Presentation is loading. Please wait.

Presentation is loading. Please wait.

Presented by “Weather Warriors” Susan Gardner Ann Elmer CIS 1020–045 Spring 2011.

Similar presentations


Presentation on theme: "Presented by “Weather Warriors” Susan Gardner Ann Elmer CIS 1020–045 Spring 2011."— Presentation transcript:

1

2 Presented by “Weather Warriors” Susan Gardner Ann Elmer CIS 1020–045 Spring 2011

3 For President Bioteau Salt Lake Community College

4 Proposal Provide covered walkways between buildings Shelter students and faculty from inclement weather

5 Benefits Decrease travel time between classes Help prevent illness Reduce injuries Alleviate exposure Minimize tardies and absences Cost savings from reduced ground maintenance

6 Total Cost Benefits ExpenseBefore walkwayAfter walkwayTotal savings per yearTotal savings after 10 years Annual snow removal$5,000$1,000$4,000$40,000 Annual litigation$12,000$2,000$10,000$100,000 Total$17,000$3,000$14,000$140,000

7 Total Cost Benefits

8 Estimated Start-up Costs Estimated Start-Up Cost for 100' Length Material typeCostUnit length in feetQuantity Installation at $75/hrInstallation costTotal cost Wood$40010 8600$4,600 Plastic$5501288600$5,183 Steel$62510 8600$6,850 Solar$80010 750$8,750

9 Estimated Start-up Costs

10 Conclusion Don’t walk away from the benefits and safety we at Weatherproof Walkways can provide for the students and faculty at Salt Lake Community College

11 Thank you We would like to thank you, President Bioteau for taking time out of your busy schedule to review our proposal.


Download ppt "Presented by “Weather Warriors” Susan Gardner Ann Elmer CIS 1020–045 Spring 2011."

Similar presentations


Ads by Google