Presentation is loading. Please wait.

Presentation is loading. Please wait.

Convention on Environmental Impact Assessment in a Transboundary Context (Espoo, 1991) Sandra Ruza, UNECE Secretariat www.unece.org/env/eia Workshop on.

Similar presentations


Presentation on theme: "Convention on Environmental Impact Assessment in a Transboundary Context (Espoo, 1991) Sandra Ruza, UNECE Secretariat www.unece.org/env/eia Workshop on."— Presentation transcript:

1 Convention on Environmental Impact Assessment in a Transboundary Context (Espoo, 1991) Sandra Ruza, UNECE Secretariat www.unece.org/env/eia Workshop on Multilateral Environmental Agreements Tirana, Albania, 22-24 June 2010

2 Environmental Impact Assessment (EIA) and transboundary issues Espoo Convention in brief Status of ratification Contacts Multilateral agreements Transboundary EIA procedure Good practice Case study review Compliance with and implementation of the Convention Subregional cooperation and capacity-building

3 Espoo Convention Convention on Environmental Impact Assessment in a Transboundary Context Adopted in 1991 in Espoo, Finland, entered into force in 1997 Now 44 Parties, including the European Community UNECE provides Secretariat

4 Status StateConvention1st amendment2nd amendment AlbaniaParty Bosnia & Herzegovina Party-- BulgariaParty CroatiaParty GreeceParty-- MontenegroParty RomaniaParty - SerbiaParty-- The former Yugoslav Republic of Macedonia Party-- Turkey--- European UnionParty

5 Status 1 st amendment only 19 Parties (not in force) It will open Convention to all UN Member States 2 nd amendment only 16 Parties (not in force) It will make review of compliance and reporting mandatory. It will introduce scoping.

6 Focal points & points of contact StatePoint of contactFocal point Albania Ministry of EnvironmentGavrosh ZELA ? Bosnia & Herzegovina Ministry for Foreign AffairsMehmed CERO Bulgaria Ministry of Environment & Water + Jacquelina METODIEVA, Detelina PEICHEVA Jacquelina METODIEVA, Katia NAIDENOVA, Nina STOYANOVA Croatia Nenad MIKULIC Greece Ministry of Foreign Affairs Epaminondas TOLERIS cc: Angekiki PSAILA, Alexandros KOLLIOPOULOS (MoFA) Montenegro Brankica CMILJANOVIC-JOKANOVIC Romania Dorina MOCANU Daniela Eugenia PINETA Serbia Aleksandar VESIC The former Yugoslav Republic of Macedonia Ministry for Environment & Physical Planning Daniela STEFKOVA Turkey Ministry for Foreign Affairs Mustafa ER cc: Tugce YUKSEL

7 Main obligations under the Convention to nuclear energy - related projects Stipulates the obligations of the parties to assess environmental impacts of certain projects at an early planning stage (projects listed in the Appendix I): Large diameter oil and gas pipelines Large dams and reservoirs Lays out means and procedures for preventing, reducing and controlling significant adverse transboundary impacts from proposed activities Clarifies that the impact assessment process must be carried out by the party responsible for causing said impacts A domestic EIA-system is not stipulated explicitly but nevertheless needed for the practical application of the Convention

8 Party of originaffected Party Notification Confirmation of participation in application of Convention Preparation of EIA documentation Distribution of EIA documentation for participation of authorities and public of affected Party Transmittal of information Application stops if the affected Party is not interested in participating Public participation (may include one or more rounds) Consultation between Parties Final decision Transmittal of final decision documentation Post-project analysis If Parties so decide

9 Key issues influencing transboundary EIA application Implementation of the Convention requires the clarification of a number of steps via national legislation and administrative measures Complex process of technical and participatory assessment of transboundary impacts Involvement of the public and officials of both countries - the affected country and country of origin Setting standards, contacts and timelines between the involved parties

