Claire Gibson, Wave Hub General Manager 19 February 2013

Similar presentations


Presentation on theme: "Claire Gibson, Wave Hub General Manager 19 February 2013"— Presentation transcript:

1 Claire Gibson, Wave Hub General Manager 19 February 2013
Wave Hub – a case study Claire Gibson, Wave Hub General Manager 19 February 2013

2 Location

3 3

4 Deployment Site 1 x 2 km berths approx Hub located in SW corner
Safety zone around the Hub Six special navigation marks North and south cardinal marks 1 x 2 km berths approx Hub located in SW corner 50 – 6 metre mean sea level Rocky seabed with pockets of sediment 4

5 Design and Consents Renewable energy specialists
Resource assessment Industry demand Multi-disciplinary consultants Engineering design Environmental assessment Offshore surveys Consultation Planning and legal advice Consent applications Lease agreements Funding 5

6 Environmental Impact Terrestrial ecology Intertidal ecology
Subtidal ecology Ornithology Marine ecology Fish and fisheries study Cetacean survey Water quality Coastal processes study Marine traffic survey Navigation risk assessment Sediment quality Archaeological assessment Landscape and visual amenity Underwater video Socio-economics

7 Manufacture and Installation
Subsea cable and hub design and manufacture Onshore directional drilling Substation construction Electrical equipment Cable installation Cable protection and stabilisation Navigation marks Project management Project managers Manufacturing and fabrication Electrical engineers Civil and construction engineers Marine and subsea operators Environmental scientists IT 7

8 Wave Hub Operations Operations Team Technical Suppliers
Marine operators Electrical engineers Business development Finance managers Public policy and programme delivery Technical Suppliers Oceanographic and geotechnical surveys Communications and instrumentation Metocean data analysis Vessel operators Services – legal, commercial, finance, insurance, PR 8

9 Device Developers Project managers Naval architects
Electrical, mechanical and marine engineers Cable manufacturers Monitoring and data acquisition equipment Marine operations Environmental consultants Commercial expertise 9

10 Hayle Marine Renewables Business Park

11 A Revolution? Collaboration is essential