1 1 Warm Magnets Work Package Status J. Bauche, TE-MSC Technical Meeting, 9th January 2014.

2 2 Outline Magnet work packages Warm magnets in LINAC and HEBT Budget Production status - Dipoles - Quadrupoles - H/V correctors Magnetic measurements Conclusions

3 3 Magnet Work Packages TE/MSC/MNC  Design of magnets  Procurement in industry  Tests and electro-mechanical measurements  Installation and commissioning TE/MSC/MM  Magnetic characterization of pre-series magnets and check of series magnets  Fiducialization of quadrupole magnets  Hall probes for on-line B field measurement on dipoles

4 4 4 + 3* dipoles (TESLA, UK) 24 + 8* quads (ELYTT, ES) 13 + 10* H/V steerers (ANTEC, ES) * Options additional to baseline order Warm Magnets in LINAC and HEBT HEBT magnet installation schedule: starts in September 2014

5 5 Budget Overall envelope ~ 2 MCHF (incl. 200 kCHF for magnetic measurements, and 300 kCHF for supporting system)

6 6 Dipoles  Curved C-shape magnet with PFR = ½ bending angle  Glued laminated yoke with welded reinforcement plates  Water-cooled racetrack coils (glass fiber - epoxy insulation)

7 7 SupplyContractual delivery dates Manufacturing file, schedules and samples13th December 2013 Pre-series dipole30th May 2014 One series dipole1st August 2014 Two series dipoles + coils10th October 2014 Two optional series dipoles5th December 2014 One optional series dipole5th January 2015 1 st beam line  Contract placed at Tesla (lamination stamping at Righton & Sons, UK)  Manufacturing file received (final iteration before approval)  Raw materials ordered, tooling manufacture in progress Dipole Production Status - On schedule so far; magnet and tooling design convincing - Stamping at sub-contractor to be carefully followed-up

8 8 Quadrupoles  Glued laminated yoke reinforced with solid end-plates and tie rods  Bolted assembly of quadrants  Water-cooled racetrack coils (glass fiber - epoxy insulation)

9 9 SupplyContractual delivery dates Manufacturing file, schedules and samples14th October 2013 Two pre-series quadrupoles14th April 2014 Four series quadrupoles (batch #1)30th May 2014 Four series quadrupoles (batch #2)27th June 2014 Four series quadrupoles (batch #3)25th July 2014 Four series quadrupoles (batch #4)15th September 2014 Four series quadrupoles (batch #5)13th October 2014 Two series quadrupoles + coils (batch #6)27th October 2014 Four series quadrupoles (optional batch #1)24th November 2014 Four series quadrupoles (optional batch #2)22nd December 2014 1 st beam line Quadrupole Production Status  Contract placed at Elytt (lamination stamping at Omedec, FR)  Manufacturing file received (final iteration before approval)  Raw materials ordered, tooling manufacture in progress - On schedule so far; transparent attitude form manufacturer - Not experienced with laminated yokes, but reactive to proposals

10 10 H/V correctors  Compact window frame solid iron yoke  Bolted assembly  Water-cooled racetrack coils (glass fiber - polyimide - epoxy insulation) 90 mm

11 11 SupplyContractual delivery dates Manufacturing file, schedules and samples7th February 2014 One pre-series H/V steerer20th June 2014 Four series H/V steerers (batch #1)8th August 2014 Four series H/V steerers (batch #2)29th August 2014 Four series H/V steerers (batch #3)19th September 2014 Four series H/V steerers (optional batch #1)10th October 2014 Four series H/V steerers (optional batch #2)31st October 2014 Two series H/V steerers (optional batch #3)14th November 2014 1 st beam line H/V corrector Production Status  Contract placed  Kick-off meeting held  Insulated copper ordered (CERN supply via Luvata (FI) and Sofilec (FR)) - Quality issues experienced on products delivered in the past - New chance given with this contract, to be carefully followed-up

12 12 Magnetic Measurements (1/2) Bent flux-meter development  Magnetic measurement specification discussed with beam optics physicists  need longitudinal distribution of the field  Dipole: –Pre-series: full characterization requires Hall probe 3D mapper (LEP tool to be refurbished) –Series: integrated field mapping with bent flux-meter

13 13 Magnetic Measurements (2/2)  Quadrupole: –Pre-series: need measurement of field gradient in center + longitudinal profile (3D mapping, but few points and small size) –Series: integrated field harmonics with rotating coil (existing equipment) + fiducialization with stretched wire  H/V correctors: –Pre-series: measurement of field longitudinal profile (3D mapping, small size) + stray field at several locations (magnetic interference) –Series: integrated field harmonics with rotating coil (existing equipment), possibly with sampling (one magnet per batch)  Important workload from this project, can be quite challenging in terms of resources

14 14  Magnet production –All contracts placed; budget within estimates –Dipoles and quadrupoles: manufacturing design completed; raw materials ordered; tooling manufacture in progress –H/V correctors: manufacturing design in progress  Technical (and schedule) risks –Dipoles: lamination stamping sub-contractor not experienced with accelerator magnets –Quadrupoles: manufacturer unexperienced with laminated yokes –Steerers: quality issues from manufacturer in the past  Magnetic measurements –Scope defined; standard measurements for quadrupoles and steerers –Refurbishment / development of tooling required for dipoles –Important workload of this project will add to the present situation Conclusions

15 15 Spare slides

16 16 Dipoles Parameters

17 17 Quadrupoles Parameters

18 18 H/V correctors Parameters


Download ppt "1 Warm Magnets Work Package Status J. Bauche, TE-MSC Technical Meeting, 9th January 2014."

Similar presentations


Ads by Google