Presentation is loading. Please wait.

Presentation is loading. Please wait.

DNP/UCAIug Joint Meeting 2011 Greetings – Erich Gunther, Enernex – UCAIug Board Chair UCAIug Update – Kay Clinard, UCAIug President CIMug Update – Greg.

Similar presentations


Presentation on theme: "DNP/UCAIug Joint Meeting 2011 Greetings – Erich Gunther, Enernex – UCAIug Board Chair UCAIug Update – Kay Clinard, UCAIug President CIMug Update – Greg."— Presentation transcript:

1 DNP/UCAIug Joint Meeting 2011 Greetings – Erich Gunther, Enernex – UCAIug Board Chair UCAIug Update – Kay Clinard, UCAIug President CIMug Update – Greg Robinson, Xtensible IEC61850ug Update – Christoph Brunner, it4power OSGug Update – Erich Gunther, Enernex Testing Update – Bruce Muschlitz, Enernex UCAIug IOP 2011 – Herb Falk, SISCO

2 Update on Organizational Issues OSGug has just completed elections for two open TC seats…Marty Burns, and John Simmins are the two new members EC has just completed elections for three open seats for OSG representation…Aaron Snyder, Gary Stubbing, Klaus Bender are the three new members Will be seeking nominations for three more EC members.

3 UCAIug 2011 Plan 2011 we will focus on member recruitment – Being in contact with existing members – Customer Satisfaction Survey – Revising membership structure – Tightening document access – Increasing meeting costs for non-members – Complete IPR and put in place

4 UCAIug 2011 Plan, cont.. Last year we started acquiring equipment required for meeting support…projectors, phones, room sound systems. For 2011 the goal is to: – Streamline meeting planning process – Minimize charges where possible – Use hotel staff to install and manage UCAIug supplied equipment – Use additional technical support where needed for A/V.

5 UCAIug 2011 Plan, cont… 2011 Daily Operations – Continuing support of SGIP – Identify tasks that where additional/other resources can be used – Use proceeds from Meetings to pay for additional resources as available – Streamline credit card collections accounting process Now Using PayPal for all cards Automating Data Collection & Reporting – Meeting registration process Now using RegOnLine…evaluate using Cvent

6 UCAIug Budget

7 Where the Budget Goes Projected Expense Professional Fees$17,500 Customer Relations$8,000 Web Presence$98,200 Marketing$24,000 Meetings$315,988 Testing Committee$90,000 Expansion Plan to Establish Utiliy Forum$30,000 Daily Operations$235,930 Bank and Credit Card Fees$15,400 Total Projected Proposed Budget Expenditures$835,018 Projected 2009 Income Less Expenditures$30,382 Balance brought forward from 2010 operations-$30,000 Projected Balance at end of 2011 operations$382

8 CIMUG UPDATE Greg Robinson, Xtensible Solutions

9 IEC 61850 update Christoph Brunner Christoph.brunner@it4power.com

10 New parts Domain specific object models – IEC 61850-7-4, Ed 2: Basic communication structure – Compatible logical node classes and data object classes – IEC 61850-7-410: Hydroelectric power plants – Communication for monitoring and control – IEC 61850-7-420: Communications Systems for Distributed Energy Resources (DER)

11 Documents in preparation IEC 61850-7-5 – Use of the basic elements of IEC 61850 models IEC 61850-7-500 – Use of logical nodes to model the functions of a substation automation system IEC 61850-7-510 – Use of logical nodes to model the functions of a hydro power plant

12 Mappings for gateways IEC 61850-80-1 – Guideline to exchange information from a CDC based data model using IEC 60870- 5-101 / -104 IEEE 1815.1 – Exchanging Information between networks Implementing IEC 61850 and IEEE1815 (DNP3) – Intended to become a IEC dual logo standard (IEC 61850-80-2) DNP Master DNP Outstation IEC 61580 Client IEC 61850 Device Gateway

13 How to address new areas? Prepare technical reports "how to use IEC 61850 for... " Technical reports describing – The use cases considered – The impact on the communication – The impact on the modeling – The impact on the engineering Results will be used to update the standards (Amendment / new Edition)

14 WG10 technical reports IEC 61850-90-1: Using IEC 61850 for communication between substations (published) IEC 61850-90-2: Using IEC 61850 for communication between substations and control center IEC 61850-90-3: Using IEC 61850 for condition monitoring IEC 61850-90-4: Network engineering guidelines IEC 61850-90-5: Using IEC 61850 to transmit synchrophasor information according to IEEE C37.118

