Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 SoCalGas/SCE Integrated Multifamily Demonstration Project Presentation to the LIOB July 10, 2012.

Similar presentations


Presentation on theme: "1 SoCalGas/SCE Integrated Multifamily Demonstration Project Presentation to the LIOB July 10, 2012."— Presentation transcript:

1 1 SoCalGas/SCE Integrated Multifamily Demonstration Project Presentation to the LIOB July 10, 2012

2 Background LINC Housing – 274 Unit affordable housing complex in Santa Ana, CA Project initiated by California Housing Partnership Corporation (CHPC) Work group collaboration includes: CHPC, LINC Housing, Stewards of Affordable Housing for the Future (SAHF), Century Housing, SoCalGas & SCE 2

3 Background IOU Objectives: Develop integrative, sustainable & replicable approaches to comprehensively treat targeted MF complexes in order to achieve deep energy savings Test Various MF Strategies Including: Single Point of Contact, multi-program coordination, pre/post-installation energy analysis, referral coordination, streamline practice and delivery & test new EE technologies etc. 3

4 Project Joint utility coordination effort between SoCalGas & SCE IOU energy efficiency programs involved Energy Savings Assistance Program (Joint SCG & SCE implementation) Solar Thermal (CSI program) MF Direct Install Programs (SCG & SCE – No cost to LINC) MF EE Retrofit Rebates (SCG and SCE) EE Education for Residents/Kids Emerging Technologies to conduct ‘In Unit’ testing On-Bill Financing/Line-item Billing ESAP &/or third party contractor(s) available for market rate installations Provide recommendations beyond gas/electric – Connection to MWD & Santa Ana Public Works Agency (water measures) 4

5 Initial Successes Single Point of Contact provides simplified & customer friendly approach to owner/tenants in addressing multi-program accessibility issue (including both IOU and non-IOU programs) Owner/Work Group collaboration maximizes savings opportunities & delivers cost effective implementation timelines (simultaneous installation of retrofits/measures, where possible) Owner works with IOUs to engage tenants early and throughout the project Use of dual utility contractor to deliver multiple programs during a single visit imposes smallest possible impact to tenants IOU funded programs allow owner to stretch dollars and provide additional deep energy savings measures not funded through the IOUs 5


Download ppt "1 SoCalGas/SCE Integrated Multifamily Demonstration Project Presentation to the LIOB July 10, 2012."

Similar presentations


Ads by Google