1 Experiences from States
Gujarat “ Survey Using Electronic Total Station (ETS) and Global Positioning System (GPS)” Technology Fair- New Delhi Experiences from States

2 Principal Secretary ( Land Reforms ) &
Presented By : A. Bhattacharyya, I.A.S. , Principal Secretary ( Land Reforms ) & Settlement Commissioner & Director of Land Record, Gujarat State.

3 VISION To undertake detailed resurvey in Gujarat and create updated land records including textual and spatial information Enabling establishment of a system which will help in the continued maintenance of updated land records Provide ready and smooth access to required information to all stakeholders

4 Background of Land Survey in Gujarat….
Gujarat State is pioneer in the country having it’s survey records up to land parcels known as Tippans Land Survey was carried out long ago by Britishers and old Princely States of Gujarat during to The object of the survey was to collect Land Revenue from the owner of land in proportion to the area they held. As per The Bombay Land Revenue Code, 1879 survey should have been conducted after 30 years of original survey.

5 Land Record Information in Gujarat
Current Scenario….. The Government, through its organization, performs mainly two functions: Maintenance and updation of land records (textual records, including village form No. 6 ( Hakpatrak ) and Village Form No. 7/ 12 (Satbara) and Spatial records namely village maps and field measurement books commonly known as Tippans in rural areas.- Maintenance and updation of the textual and the spatial records in urban areas. The textual record is commonly known as Property Card.

6 Need for Advanced Survey Technology
The survey records are outdated About % of the records have also been lost / destroyed / mutilated. Old survey was carried out using conventional instruments available at that time – (5% Tolerance limit was allowed ) Inaccurate records Documents in poor shape and not available at all.

7 ( Field Measurement Record – unscaled )
Original Tippan ( Field Measurement Record – unscaled )

8 ( Field Measurement Record – scaled / digitized )
Enlarged Tippan ( Field Measurement Record – scaled / digitized ) * Chain - Anna Survey No. 63 * Meter-CM N

9 Old Village Map (Interacting & Overlapping)
As per Map As per possession & benchmark As per benchmark of S.No.1 S. no.1 Overlapped Area

10 Gujarat pioneer introducer
Gujarat is pioneer in introducing modern survey technology ETS since GPS since Using this ETS technology approx villages have been re-surveyed Using GPS technology approx hectares of land have been surveyed in Gujarat

11 GIS ready Digitized New Village Map

12 ETS & GPS Survey Machinery

13 What is Electronic Total Station Machine
ETS is an new generation modern survey instrument. It is an optical theodolite combined with Electronic Distance Measurement ( EDM ) instrument and a mini computer which is helpful in collecting data of; Distance Angle Height. ETS reads, records & displays horizontal and vertical angle digitally. It stores the data in its internal data recorder. Precision of the instrument varies between 1“ to 7” (Seconds )

14 What is Electronic Total Station Machine ….
Within the overall objective of XYZ data, the following 12 kinds of detailed data are also displayed HA = Horizontal Angle VA = Vertical Angle AZ = Azimuth or bearing SD = Slope distance HD = Horizontal distance VD = Vertical distance N = Northing E = Easting Z = Elevation Code = Feature Code 11. Time 12. Point No = Serial Point No.

15 What is GPS ? Global Positioning System (GPS) is satellite navigation system It is based on a constellation of 24 satellites orbiting around earth at a very high altitude, The system can be used to measure position of the object on the earth surface in a continuous measures This Mapping Datum created known as World Geodetic System -84 ( WGS-84)

16 SATELLITES AVAILABLE FOR G.P.S. SERVICE

17 GPS Measurements GPS is based on satellite
We are somewhere on this sphere GPS is based on satellite ranging, measuring distance from Satellite Second measurements put us somewhere on this circles & narrows down our location By third measurements we get accurate location

18 Steps initiated by Department
More than 80 ETS & 7 DGPS provided to field officers RFP floated to purchase another 13 ETS & 5 DGPS Circular issued - It is mandatory to measure land > 10 Hectare by ETS & > 50 Hectare by DGPS In House training facility at Deenadayal Institute, Gandhinagar Where 300+ surveyors are already trained on these instruments

19 Steps initiated by Department…
People who come for private survey are charged as follows: By ETS: < 10 Hectare Rs. 2000 For every additional Hectare Rs. 200 By DGPS: < 5 Static Points Rs. 10,000 For every additional Points Rs In RTK mode every point Rs. 200 500 Measurement by ETS during last 3 years Income of Rs. 1 Crore generated

