Presentation is loading. Please wait.

Presentation is loading. Please wait.

OData Technical Committee Kick-off July 26, 2012.

Similar presentations


Presentation on theme: "OData Technical Committee Kick-off July 26, 2012."— Presentation transcript:

1 OData Technical Committee Kick-off July 26, 2012

2 Agenda TC Process Overview Recommendations for Spec Editing 07/26/2012OASIS Presentation to OData TC2

3

4 TC Process Overview TC Process is created by OASIS Board, carried out by TC Adminstration Job of TC Administration  Support activities of OASIS members  Turn TC Process guidelines into practical rules  Communicate procedures & best practices to TCs  Represent TC interests to Board  Improve tools & support for members  Recommend improvements to process itself 07/26/2012OASIS Presentation to OData TC4

5 Work Product Lifecycle Your work products will progress through the following stages for a Standards Track Work Product: 1. Working draft (no official standing) 2. Committee Specification Draft 3. Committee Specification Public Review Draft 4. Committee Specification 5. Candidate OASIS Standard 6. OASIS Standard 7. Approved Errata 07/26/2012OASIS Presentation to OData TC5

6 Work Product Lifecycle Stages for a Non-Standards Track Work Product: 1. Working draft (no official standing) 2. Committee Note Draft 3. Committee Note Non-Standards Track Work Products are non- normative and are not implemented – educational papers, marketing collateral, etc. Administrative documents (meeting minutes, etc.) must be maintained on OASIS-provided systems 07/26/2012OASIS Presentation to OData TC6

7 Work Product Lifecycle 07/26/2012OASIS Presentation to OData TC7

8 Making contributions TC members may contribute existing or new work to the TC for consideration in its work TC is under no obligation to do anything with it Contribution only gives OASIS non-exclusive right to use and republish. Full rights remain with the contributor Process is simple: Load contribution to TC’s document repository Send email to the TC mailing list announcing the contribution and including a link to the uploaded file 07/26/2012OASIS Presentation to OData TC8

9 Contacts with TC Admin ActivityTimeframeTCA Interactions Working DraftUp to TCRequest WD template Approve Committee Spec / Note Draft Up to TCRequest CSD/CND upload (optional) Public ReviewCSD: 30 days 1 st / 15 days subsequent CND: 15 days Request public review Approve Committee Specification / Note After final public reviewRequest Special Majority ballot Upload & announce CS Approve Candidate OASIS Standard After Committee SpecificationRequest Special Majority ballot Public review60 daysAnnounce results Membership voteAfter public reviewLaunch membership ballot OASIS StandardAfter successful ballotUpload & announce OS 07/26/2012OASIS Presentation to OData TC9

10 TC Process Overview Some other things to keep in mind: TCs run on Roberts Rules of Order, including its requirements for quorum To vote, you must maintain meeting attendance Gain rights at first meeting or after attending two consecutive meetings Lose rights by missing two consecutive meetings unless during a leave of absence 07/26/2012OASIS Presentation to OData TC10

11

12 Starting a Working Draft Except for custom publishing systems, working drafts are done in either.doc or.odt formats First step is to request a starter document / template from TC Admin Captures all metadata TC Admin determines the file names and URLs Ensures that TC Admin can handle publishing your work expeditiously Request ticket is at https://www.oasis- open.org/resources/tc-admin-requests/work-product- registration-template-request 07/26/2012OASIS Presentation to OData TC12

13 Managing Your Working Draft The first draft will be labeled Working Draft 01 in the starter document and –wd01 on the filename Each revision should be incremented (e.g. 02, 03) Working drafts should be stored in the TC’s document repository If your spec contains multiple files (e.g. wsdls, schemas) all the content should be zipped into a single file and loaded into Kavi 07/26/2012OASIS Presentation to OData TC13

14 Managing Your Working Draft Use only alphanumeric characters, period and hyphen in filenames. Do not use underscore or any other punctuation characters Review the Naming Directives at http://docs.oasis- open.org/specGuidelines/ndr/namingDirectives.html for other considerationshttp://docs.oasis- open.org/specGuidelines/ndr/namingDirectives.html Feel free to consult with TC Admin on how best to organize your specification and its components 07/26/2012OASIS Presentation to OData TC14