10 Key issues influencing transboundary EIA application Environmental values and significant impacts – perception of environmental values and problems is not in every country the same Different decision making process: Strict enforcement of the rules and regulations as tradition in some countries. In others – similar rules are implemented via set of guidelines

11 Good practices Preliminary consultations about Notification stage starting point for discussions between developer, country of origin and affected country through the Ministries of Environment and Foreign Affairs Establishment of “Joint Bilateral/ Multilateral Body” for conducting transboundary EIA processes joint EIA working group created to make the transboundary evaluation of the project periodical meetings working languages should be agreed EIA report agreed evaluation criteria on both sides of the border agreement on alternative solutions

12 Good practices Public participation must be promoted by countries involved take place before the decision making process formal steps for public participation in the EIA process followed countries involved should reach an agreement on tasks and the shared costs implied: translations (what is translated, when and who will pay) joint hearings could be promoted common agreement between parties on publicity in the press, radio and other mass media common agreement on how public comments and objections are received, evaluated and presented in the EIA documentation

13 Good practices Assessment of the EIA report ensuring credibility and technical accuracy of the EIA report ensuring that it includes the opinions of those consulted Final Decision should include the results of the bilateral/multilateral evaluation and of the public participation is announced by the governmental authority (often by the Ministry of Environment) of the country of Origin it should be legally binding appeals settlement procedure (legal system)

14 Issues to be considered Increased complexity of the EIA process with new stages and new participants Transboundary EIA means focusing on a wider impact area to be assessed and taken into account Additional administrative procedures, costs and time taken for the decision making process, but could be avoided if: process elements agreed in advance by the parties involved More transboundary EIA – more experience and knowledge Pilot EIA procedures Guidance and sharing of good practices

15 Application Increasingly routine – number of Parties and number of cases Very approximately 30-50 cases per year

16 Nuclear power plant project in Finland Party of origin: Finland Notification sent to the affected Parties through the Ministry of Environment. The following Parties were notified: Austria (at its own request), Denmark, Estonia, Germany, Latvia, Lithuania, Norway, Poland and Sweden. In addition, the Russian Federation was notified, though it is not a Party to the Convention. Finland & Estonia bilateral agreement The Ministry of Employment and Economy is Competent Authority

17 Nuclear power plant project in Finland Application of the Espoo Convention: To the nuclear power plant project. This activity is listed in the Appendix I to the Espoo Convention – “Nuclear power stations and other nuclear reactors” To a related, planned nuclear waste storage facility. This activity is listed in the Appendix I to the Espoo Convention – “Installations solely designed for the production or enrichment of nuclear fuels, for the reprocessing of irradiated nuclear fuels or for the storage, disposal and processing of radioactive waste”

18 Nuclear power plant project in Finland EIA procedure is divided in two steps: “EIA programme”, setting out the scope of the EIA, is submitted to the authorities. The authorities and the public could provide comments A final “EIA report” is elaborated taking into consideration the comments received in the first step A summary of the EIA programme was translated into the language of each notified Party and this summary was intended for use by the public The whole EIA programme was available in Finnish, Swedish and English Summary of the EIA report was translated into the language of each participating Party. The whole EIA report was available in Finnish, Swedish and English

19 Nuclear power plant project in Finland The public from the affected Parties had the opportunity to comment on the EIA programme and EIA report. Comments, and a description of how they were considered, were included in the EIA report Licensing process included four steps: (1) the “decision in principle” (2) ratification of the decision in principle by Parliament (3) issue of the construction licence and (4) issue of the operating licence LINK (in English) Finnish Ministry on Employment and the Economy (EIA programmes and reports): http://www.tem.fi/index.phtml?l=en&s=1910

20 Bridge over River Danube Between towns of Vidin (Bulgaria) and Calafat (Romania) Agreement between Governments for bridge construction, with joint EIA Joint Working Group on environmental problems Project Implementation & Management Units in competent authorities Proponent: Bulgarian Ministry of Transport & Communications Public participation in each country EIA in English, Bulgarian & Romanian Costs covered by competent authorities 17 comments received during 2 public hearings