20 Action Plan for Resurvey using high end technology
Sr No District Total cost ( Rs. Crore) Starting YEAR Current Status 1 GANDHINAGAR 2.25 Already started by Departmental surveyors 2 Jamnagar 20.00 Work in Progress through private agencies 3 Patan 7.71 Tendering for outsourcing being finalised 4 Anand, Ahmedabad, Rajkot, Kutch & Sabarkantha 123.00 Proposal being prepared 6 Action plan for other districts being finalised Banakantha,Vadodara, Panchmahal, Surat, Tapi, Surendranagar, 7 Valsad, Navsari, Amreli, Bhavanagar, Kheda, Mehsana, Dahod 8 Bharuch, Narmada, Junagadh, Porbandar 9 Dang

21 Use of ETS & GPS in Re –Survey Jamnagar District - A Case Study
Establishment of GPS Ground Control network Z Value Validation – MSL Data from Survey of India Detailed survey of each land parcel with ETS Generation of all District, Taluka, Village and Land Parcel Map with Latitude / Longitude and Z data. Distribution of land parcel map to every land holder along with validation Preparation of allied land records and promulgation of record.

22 Gujarat State

23 Jamnagar District Total Area : 14,125 Sq. K.M. No. of Talukas : 10
No. of Villages : 695 No. of Land Parcels : 4,46, sub divisions

24 Ground Control Network by DGPS
Establishment of Ground Control Network by DGPS

25 Establishment of GPS Ground Control Network, Accuracy and Destination
DGPS Control Interval – Distance K.M. GPS Observation Time Accuracy Base Station Centre of AOI > 24 Hrs. 1: 1,00,000 Regional Station Between K.M. > 12 < 24 Hrs 1: 50,000 Primary Control K.M. or 16 KM average >12 Hrs. Secondary Control 4 - 6 K.M. > 4 Hrs. 1: 20,000 Tertiary Control 1- 2 K.M. > 15 Minutes 1: 10,000 Auxiliary Control Point 200 Mtr. or more

26 Grid Generation (State Level – 16 x 16 Kms) Primary

27 Grid Generation (State Level - 16x16 Kms)… Primary control
Jamnagar Dist. 16 x 16 K.M.

28 Secondary Control Grid Generation (Dist. Level – 4 x 4 Kms)…

29 Another view of Grid Generation (District Level – 4 x 4 Kms)…

30 With Lat / Long & Dimension
New Land Parcel Map જિ. જામનગર સરવે ન. 132 તા. કાલાવડ ગામ કાલાવડ ધાક. મગનભાઇ નાનજીભાઇ મહેતા With Lat / Long & Dimension સરવે મામલતદાર, જિ.જામનગર

31 Outcomes expected from Jamnagar Resurvey
Geodetic network with co-ordinates and sketch of the control points showing their description and location. District map, taluka maps, village maps and Land Parcel Maps with lat-long. The map projection and coordinates of the control points will be WGS 84 datum based Seamlessly mosaiced district digital database with layers of various topographical details & GIS. Digitized copies of the Village maps showing features like Survey No. , Name, Chalta No. will be obtained National level unified Village code Village map as per National mapping policy & land use pattern with unique feature code will be obtained.

32 Few examples of success stories of Survey Work
using GPS & ETS technology

33 Banni Protected Forest Area Dist. Kutch , Gujarat
Biggest grassland of Asia Area as per survey Sq. K.M. Total villages Periphery K.M. Time taken to complete working days Surveyors surveyor 1 supervisor

34 Banni Protected Forest
ajsdjkvbKJSDBvckjaBSDvb Banni Protected Forest Survey Carried out by DISRA & DILR Kutchh

35 Port. Chanch ,Taluka Rajula Dist. Amreli
Area of GPS survey including coastal area – Hectare. Time taken to complete 9 working days Surveyors surveyor 1 supervisor

36 Survey Carried out by DISRA & DILR Amreli
Chanch Port Survey Survey Carried out by DISRA & DILR Amreli

37 Dholera Port. SIR Area Bhavanagar Dist.
Infrastructure project like SEZ port, Ultra mega Power project and New international Airport Area of survey Hectare Total villages 7 Time taken to complete working days Surveyors surveyor 1 supervisor

38 Survey Carried out by DISRA & DILR Bhavanagar
P T S I R U V E Y SIR SURVEY Survey Carried out by DISRA & DILR Bhavanagar

39 GIFT CITY, Gandhinagar Gujarat International Financial Tech City
Biggest infrastructure project in Gujarat Capital investment of Rs. 1,00,000 + Crore storied High rise buildings Area of survey Hectare Total villages 3 Time taken to complete working days Surveyors surveyor 1 supervisor

40 Survey Carried out by DISRA & DILR Gandhinagar
GIFT CITY AREA Survey Carried out by DISRA & DILR Gandhinagar