entry (CDE) system Monthly number of Human Performance Errors Quartile ratings calculated by INPO based on monthly and quarterly data Industry data found under Additional INPO Indicator Results on Plant Information Center homepage

4 © 2010 Institute of Nuclear Power Operations HPRCT 2010 Human Performance Event Performance Indicators

5 © 2010 Institute of Nuclear Power Operations HPRCT 2010 Human Performance Event Performance Indicators

6 © 2010 Institute of Nuclear Power Operations HPRCT 2010 Human Performance Event Performance Indicators

7 © 2010 Institute of Nuclear Power Operations HPRCT 2010 Challenges with reported data in 2009 Some stations reporting errors not meeting significance criteria in INPO and CDE Data Element Manual, INPO Not being detected and corrected by HU leads Action needed by HU leads Know who is updating CDE for your site Ensure they are using correct site indicator for input data Validate correct data entered Some stations reporting errors not meeting significance criteria in INPO and CDE Data Element Manual, INPO Not being detected and corrected by HU leads Action needed by HU leads Know who is updating CDE for your site Ensure they are using correct site indicator for input data Validate correct data entered

8 © 2010 Institute of Nuclear Power Operations HPRCT 2010 Challenges with reported data in 2009 Again – only report data meeting the significance criteria for a station event (site clock reset) as defined in Why not change indicator title to event instead of error Event term already used by INPO for analysis of industry submitted operation experience reports Still being evaluated by analysis group at INPO Again – only report data meeting the significance criteria for a station event (site clock reset) as defined in Why not change indicator title to event instead of error Event term already used by INPO for analysis of industry submitted operation experience reports Still being evaluated by analysis group at INPO

9 © 2010 Institute of Nuclear Power Operations HPRCT 2010 Human Performance Event Performance Indicators There is other Human Performance Events data in the Plant Information Center (PIC) Not the same as the new indicator Stations report number quarterly Determined by INPO Analysis Group review of submitted Operation Experience reports INPO Analysis Group tags Human Performance as applicable during analysis of submitted Operation Experience reports There is other Human Performance Events data in the Plant Information Center (PIC) Not the same as the new indicator Stations report number quarterly Determined by INPO Analysis Group review of submitted Operation Experience reports INPO Analysis Group tags Human Performance as applicable during analysis of submitted Operation Experience reports

10 © 2010 Institute of Nuclear Power Operations HPRCT 2010 Whats next? 18 months of industry data will be available end of second quarter 2010; then Calculation will start using rolling 18 months (aligned with ) Indicator will move into Plant Information Center (PIC) Targeted for implementation after 2010 second quarter Quartile values calculated using 18 month rolling data 18 months of industry data will be available end of second quarter 2010; then Calculation will start using rolling 18 months (aligned with ) Indicator will move into Plant Information Center (PIC) Targeted for implementation after 2010 second quarter Quartile values calculated using 18 month rolling data

11 © 2010 Institute of Nuclear Power Operations HPRCT 2010 Whats next? Industry team worked hard to establish station event criteria in , but based on roll-out experience it is time to revisit the criteria.

12 © 2010 Institute of Nuclear Power Operations HPRCT 2010 SITE HUMAN PERFORMANCE EVENT-FREE DAY RESET CRITERIA Definition of a Site Human Performance Event-Free Day (EFD) Reset – When an event, as described in the table below, occurs as a result of either of the following: an initiating action (error) by an individual or group of individuals (Re) (event resulting from an active error) an initiating action (not an error) by an individual or group of individuals during an activity conducted as planned (Md) (event resulting from a flawed defense or latent organizational weakness created within the last 18 months) Definition of a Site Human Performance Event-Free Day (EFD) Reset – When an event, as described in the table below, occurs as a result of either of the following: an initiating action (error) by an individual or group of individuals (Re) (event resulting from an active error) an initiating action (not an error) by an individual or group of individuals during an activity conducted as planned (Md) (event resulting from a flawed defense or latent organizational weakness created within the last 18 months)


Download ppt "© 2010 Institute of Nuclear Power Operations HPRCT 2010 SITE HUMAN PERFORMANCE EVENT-FREE DAY RESET CRITERIA Tom Kriesel INPO Tom Kriesel INPO."

Similar presentations


Ads by Google