Presentation is loading. Please wait.

Presentation is loading. Please wait.

MNCF Equipment Usage Statistics Vijay 29 th November 2011.

Similar presentations


Presentation on theme: "MNCF Equipment Usage Statistics Vijay 29 th November 2011."— Presentation transcript:

1 MNCF Equipment Usage Statistics Vijay 29 th November 2011

2 Electrical (Office Hours) D:Down Time N: Un utilized Utilized

3 Electrical (Non-Office Hours) D:Down Time N: Un utilized U:Utilized

4 Mechanical (Office Hours) D:Down Time N: Un utilized U:Utilized

5 Mechanical (Non-Office Hours) D:Down Time N: Un utilized U:Utilized

6 Material (Office Hours) D:Down Time N: Un utilized U:Utilized

7 Optical (Office Hours) D:Down Time N: Un utilized U:Utilized

8 Optical (Non- Office Hours) D:Down Time N: Un utilized U:Utilized


Download ppt "MNCF Equipment Usage Statistics Vijay 29 th November 2011."

Similar presentations


Ads by Google