Presentation is loading. Please wait.

Presentation is loading. Please wait.

Chapter 4 & Chapter 5 Process Planning And Technology Decisions.

Similar presentations


Presentation on theme: "Chapter 4 & Chapter 5 Process Planning And Technology Decisions."— Presentation transcript:

1 Chapter 4 & Chapter 5 Process Planning And Technology Decisions

2 Process Strategy l Overall approach to producing goods & services l Defines: capital intensity process flexibility vertical integration customer involvement

3 Types of Processes l Projects l Batch production l Mass production l Continuous production

4 Project Batch(Job shop)Mass Continuous Product Unique Made to order Made to stock Commodity CustomerSinglyFew individualsMass marketMass market DemandInfrequentFluctuatesStableVery stable VolumeVery lowLow to medHighVery high VarietyInfiniteMany, highLowVery low SystemLong-termIntermittentFlow linesProcess industry EquipmentVariedGeneral-purp.Special-purp.Highly automated Type of workContractsFabricationAssemblyMix, treat, refine SkillsExpertsWide rangeLimited rangeEquipment craftspeople monitors AdvantagesCustom workFlexibilityEfficiencyHighly efficient qualitysped, low costlarge capacity Disadv.Non-repeatingCostly, slowCapital invest.Difficult to change ExampleConstructionPrinting, bakeryAutos, TV’sPaint, oil, food

5 Process Planning l Make-or-buy decisions l Process selection l Specific equipment selection l Process plans l Process analysis

6 Process Planning: Process Selection With Break-Even Analysis c f = fixed cost v = volume c v = variable cost per unit p =price per unit

7 Solving For Break-Even Volume

8 Break-Even Example Fixed cost = c f =$2,000 Variable cost = c v = $5 per raft Price = $10 per raft

9 Break-Even Graph

10 Choosing Between Two Processes $3v = $8,000 v = 2,667 rafts $2,000 + $5v = $10,000 + $2v Process AProcess B Below 2,667 choose A Above 2,667 choose B

11 Graphical Solution To Process Selection A B A B

12 Point Of Indifference l Volume where cost of A = cost of B l Rule for choosing process: Above point of indifference choose process with lowest variable cost Below point of indifference choose process with lowest fixed cost

13 Process Planning: Make-Or-Buy Decisions 1. Cost 2. Capacity 3. Quality 4. Speed 5. Reliability 6. Expertise

14 Process Planning: Specific Equipment Selection 1. Purchase cost 2. Operating cost 3. Annual savings 4. Revenue enhancement 5. Replacement analysis 6. Risk and uncertainty 7. Piecemeal analysis

15 Process Planning: Process Plans - documents used l Engineering drawings (Blueprints) l Bill of material l Assembly diagram l Assembly chart / product structure diagram l Operations process chart l Routing sheet

16 Bill Of Material (unstructured) No.Part No.Part name 151292Outlet end 251284Handle 352043Switch 451576Electric cord 551265Rear housing 651268Motor mounting plate

17 Product Structure Diagram Upholstery tool Crevice tool Hand-vac Dusting tool Package Packaged Hand-vac Forward housing assembly Screw & lock washer assembly Rear housing assembly

18 Operations Process Chart Part nameTable leg Part no.2410 UsageTable Assembly No.437 Oper No.DescriptionDept.MachineTimeTools 10Saw to rough length041 20Plane to size043 30Saw to finished length041 40Measure dimensions051 50Sand052

19 Process Flowchart Symbols Operations Inspection Transportation Delay Storage D

20 Process Flowchart Step Operation Transport Inspect Delay Storage Distance (feet) Time (min) Description of process 1 2 3 4 5 6 7 8 9 10 11 Unload apples from truck Move to inspection station Weigh, inspect, sort Move to storage Wait until needed Move to peeler Apples peeled and cored Soak in water until needed Place in conveyor Move to mixing area Weigh, inspect, sort TotalPage 1 0f 3480 30 5 20 15 360 30 20 190 ft 20 ft 50 ft 100 ft Date: 9-30-95 Analyst: TLR Location: Graves Mountain Process: Apple Sauce

21 Process Planning: Process Analysis l Continuous improvement basic tool is process flowchart l Reengineering basic tool is process map

22 Process Reengineering Customer requirements data Strategic directive Goals & specifications for process performance High-level process map Detailed process map Pilot study of new design Full-scale implementation Benchmark data Design principles Key performance measures Baseline analysis Innovative ideas Model validation

23 High-level Process Map Input Output Performance Goal Subprocess

24 Design Principles For Reengineering 1. Organize around outcomes, not tasks 2. Capture information once, at the source 3. Centralize resources with info. tech. 4. Link parallel sub-processes 5. Design to do work right the first time 6. Remove complexity 7. Identify information & technology levers

25 Information Technology in Manufacturing Processes l Management information system (MIS) move large amounts of data l Decision support system (DSS) add decision making support l Expert system recommend decision based on expert knowledge

26 Decision Support System Information: reports model results what if? analysis Computer system: data processing Data Quantitative techniques PersonnelAccounting ProductionMarketingDistributionOther areas Decisions Management Information System What -if? analysis Management Decision Support System

27 Artificial Intelligence l Neural networks emulate interconnections in brain l Genetic algorithms based on adaptive capabilities in nature l Fuzzy logic simulate human ability to deal with ambiguity

28 Advanced Communications l Electronic data interchange (EDI) l Internet l Wireless communications l Teleconferencing & telecommuting l Bar coding l Virtual reality

29 Manufacturing Technology l Numerically controlled (NC) machines controlled by punched tape l Computer numerical controlled (CNC) controlled by attached computer l Direct numerical control (DNC) several NC machines controlled by single computer

30 Automated Material Handling l Conveyors l Automated guided vehicle (AGV) l Automated storage & retrieval system (ASRS)

31 Flexible Manufacturing Systems (FMS) l Programmable machines l Controlled by common computer network l Combines flexibility with efficiency l Reduces setup & queue times

32 Flexible Manufacturing System Parts Finished goods LoadUnload Computer control room Terminal Machine Tools Conveyor Pallet

33 Robotics l Programmable manipulators l Follow specified path l Better than humans with respect to hostile environments long hours consistency

34 Robot Parts l Controller hardware, software, power source l Manipulator robot arm l End-effector “hand”

35 Computer Integrated Manufacturing (CIM) l Integration of design, manufacture & delivery via computer technology l CAD - uses software to create & modify designs l CAM - uses programmable automation in manufacturing l CAE - links functional design to CAD form design l CAPP - creates processing instructions for CAM l GT- classifies designs to benefit from prior experience

36 Components Of CIM CIM Product design Manufacture Process planning Systems management RoboticsFMS NC/CNC/ DNC Cells and centers Automated inspection AGV, ASRS JIT/ kanban DSS/ES/ AI LAN, TOP, satellites TQM Bar codes, EDI MRP GTCAECAD IGES, PDES, DMIS DFM Cellular manufacturing MAP, STEP CAD/CAM CAPP

37 Adoption Of Technology l Technology Readiness l Need well-designed products & efficient processes l Technology Design l Know what to automate l Technology Selection l Choose the right level l Technology Integration l Have a strategy for incremental automation

38 Reminder: Process Analysis Measurement l Review process performance metrics -- see pages 109 through 110


Download ppt "Chapter 4 & Chapter 5 Process Planning And Technology Decisions."