Tier 2 Prague Institute of Physics AS CR Status and Outlook J. Chudoba, M. Elias, L. Fiala, J. Horky, T. Kouba, J. Kundrat, M. Lokajicek, J. Svec, P. Tylka.

Similar presentations


Presentation on theme: "Tier 2 Prague Institute of Physics AS CR Status and Outlook J. Chudoba, M. Elias, L. Fiala, J. Horky, T. Kouba, J. Kundrat, M. Lokajicek, J. Svec, P. Tylka."— Presentation transcript:

1 Tier 2 Prague Institute of Physics AS CR Status and Outlook J. Chudoba, M. Elias, L. Fiala, J. Horky, T. Kouba, J. Kundrat, M. Lokajicek, J. Svec, P. Tylka 13. September 20131NEC2013 Varna M. Lokajicek

2 Outline Institute of Physics AS CR (FZU) Computing Cluster Networking LHCONE Looking for new resources – CESNET National Storage Facility – IT4I supercomputing project Outlook 11 September 2013 2

3 Institute of Physics AS CR (FZU) Institute of Physics of the Academy of the Czech Republic 2 locations in Prague, 1 in Olomouc – In 2012: 786 employees (281 researchers + 78 doctoral students) – 6 Divisions Division of Elementary Particle Physics Division of Condensed Matter Physics Division of Solid State Physics Division of Optics Division of High Power Systems ELI Beamlines Project Division Department of Networking and Computing Techniques (SAVT) 311 September 2013

4 FZU - SAVT Institute’s networking and computing service department – Several server rooms – Computing clusters Golias – Particle physics, Tier2 Few nodes from already before EDG WLCG iMoU 4 July 2003 (interim) New server room 1 November 2004 WLCG MoU from 28 April 2008 – Dorje – solid state, condensed matter Luna, Thsun, smaller group clusters 11 September 20134

5 Main server room Main server room (in FZU, Na Slovance) – 62 m2, ~20 racks, 350 kVA motor generator, 200 + 2 x 100 kVA UPS, 108 kW air cooling, 176 kW water cooling – continuous changes – hosts computing servers and central services 11 September 20135

6 6

7 Cluster Golias Upgraded every year several (9) sub-clusters of the identical HW 3800 cores, 30 700 HS06 2 PB disk space Tapes used only for local backups (125 LTO4, max 500 cassettes) Serving: ATLAS, ALICE, D0 (NOvA), Auger, STAR, … WLCG Tier2 Golias@FZU + xrootd servers@REZ (NPI) 11 September 20137

8 Utilization Very high average utilization – Several different projects, different tools for production – D0 – production submitted locally by 1 user – ATLAS – panda, ganga, local users; DPM – ALICE – VO box; xrootd 11 September 20138 D0 ATLAS ALICE 3.5 k

9 „RAW“ Capacities HEPSPEC2006%TB disk% 200910 340186 201019 064100427100 201123 4841001 714100 201229 6601002521100 D09 99334351 ATLAS12 12741411880 (+16 MFF)7474 ALICE7 5402525606(+100 Řež)2424 201329 6601002521100 D09 99334351 ATLAS12 12741411880 (+16 MFF)7474 ALICE754025606(+140 Řež)2424 911 September 2013

10 2012 D0, ATLAS and ALICE usage ATLAS 2,2 M tasks 90 MHEPSEPC06 hours, 1,9 PB disk space Data transfer 1,2 PB to farm 0,9 PB from farm 2% contribution to ATLAS ALICE 2 M simulation tasks 60 MHEPSEC06 hours Data transfer 4,7 PB to farm and 0,5 PB from farm 5% our contribution to ALICE tasks processing 140TB disk space in INF (Tier3) 10 2012 Data transfers inside farm - month means to and from working nodes in TB 11 September 2013 D0 290 M tasks 90 MHEPSPEC06 hours 13% contribution to D0

11 11 September 201311

12 Network - CESNET, z. s. p. o. FZU Tier2 Network connections – 10 Gbps LHCONE (GEANT), 18 July 2013 – 10 Gbps KIT from 1 st Sept 2013 1211 September 2013 – 1 Gbps FNAL, BNL, Taipei – 10 Gbps to commodity network – 1-10 Gbps to Tier3 collaborating institutes http://netreport.cesnet.cz/netreport/hep-cesnet-experimental-facility2/

13 LHCONE - Network transition 11 September 201313 Link to KIT saturated at 1 Gbps E2E line LHCONE from 18 July 2013 over 10 Gbps infrastructure Relieves also the commodity network 10 Gbps

14 Atlas tests Testing upload speed of files > 1 GB to all Tier1 centra After LHCONE connection only 2 sites with < 5MB/s Prague Tier2 ready for validation as T2D 11 September 201314 30 60

15 LHCONE – trying to understand monitoring L 11 September 201315 Prague – DESY Very asymmetric throughput LHCONE line cut DESY – Prague LHCONE optical line cut At 4:00 One way latency improved

16 International contribution of Prague center to ATLAS + ALICE centra T2 LCG http://accounting.egi.eu/ Grid + local tasks Long term slide down until we received regular financing in 2008 Original 3% target is not achievable with current financial resources Necessary to look for other resources 1611 September 2013

17 Remote storage 11 September 201317 CESNET - Czech NREN + other services New project: National storage facility FZU Tier-2 in Prague CESNET storage site in Pilsen 100km FZU Pilsen - 10Gbit link with ~3.5ms latency Three distributed HSM based storage sites Designed for research and science community – 100TB for both ATLAS and Auger experiments offered – Implemented as remote Storage Element with dCache – disk tape migration

18 Remote storage 1811 September 2013 remote/localMethodTTreeCacheevents/s ( %)Bytes transferred % CPU Efficiency localrfioON100%117%98,9% localrfioOFF74%100%72,7% remotedCapON75%101%73,5% remotedCapOFF46%100%46,9% TTreeCache in ROOT helps a lot – both for local and for remote transfers TTreeCached remote jobs faster than local ones without the cache Influence of distributing a Tier-2 data storage on physics analysis

19 Outlook In 2015 after LHC start up – Higher data production – Flat financing not sufficient – Computing can become an item of M&O A (Maintenance &Operations cat. A) Search for new financial resources or new unpaid capacities necessary – CESNET Crucial free delivery of network infrastructure Unpaid External storage, how long? – IT4I, Czech supercomputing project search for computing capacities (free cycles), relying on other project to find the way how to use them 1911 September 2013

20 16 th International workshop on Advanced Computing and Analysis Techniques in physics (ACAT) http://www.particle.cz/ acat2014 http://www.particle.cz/ acat2014 Topics Computing Technology for Physics Research Data Analysis - Algorithms and Tools Computations in Theoretical Physics: Techniques and Methods 11 September 201320

21 Backup 11 September 201321

22 LHCONE LHCOPN Excellent experience with centers for Tier0 and Tier1 communication LHCONE – L3 layer VPN network between Tier1 and Tier2 to complement LHCOPN Effectively avoids firewalls and asymmetric routing National providers interested, helps to isolate big traffic Monitored by Perfsonar PS Czech Republic connected since 18 July 2013 22 Earlier status LHCONE communication between all Tier123 centra 11 September 2013

23 After transitionLHCONE LHCONE Commodity network – Share reasonably the load 11 September 201323


Download ppt "Tier 2 Prague Institute of Physics AS CR Status and Outlook J. Chudoba, M. Elias, L. Fiala, J. Horky, T. Kouba, J. Kundrat, M. Lokajicek, J. Svec, P. Tylka."