Presentation is loading. Please wait.

Presentation is loading. Please wait.

CAS Array DAG MBX-A MBX-B DB1 Load Balancer.

Similar presentations


Presentation on theme: "CAS Array DAG MBX-A MBX-B DB1 Load Balancer."— Presentation transcript:

1

2

3

4

5 CAS Array DAG MBX-A MBX-B DB1 Load Balancer

6 Bring experience from the service to the enterprise Monitor end user experience Restore end user experience with recovery actions

7

8 Availability Can I access the service? Latency How is my experience? Errors Am I able to accomplish what I want? Availability Errors Latency Customer Touch Points

9 —OWA send probe —OWA failure monitor —OWA fast recovery responder —OWA verified as healthy —OWA send probe —OWA failure monitor —OWA fast recovery responder —Failover database responder —OWA verified as healthy —MBX1 is failover target LBCAS1 CAS2 DAG MBX1 DB1 DB2 MBX2 OWA DB1 DB2 MBX3 OWA DB1 DB2 OWA DB1 “Stuff breaks, but the experience does not”

10

11 Monitor Evaluate probe data System Center Operations Manager Exchange Server 2013 Managed Availability

12

13 Monitor Evaluate probe data

14

15

16 PROACTIVEREACTIVE 20s 5min 20min System Level Checks Mailbox Self Test (e.g. OWA MST) [detection 5m] Protocol Self Test (e.g. OWA PST) [detection 20 secs] Proxy Self Test (e.g. OWA PrST) [detection 20 secs] End User Experience Level Checks Customer Touch Point – CTP ( e.g. OWA CTP) [detection 20m]

17 Monitor States Sampling DetectionRecovery Probe Definition Monitor Definition Responder Results (Responses) Responder Definition T3 00:00:00 00:00:10 00:00:30 Restart Reset AppPool Failover Bugcheck Offline Escalate Sequenced Responder Pipeline Named Times Probe Results (Samples) Responder Probe Notification Item Monitor Results (Alerts) Healthy T1 T2 Monitor

18

19

20

21

22

23

24

25

26

27

28

29

30

31 31

32 32

33 Protocol Health Set Proxy Health Set CTP Health Set OWA OWA.Proxy OWA.Protocol System Level Checks Mailbox Self Test (e.g. OWA MST) [detection 5m] Protocol Self Test (e.g. OWA PST) [detection 20 secs] Proxy Self Test (e.g. OWA PrST) [detection 20 secs] End User Experience Level Checks Customer Touch Point – CTP ( e.g. OWA CTP) [detection 20m] PROACTIVEREACTIVE 20s 5min 20min

34

35

36

37

38

39

40

41

42

43

44

45

46

47

48

49

50

51

52

53

54

55

56 Bring experience from the service to the enterprise Monitor end user experience Restore end user experience with recovery actions

57

58

59

60

61 www.microsoft.com/learning http://microsoft.com/msdn http://microsoft.com/technet http://channel9.msdn.com/Events/TechEd

62

63

64


Download ppt "CAS Array DAG MBX-A MBX-B DB1 Load Balancer."

Similar presentations


Ads by Google