Excavator X63 Verification. This Webinar is LISTEN only Questions will be answered in writing at the end of the Webinar. QUESTIONS?

Similar presentations


Presentation on theme: "Excavator X63 Verification. This Webinar is LISTEN only Questions will be answered in writing at the end of the Webinar. QUESTIONS?"— Presentation transcript:

1 Excavator X63 Verification

2 This Webinar is LISTEN only Questions will be answered in writing at the end of the Webinar. QUESTIONS?

3 Last Week Webinar Update  Correction on installation information No software termination for bucket sensor Hardware termination on bucket sensor CAN filter for GX60 7010-0916 Bucket Termination CAN Isolator

4 Reference Material 7010-0697Excel Verification

5 Excavator X63 Verification Webinar September 11 th, 2009 Verification Excel Work Sheets TS-1 Calibration Verification MC-A1 Position Verification

6 Excel Verification Work Sheet

7 Verification No Verification (Rotation error) Graphics only Not critical

8  Start 3DMC and enter simulation mode. TS-1 Calibration and Implement Length Verification

9  In Simulation  Set Level String  Match Elevation

10 Antenna Measurements (using GPS)  Compare GPS measured distance to the physical measured distance to adjust Main/Aux Antenna position  RTK Solution (Single point localization )  Planner Surface  Rover with Pocket 3D

11 Verifying Main Antenna to Boom Length  Position the machine directly North  Mark bucket location and record Northing value  Rotate 180 o  Position the machine directly North  Mark bucket location and record Northing value

12 Verifying Main Antenna to Boom Length  Subtract the two Northing values to get a GPS distance 15.50’  Using a tape or Rover measure the actual distance 15.30’  Subtract the two values and divide by 2 (15.50-15.30 =.20)/2 =.10 If the GPS measured(Northing) value is larger shorten the length in 3D-MC If the tape measured value is larger lengthen the length in 3D-MC

13 Excel Verifying Main Antenna to Boom Length

14 Verifying Aux Antenna to Boom Length  Rotational Heading

15 Verifying Aux Antenna to Boom Length  Position the machine directly North  Curl the bucket in and record: 3DMC Easting of a bucket corner (position screen) Easting with Rover and Pocket 3D  Extend the bucket to its fullest and record: 3DMC Easting of the same corner (position screen) Easting with Rover and Pocket 3D

16 Verifying Aux Antenna to Boom Length  Curled bucket Easting: 3DMC 520.35 Rover 520.38  Extended bucket Easting: 3DMC 520.36 Rover 520.51  The difference in curled position 520.38 - 520.35 =.03  The difference in extended position 520.51 – 520.36 =.15  Measured distance from curled to extended 20’

17 Verifying Aux Antenna to Boom Length  Determine the Aux antenna correction amount using this formula: A(Distance Between Antennas) C(Ext Easting – D (Curl Easting) X B (Curl To Ext Distance) = 7.5.15 -.03 X 20 = X=.045 Rover Easting's larger (decrease) 3DMC Easting’s larger (Increase)  Curled bucket Easting: 3DMC 520.35 Rover 520.38  Extended bucket Easting: 3DMC 520.36 Rover 520.51

18 Excel Verifying Aux Antenna to Boom Length

19 Verifying Main Antenna Offset  Position the machine directly North  Curl the bucket in and record: 3DMC Easting of a bucket corner (position screen) Easting with Rover and Pocket 3D  Extend the bucket to its fullest and record: 3DMC Easting of the same bucket corner (position screen) Easting with Rover and Pocket 3D

20 Verifying Main Antenna Offset  Curled bucket Easting: 3DMC 520.35 Rover 520.38  Extended bucket Easting: 3DMC 520.48 Rover 520.51  The difference in curled position 520.38 - 520.35 =.03  The difference in extended position 520.51 – 520.48 =.03  If Rover Easting's are larger (increase)  If 3DMC Easting’s are larger (decrease)

21 Excel Verifying Main Antenna Offset

22 Verifying Main Antenna Height If 3DMC elevations are higher than the rover increase the antenna height If 3DMC elevations are lower than the rover decrease the antenna height.  Record several 3DMC bucket elevations and corresponding survey rover elevations  Subtract the elevations and find the average

23 Excel Verifying Main Antenna Height

24 Testing Machine Sensors for Accuracy

25 Elevation/Position Errors Wedge errors or Inconsistent elevation errors  Perform Elevation Accuracy Verification to check machine and sensor calibration Overall bias between machine and rover  Perform Main Antenna Height Verification Northing Errors:  Perform Main Antenna to Boom Length Verification Rotational Errors: (curled to extended)  Perform Aux Antenna to Boom Length Verification Easting Errors:  Perform Main Antenna Offset Verification

26 Address to download all TU-Live Webinars: ftp://TUlive+topconuniversity.com:tulive@ftp.topconuniversity.com/ ftp://TUlive+topconuniversity.com:tulive@ftp.topconuniversity.com/ –Recorded Webinar –PP Presentation; Introduction to Paver System Five –Webinar Q & A Additional requests for TU staff: Email: training@topcon.comtraining@topcon.com Questions?


Download ppt "Excavator X63 Verification. This Webinar is LISTEN only Questions will be answered in writing at the end of the Webinar. QUESTIONS?"

Similar presentations


Ads by Google