Oak Ridge Utility District Presents Pipeline Safety Information Grants to Communities – Technical Assistance Grants (TAG) By: Ben Andrews, General Manager.

Similar presentations


Presentation on theme: "Oak Ridge Utility District Presents Pipeline Safety Information Grants to Communities – Technical Assistance Grants (TAG) By: Ben Andrews, General Manager."— Presentation transcript:

1 Oak Ridge Utility District Presents Pipeline Safety Information Grants to Communities – Technical Assistance Grants (TAG) By: Ben Andrews, General Manager ORUD

2 Oak Ridge Utility District Located in: Oak Ridge, TN Approx. 13,000 Meters Operated since 1951 Operated since 1951 Public Gas System Public Gas System Five member Board of Commissioners Five member Board of Commissioners Mostly Residential Mostly Residential

3 U.S. Department of Transportation Grant Requirements Improve Distribution Systems Improve Distribution Systems Through Technical Assistance in form of: Through Technical Assistance in form of: Engineering Engineering Scientific Analysis Scientific Analysis Pipeline Safety Issues Affecting Local Communities Pipeline Safety Issues Affecting Local Communities

4 ORUD Proposed Program Improve Distribution Systems (Continued) Through Technical Assistance in form of: Monitoring System Monitoring System Incorporating Pipeline Integrity Incorporating Pipeline Integrity Pipeline Safety Education for Community Pipeline Safety Education for Community

5 Why the Monitoring System? Why the Monitoring System? Adding Remote Units Will: Adding Remote Units Will: Allow us to recognize fluctuations in pressure Gives the ability to respond or address any potential problems very quickly Increase the security and safety of residents living near our pipelines

6 Improvements in Monitoring System Purchase and install 7 Remote Monitor Purchase and install 7 Remote Monitor Alarms when pressures fall out of acceptable guidelines Place in areas that are determined to be high risk The cost $3000 each (including set up & technical assistance) Total amount $21,000.00

7 Mercury ERX Wireless Pressure Monitoring Recorder Mercury ERX Wireless Pressure Monitoring Recorder Wireless Communication Audit Trail Memory Solar Powered Alarm Call-Out Capable

8 Why Incorporate Pipeline Integrity? Increasing Our Pipeline Integrity Move toward our goal of implementing a pipeline integrity management program within our GIS Add pipeline information to each pipe segment Installation Repair history Leak survey data Make Information accessible to all employees at workstations

9 Improvements in Pipeline Integrity Upgrade Geographical Information System Convert an existing seat of ESRI ArcView to ArcEditor Upgrade Cost is $5500

10 Improvements in Pipeline Integrity Upgrade GIS (Continued) Add the ArcGIS Server extension Publishes GIS to the entire company Cost $4500 Total Cost $10,000

11 ESRI ArcEditor ORUD currently uses a legacy CAD program to create and maintain distribution system mappingORUD currently uses a legacy CAD program to create and maintain distribution system mapping The data is exported as ESRI shape files and then imported into the ArcView softwareThe data is exported as ESRI shape files and then imported into the ArcView software

12 ESRI ArcEditor The upgrade to ArcEditor will allow editing and management of ORUD’s distribution system mapping to move from the legacy CAD software to the ESRI GIS environment

13 ESRI ArcGIS Server The addition of ESRI ArcGIS Server will allow ORUD system maps to be viewed throughout the company network allowing improved customer service and emergency response

14 ESRI ArcGIS Server This version of the ArcGIS server software will become a foundation for additional functionality upgrades such as image management, network analysis, and mobile applications as the GIS system matures This version of the ArcGIS server software will become a foundation for additional functionality upgrades such as image management, network analysis, and mobile applications as the GIS system matures

15 Why Increase Pipeline Safety Education? Increasing Community Awareness: To fulfill guidelines for API RP-1162 API RP-1162 Regulatory Requirements Federal pipeline safety regulations require pipeline operators to conduct continuing public awareness programs to provide pipeline safety information to four stakeholder audiences: Affected Public, Emergency Officials, Local Public, Officials and Excavators

16 Why Increase Pipeline Safety Education? Increasing Community Awareness (Continued): To increase awareness to a larger demographic range (youth to seniors) Provide an inclusive Community Campaign

17 Public Awareness Campaign Safety Programs and Pipeline Safety Local and Regional Media in forms of: Newspapers Television Radio Website Social Networking Total Cost $19,000

18 Public Awareness Campaign Analyze the Market Segment Break down the media sources to achieve maximum coverage Utilize Common Ground Alliance Ads Use media including social networking and website to do mass ad campaign

19 Questions