1 Professional Engineering Services For Restoration Project John Mitnik, P.E. Engineering & Construction Bureau Chief Operations, Maintenance & Construction John Mitnik, P.E. Engineering & Construction Bureau Chief Operations, Maintenance & Construction Pre-Proposal Meeting November 21, 2013

2 The PROJECT  Part 3 Section 4 describes the PROJECT as: The PROJECT contains restoration activities for refurbishing, enhancing and/or adding components... while also accomplishing the additional needs of the environment... Restoration activities under the PROJECT may include, but not be limited to: stormwater treatment areas, flow equalization basins, reservoirs... as contained within the District’s Restoration Strategies Regional Water Quality Plan, Comprehensive Everglades Restoration Plan and Northern Everglades and Estuaries Protection Plan.

3  Which consists of:... design and construction management of various restoration activities further described as being similar in nature but not limited to high and low hazard embankments and levees, associated canal excavation/bank stabilization, stormwater pump stations, control structures, spillways, bridges, monitoring systems, communication... and control systems... the associated features of grading, paving & drainage systems and electrical facility improvements... including architectural, structural, mechanical, electrical and landscaping components,... Refurbishment/retrofitting of existing facilities, rather than design of new facilities, may be applicable to any of the restoration activities listed above The PROJECT

4 Water Control Structure - Spillway  Reinforced Concrete Gated Spillway  Vertical lift roller gates  Type Hoist: Electric Motor drum and Cable hoist; or portable power-drive for manual operations  Control by remote telemetry through SFWMD SCADA system  Normal Power Source: Commercial Electricity  Emergency Power Source: Portable Backup generator

5 Water Control Structure – Culvert  Reinforced Concrete Box Culvert  CMP pipe  Non-gated as well as Gated culvert structure 5

6 Architectural Design - Control Building TYPICAL CONTROL BUILDING PLAN TYPICAL CONTROL BUILDING ELEVATION

7 Levee, Embankments, and Dams  Seepage Analysis  Wind and Wave Analysis  Freeboard Analysis Seepage Management

8 Canals  Bank Stabilization / Slope Stability  Erosion Protection  Hydraulic conveyance  Operating Plans

9 Pump Stations  Vary in Size from 100 cfs to 3000 cfs  Diesel, Electric, Natural Gas, or Dual Fuel  Flood Control and Non-flood control

10 Additional Services Construction Management Inspections Engineering During Construction

11 Things To Touch On  Methodology and approach to the PROJECT  Quality Assurance / Quality Control  Schedule  Cost Control  Anticipated volume of work $150M

12 Questions? For more information on Restoration Strategies and CERP please refer to the following websites: www.sfwmd.gov/restorationstrategies www.evergladesplan.org


Download ppt "Professional Engineering Services For Restoration Project John Mitnik, P.E. Engineering & Construction Bureau Chief Operations, Maintenance & Construction."

Similar presentations


Ads by Google