Presentation is loading. Please wait.

Presentation is loading. Please wait.

Arnd Meyer (RWTH Aachen) Sep 5, 2003Page 1 Integrated Luminosity Last week: 5 stores (65 hours) 4.78pb -1 (delivered) 3.70pb -1 (recorded) (77.5% eff.)

Similar presentations


Presentation on theme: "Arnd Meyer (RWTH Aachen) Sep 5, 2003Page 1 Integrated Luminosity Last week: 5 stores (65 hours) 4.78pb -1 (delivered) 3.70pb -1 (recorded) (77.5% eff.)"— Presentation transcript:

1 Arnd Meyer (RWTH Aachen) Sep 5, 2003Page 1 Integrated Luminosity Last week: 5 stores (65 hours) 4.78pb -1 (delivered) 3.70pb -1 (recorded) (77.5% eff.)

2 Arnd Meyer (RWTH Aachen) Sep 5, 2003Page 2 Data Taking Efficiency Pre-shutdown plunge

3 Arnd Meyer (RWTH Aachen) Sep 5, 2003Page 3 Downtimes I Special runs Large downtimes

4 Arnd Meyer (RWTH Aachen) Sep 5, 2003Page 4 Downtimes II

5 Arnd Meyer (RWTH Aachen) Sep 5, 2003Page 5 Downtimes III

6 Arnd Meyer (RWTH Aachen) Sep 5, 2003Page 6 Downtimes IV Special runs Large downtimes

7 Arnd Meyer (RWTH Aachen) Sep 5, 2003Page 7 Events / News / Etc. Power outage Monday 7:00 If you want captains/shift crew to do anything (power down, call,...), provide written instructions – don't just assume somebody will do it Already know that Dan is going to be here for Clock/TFW/L1CAL Until Tuesday, no activities – (un)cabling etc. – that could impact Calorimeter noise studies Turning things back on after power outage in coordination with Calorimeter noise task force No new store after 0:01 Sunday Terminate last store at 16:00 Sunday – after this may be a good time to do tests etc. before everything is taken apart Until then: expect 0 stores (base) to 2 stores (design)

8 Arnd Meyer (RWTH Aachen) Sep 5, 2003Page 8 Agenda RussMechanicalBrendan / MichaelLumi ArndData TakingGordon / DougL3 Mike S.FPD StuOnline Jeff/RobL1Muon Al ItoCentral Muon Bob K.L1CAL DmitriForward Muon Fred/Drew/AbidCFT+PSMichiel / Joe S.GM ReinhardL2Geoff / Fritz Controls ???STTBreese / MichaelSMT Stefan / BrigitteL1CTT NirmalyaCAL


Download ppt "Arnd Meyer (RWTH Aachen) Sep 5, 2003Page 1 Integrated Luminosity Last week: 5 stores (65 hours) 4.78pb -1 (delivered) 3.70pb -1 (recorded) (77.5% eff.)"

Similar presentations


Ads by Google