15 WG17 technical reports IEC 61850-90-6: Using IEC 61850 for distribution automation IEC 61850-90-7: IEC 61850 object models for photovoltaic, storage and other DER inverters IEC 61850-90-8: IEC 61850 object models for electrical vehicles IEC 61850-90-9: IEC 61850 object models for battery storage systems  Provide a "fast track" for urgently needed models for SmartGrid applications  Supported by the name space concept of IEC 61850

16 Other activities Develop methodologies for testing of functions in IEC 61850 based systems Define aspects of modeling distributed logic Prepare UML model of IEC 61850 Prepare webbased access to IEC 61850 models

17 Status Edition 2 Published: Parts 6, 7-2, 7-3, 7-4 FDIS: Parts 4, 7-1, 8-1, 9-2 CDV: Part 5, 10 CD: Part 3 Circulated as DC – in preparation for DTR: Part 1 Withdrawn: Part 9-1

18 http://osgug.ucaiug.org/

19 2010 OpenSG WG Specific Objectives SG Simulation – NEW for 2010! – Establish WG, chairman, charter SG Systems OpenADR Build CIM into OpenADR specifications Harmonize OpenADR with other TFs (OpenHAN, OpenADE, Conformance, etc.) OpenADE OpenADE 1.0 SRS: February 2010 OpenADE 2.0: User Requirements Q2 2010 OpenADE 2.0: System Requirements / Service Definitions Q4 2010 OpenHAN OpenHAN 2.0 SRS ratified by OpenSG SG Communications Finalize the PAP 2 Task 1 and 3 OpenSG Interim Report #2 Meet with NIST and IEEE 802 to begin work on PAP 2 Task 4 (mapping of OpenSG application requirements to the inventory of wireless standards) Agree to high level statement on Network Interoperability Scope and Charter and begin work SG Conformance Agree upon (simple) definitions for Conformance and Interoperability and “Abstract Test Cases” and “Concrete Test Cases” Agree upon a language (framework, taxomomy) upon which to build abstract test cases Edge Conformance Complete Certification Process Reference Manual SG Security Establish coordinated support for other OpenSG working groups & task forces Revise the AMI Security Profile Address additional security profiles as produced by ASAP-SG

20 Next Meeting South San Francisco – Embassy Suites SFO March 7: OpenSG Boot Camp Sessions March 8 – 10: User Group General and Work Group Sessions

21 UCA TESTING PAST, PRESENT, AND FUTURE UCAI MEETING SAN DIEGO, CA FEBRUARY 1, 2011 Bruce Muschlitz Committee co-chair www.ucaiug.org February 1, 2010UCA IUG Testing Past, Present, and Future

22 February 1, 2010 UCA IUG Testing Past, Present, and Future 22 Testing Committee Background Group created during UCA IUG creation Began work 2005 Technical Tasks Test Procedures Quality Assurance Program Tester Accreditation Administrative Tasks Maintain Conformance Certificates Maintain testing documents

23 February 1, 2010 UCA IUG Testing Past, Present, and Future 23 Testing Subcommittee Charter Single point focus for UCA IUG Arbitrates technical issues Coordinates groups within UCA 61850 Testing Open Smart Grid Conformity CIM Interoperability Requires utility rep as co-chair Now technically in violation (volunteers?)

24 February 1, 2010 UCA IUG Testing Past, Present, and Future 24 NIST SmartGrid Developments NIST is an international collaboration Smart Grid Interoperability Panel SG Testing and Certification Committee InterOp Process Reference Manual Best practices InterOp Testing and Certification Authority Mandates CB adhere to ISO/IEC Guide 65 Mandates Tester adhere to ISO/IEC 17025 NIST needs organization(s) to pilot IPRM

25 February 1, 2010 UCA IUG Testing Past, Present, and Future 25 UCA Pilot of NIST IPRM UCA has volunteered to pilot IPRM UCA procedures almost meet IPRM UCA status will be improved Some changes needed: UCAS and testers UCA to become Guide 65 Certification Body UCA must adopt formal quality management sys UCA will issue (sign off on) certificates Testers to become 17025 certified/compliant Tester will not have final say on certificate issue UCA will review the “tester file” before cert issued

26 February 1, 2010 UCA IUG Testing Past, Present, and Future 26 UCA Pilot of NIST IPRM (cont.) 2011 is transition year for IPRM User Group need to declare ITCA intent Lack of progress nullifies that declaration Changes needed Create quality manual for UCA testing Have testers upgrade 9001 -> 17025 Remove tester authority to issue certificates Significant per-test UCA work(review all tests) Testing fees might be considered

