“Enhanced Housekeeping Requirements in Egress Paths in Buildings with Polystyrene” ES&H Tier 1 Working Group Meeting Presentation MICHAEL KRETSCHMANN PE.

Similar presentations


Presentation on theme: "“Enhanced Housekeeping Requirements in Egress Paths in Buildings with Polystyrene” ES&H Tier 1 Working Group Meeting Presentation MICHAEL KRETSCHMANN PE."— Presentation transcript:

1 “Enhanced Housekeeping Requirements in Egress Paths in Buildings with Polystyrene” ES&H Tier 1 Working Group Meeting Presentation MICHAEL KRETSCHMANN PE FIRE PROTECTION ENGINEERING February 8, 2011

2 JULY 2010 REPORT: ASSESSMENT OF BROOKHAVEN NATIONAL LABORATORY’S FIRE PROTECTION PROGRAM  Finding 201 O-FP-L 1-1: Egress paths in buildings with elevated fire risks (facilities that lack automatic sprinkler protection or have exposed polystyrene foam insulation* on the HVAC ducts) are not being maintained to assure access to exits are clear, unobstructed, and unencumbered (not to hinder or impede the action or performance of).

3 Polystyrene Polystyrene produces a highly intense fire and a thick black smoke. The intensity of a polystyrene fire has been proven to be able to outrun sprinkler protection in tests.

4 BLDGBuilding Description 0197NNSD/Graphic Arts/NNDC 0459Information Technology Division 0463Biology 0477Research Library 0480*Materials Science 0488Berkner Hall 0490Medical Research Center 0510Physics 0515Information Technology Division 0526Energy Efficiency & Conservation 0535Instrumentation Division 0555**Chemistry 0815EENS Multiprogram Laboratory 0830Environmental Waste Technical Center 0901Radioisotope and Radiotracer C 0902Magnet Division 0911Collider Accelerator Department 0930200 Mev Linac NOTES * Bldg 480 should have the Polystyrene removed with the completion of RSL I project. ** Chemistry should have the poly removed and sprinkler installed with the end of RSl II project. Buildings with Polystyrene

5 Once seven foot wide, now 5 foot. What happens when doors are open and materials are being loaded into the cabinets? “Assure Access to Exits are Clear, Unobstructed, and Unencumbered”

6 Is less better? “Assure Access to Exits are Clear, Unobstructed, and Unencumbered”

7 When three floors of people come down the stairs, does their safety have to rely on the bicycles staying under the stairs? “Assure Access to Exits are Clear, Unobstructed, and Unencumbered”

8 Problems are not always visible from the inside. “Assure Access to Exits are Clear, Unobstructed, and Unencumbered”

9 A temporary blockage can occur during a temporary fire leading to a temporary life loss. “Assure Access to Exits are Clear, Unobstructed, and Unencumbered”

10 Okay? “Assure Access to Exits are Clear, Unobstructed, and Unencumbered”

11 Clear? “Assure Access to Exits are Clear, Unobstructed, and Unencumbered”

12 Is this not acceptable? “Assure Access to Exits are Clear, Unobstructed, and Unencumbered”

13 Starting to get narrower “Assure Access to Exits are Clear, Unobstructed, and Unencumbered”

14 Still not bad? “Assure Access to Exits are Clear, Unobstructed, and Unencumbered”

15 Is this worse? “Assure Access to Exits are Clear, Unobstructed, and Unencumbered”

16 Is this worse? (door can only swing 90 degree due to the tanks) “Assure Access to Exits are Clear, Unobstructed, and Unencumbered”

17 Narrower “Assure Access to Exits are Clear, Unobstructed, and Unencumbered”

18 Next Steps “Assure Access to Exits are Clear, Unobstructed, and Unencumbered”

19 Questions? “Assure Access to Exits are Clear, Unobstructed, and Unencumbered”