15 General Notes Do not change the styles defined in the template. Doing so can cause problems when TC Admin prepares to publish your specification Links to other components should be relative to the specification document’s location TC Admin will prepare PDF and HTML Graphics are best prepared in a separate product and linked into the draft as JPGs or PNGs If your spec will have multiple parts, consult with TC Admin on naming and organization 07/26/2012OASIS Presentation to OData TC15

16 Approving a Working Draft Make sure required sections are in the specification Normative & non-normative references sections Acknowledgements section Conformance section (if going to public review) Separate plain-text files for any normative computer code files included in the document Combine all components that are part of the Draft (e.g. narrative files, schemas, examples) into a ZIP file and load the file to the TC’s document repository 07/26/2012OASIS Presentation to OData TC16

17 Approving a Working Draft Vote can be by motion in a regular meeting or by electronic ballot If by motion, make sure the motion language and vote is recorded in the meeting minutes If by e-ballot, must run minimum 7 days Motion language must include name and version number of the work product and the link to the ZIP file After approval, enter appropriate tickets for TC Admin using the same ZIP file link 07/26/2012OASIS Presentation to OData TC17

18 Approving a Working Draft Approvals may not be contingent on “final edits” or other changes The file the TC approves must be the same as the file linked in the TC Admin ticket 07/26/2012OASIS Presentation to OData TC18

19 Managing Public Reviews Comments may only be accepted via the TC’s – comment@ mailing list. No other inputs can be accepted Chairs should subscribe to –comment@ list. TC should designate someone to subscribe and manage comments All comments must be acknowledged. All comments must be tracked and a log maintained of all comments and the TC’s decisions on their resolutions 07/26/2012OASIS Presentation to OData TC19

20 Resources for the TC TC Administration home page - https://www.oasis- open.org/resources/tcadmin https://www.oasis- open.org/resources/tcadmin Provides links to documentation, forms and updates on TC Admin work queue TC Process interactive flow chart - https://www.oasis- open.org/sites/www.oasis-open.org/files/TC-Process-gantt-chart.xls https://www.oasis- open.org/sites/www.oasis-open.org/files/TC-Process-gantt-chart.xls Provides Gantt chart of process steps with links to documentation and forms 07/26/2012OASIS Presentation to OData TC20

21 Resources for the TC TC Admin support request forms - https://www.oasis- open.org/resources/tc-admin-requests https://www.oasis- open.org/resources/tc-admin-requests Used to submit requests for TC Admin actions e.g. starting a public review OASIS TC Process - https://www.oasis-open.org/policies-guidelines/tc- process https://www.oasis-open.org/policies-guidelines/tc- process Basic policy document on which all rules and procedures are based Naming Directives - http://docs.oasis- open.org/specGuidelines/ndr/namingDirectives.html http://docs.oasis- open.org/specGuidelines/ndr/namingDirectives.html Rules for constructing filenames, etc. 07/26/2012OASIS Presentation to OData TC21

22 Resources for the TC TC Admin How-To Guide - https://www.oasis- open.org/resources/tcadmin/tc-process-how-to-guide-introduction https://www.oasis- open.org/resources/tcadmin/tc-process-how-to-guide-introduction Instructions on how to work within the OASIS TC Process with links to additional documentation, forms, etc. TC Admin JIRA work queue - https://tools.oasis- open.org/issues/secure/IssueNavigator.jspa?reset=true&pid=10010&priority=3&resolutio n=-1 https://tools.oasis- open.org/issues/secure/IssueNavigator.jspa?reset=true&pid=10010&priority=3&resolutio n=-1 List of open support request tickets that TC Admin is processing 07/26/2012OASIS Presentation to OData TC22

23 07/26/2012OASIS Presentation to OData TC23


Download ppt "OData Technical Committee Kick-off July 26, 2012."

Similar presentations


Ads by Google