27 February 1, 2010 UCA IUG Testing Past, Present, and Future 27 Questions ?

28 Systems Integration Specialists Company, Inc. The Standards Based Integration Company © Copyright 2011 SISCO, Inc. 28 Report on UCA User Group IOPs 2011

29 © Copyright 2011 SISCO, Inc. 29 What’s being tested UCA IEC 61850CIM

30 © Copyright 2011 SISCO, Inc. 30 Rules of engagement IOPs are closed except to: Participants Witnesses Each IOP team develops their own use cases, test procedures, and expected results. Testing will occur in a distributed or centralized fashion and will be closed to team members only (week of March 28 th ). Test reports will be generated by each team and made available to UCA User Group members.

31 © Copyright 2011 SISCO, Inc. 31 61850 Tests 61850 GOOSESV SCL (CID and SCD) Client/Server Infrastructure

32 © Copyright 2011 SISCO, Inc. 32 Witnesses EDF eRDF KEMA Prosoft Red Electrica de Espanma

33 © Copyright 2011 SISCO, Inc. 33 61850 - Infrastructure Test objectives: To test Rapid Spanning Tree Protocol (RSTP) as a recovery mechanism for Ethernet within a substation. Test will include performance as well as interoperability. Test Participants: Hirschmann RuggedCom Siemens Schweitzer Engineering Laboratories ZIV

34 © Copyright 2011 SISCO, Inc. 34 61850 IOP – SV Testing PublishersSubscribers AlstomSELBoth SEL RTDS

35 © Copyright 2011 SISCO, Inc. 35 IEC 61850 Client/Server Tests Purpose: To test Reads, Direct Control, un-buffered reporting, buffered reporting, and COMTRADE file transfer. Participant Matrix: One more participant may be joining.

36 © Copyright 2011 SISCO, Inc. 36 IEC 61850 – GOOSE Testing Test purpose: Interoperability of DataSet member types.

37 © Copyright 2011 SISCO, Inc. 37 CIM Testing CIM IEC 61970 Part 4 and 13 TopologyEquipmentAssetsGIS IEC 61968 Part 3Part 9Middleware

38 © Copyright 2011 SISCO, Inc. 38 61968 – Part 4 & Part 13 Test objectives: To test the exchange of full and incremental network models that contain sufficient information to allow a DMS to produce a Power Flow. Test will include interoperability of multiple systems including GIS and DMS systems from several vendors. Test Participants: GE Telvent Siemens EDF EPRI Alstom ABB TIBCO SISCO

39 © Copyright 2011 SISCO, Inc. 39 Witnesses Oncor SunGard Tenet ERDF

40 © Copyright 2011 SISCO, Inc. 40 61968 – Part 3 Test objectives: To test the exchange of an Outage Notification message between an OMS and other Backoffice Systems. Test will include interoperability of multiple systems including OMS, AMI and MDM systems from several vendors. Test Participants: GE Telvent Grid-Net Siemens Alstom AEP Consumers Energy TIBCO Oracle

41 © Copyright 2011 SISCO, Inc. 41 Witnesses Oncor SunGard Tenet AEP Consumers Energy

42 © Copyright 2011 SISCO, Inc. 42 61968 – Part 9 Test objectives: To test the exchange of at least 7 Meter Reading and Control messages between metering systems and other Backoffice Systems. Test will include interoperability of multiple systems including AMI, MDM, OMS systems from several vendors. Messages that will be Tested: Meter Readings EndDeviceEvents EndDeviceControls PanDeviceEvents PanDeviceControls PanDeviceAssets MeterAssetConfig CoincidentMeterReadings

43 © Copyright 2011 SISCO, Inc. 43 61968 – Part 9 Test Participants: GE Telvent Grid-Net Ecologic Analytics Landis & Gyr AEP Consumers Energy TIBCO Oracle eMeter Elster Aclara Itron UISOL

44 © Copyright 2011 SISCO, Inc. 44 Witnesses Oncor SunGard Tenet AEP Consumers Energy Kema EDF

45 © Copyright 2011 SISCO, Inc. 45 Middleware/Integration Tests Tests will include the use of Web Services and JMS Topics and Queues Integration patterns will include those found in 61968-1-1 and 61968-1-2 Middleware Vendors include: TIBCO IBM WebSphere Oracle WebLogic

46 Questions ?


Download ppt "DNP/UCAIug Joint Meeting 2011 Greetings – Erich Gunther, Enernex – UCAIug Board Chair UCAIug Update – Kay Clinard, UCAIug President CIMug Update – Greg."