Lali Tchelidze Safety work package leader

Similar presentations


Presentation on theme: "Lali Tchelidze Safety work package leader"— Presentation transcript:

1 Lali Tchelidze Safety work package leader
Accelerator/Safety Lali Tchelidze Safety work package leader April 22, 2015

2 Overview Safety work package – expertise and responsibilities
Working scope Current and future tasks Summary

3 Safety work package Resources: Expertise:
2 full time employees 1 part-time employee 2 part-time employees (time limited) A senior consultant (planned - time limited) Expertise: Radiation safety/Monte-Carlo codes Two parallel accelerator models in MARS and FLUKA, additionally the front-end model in MCNPX General safety (including cryogenic safety, fire safety, electrical safety, etc.) Role: advise and propose solutions to ACCSYS project management and ES&H Meetings: bi-weekly

4 Working scope Examples: Re-evaluation of the linac tunnel HVAC system.
To assist integration/CF work To support licensing process with SSM, directly involved in specific discussions Answer ESHAC recommendations (nine recommendations identified during the last meeting) To be involved in design reviews and WP annual audits Various other activities Examples: Re-evaluation of the linac tunnel HVAC system. Composition of the actual clay material used in the construction. Strategy for waste handling. Centralized zoning approach. Cryogenic safety: plan for documenting, reviewing and approving cryogenic systems. Participation in upcoming design reviews and audits Participation in preparation of ESS safety policies

5 Some tasks, 2015 Prompt Radiation Shielding
Slope in berm, filling material Stubs for RF and cables HEBT loading bay Front end building A2T raster system cable penetration Activation & Residual Dose Levels Beam-line activation Activation of cooling water in WL Tunnel air activation General Safety Activities Tunnel HVAC system Smoke extraction system/fire safety strategy ODH policy and strategy ADD A CUSTOMER TO EACH TASK

6 Dealing with tasks Task assignment and follow-up is done in RADSF* JIRA (also in various boards). (* Username: essreviewer, pass: AR22015) Clear purpose, specific goals, specific dates. Final technical notes reviewed and approved in CHESS.

7 Accelerator Safety and Radioprotection Home
Link: Accelerator Safety and Radioprotection * * Username: essreviewer Pass: AR22015

8 Accelerator shielding
“Baseline” shielding design ESS Stub chamfers Cryogenic distribution line vent Modified HEBT loading bay Slope in berm Backfill material Front-end building Pipes for HVAC A2T penetration Approved ESS linac prompt radiation shield design criteria: ESS by L. Tchelidze ESS by L. Tchelidze “Baseline” shielding design (both analytical and Monte-Carlo analysis): ESS by L. Tchelidze ESS by L. Tchelidze ESS by E. Pitcher Procedures: ESS Procedure for designing shielding for safety (as from March 18, 2015) ESS by G. Muhrer Pictures demonstrating changes

9 Geometry status Main model – in MARS (L. Tchelidze, M. Jarosz)
Parallel model – in FLUKA (L. Esposito, L. Lari) Warm linac model – in MCNPX (R. Bevilacqua) L. Esposito R. Bevilacqua M. Jarosz

10 Other safety issues Assessment of the tunnel ventilation system
Confinement classification (ISO-17873) based on DAC Minimum depression level Radiological requirements Fire-control and ODH control requirements Fire safety Fire loads assessment in the tunnel – no sprinklers required Similar work ongoing for klystron gallery Smoke extraction Cryogenic safety (ESHAC recommendation!) ODH calculations model to assess risks Safety documentation to be submitted to ES&H List of mitigation measures Working group in place

11 Summary-1 A safety group in accelerator division to support/answer safety questions & issues related to the accelerator We have expertise to deal with both general safety and radiation safety issues We have expertise to run Monte-Carlo simulations as needed Serves as an advisory group to ACCSYS project management and ES&H In charge to: Address shielding/radio-protection issues Address general safety issues Support ES&H division in licensing process Answer ESHAC recommendations Be involved in PDR, CDR, WP-s annual audit Support development of ESS safety manual

12 Summary-2 Done: On-going:
First iteration for assessment of the change requests for shielding Front-end building (partially) HEBT loading bay and stubs (partially) Emergency exit in A2T area Smoke evacuation design from prompt radiation point of view Cryogenic vent line Filling material A2T cable penetration On-going: Updating MARS and FLUKA models Detailed MC simulations to verify layout for radiation shielding MC simulations for activation studies ODH policy and strategy Ventilation system Smoke extraction system

13 Thank you!