21 EIA: practice Enhancing benefits & reducing costs In a transboundary context, also Start early – make transboundary contacts early on, informally at first if appropriate Translate what? and enough – to avoid delays when more information has to be translated Consultations where and when Establish agreements with neighbouring States

22 EIA: practice (developers) Enhancing benefits & reducing costs Scope carefully – focus on what’s important. Lack of proper scoping to determine direction and focus of EIA is likely to cause delays later Scope with others (if appropriate) – involvement, in scoping and preparing terms of reference, of competent authorities and other stakeholders helps to avoid nasty surprises later, as well as building relationships & understanding – especially in transboundary context Don’t short-cut – make sure study is adequate. Failure to undertake systematic study and provide relevant / sufficient data may result in need for supplementary information causing delays Involve the public as early as possible, preferably during scoping Operate strict timetable for each stage of process, and formalize inputs from participants, to achieve shorter timescale

23 EIA: Costs Domestic EIA: money Generally EIA costs less than 0.5 % of overall capital cost Costs over 1% unusual for particularly controversial projects in sensitive environments where good EIA practice not followed Actual costs of EIA tend to rise with capital cost of project

24 EIA: Costs Domestic EIA: money – where it goes 60-90% of costs for assessment process (writing EIA report) Preliminary studies conducted in advance of formal EIA (screening - whether or not EIA required) Cost of reviewing EIA and reaching decision on project (except where fees are charged by competent authority) falls on competent authority

25 Extra costs associated with transboundary EIA Preparing and sending the notification Preparing and broadcasting announcements (e.g. in the media) Translation of documents into the language of the affected country Translation of comments and opinions received from the affected country Additional printing Distribution of documents in the affected country Organization of public hearings (hiring of hall, etc.) Interpretation costs Travel and accommodation Fees charged by the competent authority in the affected country for the review of the EIA documentation, where applicable

26 EIA: time (domestic) EIAs generally completed in under 2 years EIA studies usually conducted in 6-12 months If development in environmentally sensitive area, data for full year normally provided, but faster if information already to hand Preparation of EIA report typically takes 2-3 months Subsequent stages of consultation, review & decision-making may take 3-6 months, depending upon complexity of issues raised These timescales indicative: considerable variation from project to project Source: EIA - A study on costs and benefits, European Commission, 1996

27 Review of implementation Very successful! All Parties in period 2003-2005 eventually reported Questionnaire 2006-2009. Parties to report by the 30 June 2010 on their implementation of the Convention

28 Subregional cooperation in South East Europe Bulgaria (Nov 2008) Subregional workshop, including the relationship between EIA and SEA, Koprivshtitsa (Bulgaria), 17-19 November 2008 Montenegro (Dec 2009) Subregional workshop on raising awareness of application of the Espoo Convention, Podgorica, 15-16 December 2009 Bosnia and Herzegovina ?(2010 )

29 Bucharest Agreement Multilateral agreement among the countries of South-Eastern Europe for implementation of the Espoo Convention (Bucharest, 2008) Depository: Romania StateSignatureRatification Albania- Bosnia & Herzegovina- Bulgaria20 May 200823 Jan 2009 AA Croatia20 May? Greece20 May Montenegro20 May 2009 R Romania20 May? Serbia20 May? The former Yugoslav Republic of Macedonia 20 May

30 Contacts For more about the Espoo Convention, visit our website: www.unece.org/env/eia Or email: eia.conv@unece.org

31 For discussions What are the main transboundary EIA key issues?


Download ppt "Convention on Environmental Impact Assessment in a Transboundary Context (Espoo, 1991) Sandra Ruza, UNECE Secretariat www.unece.org/env/eia Workshop on."

Similar presentations


Ads by Google