Gas systems for GIF++ 14/02/2015 Ernesto Regaño 1.

Similar presentations


Presentation on theme: "Gas systems for GIF++ 14/02/2015 Ernesto Regaño 1."— Presentation transcript:

1 Gas systems for GIF++ 14/02/2015 Ernesto Regaño 1

2 14/02/2015 Ernesto Regaño 2 Summary: Status and plan Detailed status. Future growth of the systems’ facility. Overview

3 Summary 29.06.2012 3 Preferred installation periods and Duration W08 (false floor) 1week. W09 (complete piping) 3 days. W16 (closed loop connection) 3-5 days Specific needs Need to open the false floor and limit the access to avoid any falling accident. RP vacuum cleaner. Present status. Temporary Lack of false floor due to hard work needed to prepared and because was completely different from all other experimental zones in EHN1. Gas available from w10 ( for RPC, TGC)

4 14/02/2015 Ernesto Regaño 4 System StatusTo be done Panels ValidatedNothing RPC-TGC Mixers On hold for the spill retention traySupply pipe work with welding, Connection to analysis rack, two pipe lines between Atex and not Atex rack, connection of T for RPC mixture, Plastic exhaust connections. Electrical work form MFCs, and humidifier, functional test. Gas service zone Waiting for aluminium profiles. Spill retention tray To be welded and installed Install aluminium profile for suport the false floor. False floor already cut and in traspor to GIF++, (Minor cuts in the false floor tiles needed). IR Analisis rack Waiting for 1 pipe work1 Pipe work,electrical work, Funtional test and RUN, Permanent 24v Power supply needed H2O-O2 Analisis Being leak testedLeak testing, Transport, Electrical work, Permanent 24v Power supply needed Pipe cable tray and exhaust pipe support Pipe cable Tray instaled, Exhaust pipe to be anchored to the wall properly. Detailed Actual Status.

5 14/02/2015 Ernesto Regaño 5 In the Beginning: Progress of the works.

6 14/02/2015 Ernesto Regaño 6 Now At Irradiation bunker and Preparation area: Progress of the works.

7 14/02/2015 Ernesto Regaño 7 Now, at the Gas Service Area Progress of the works.

8 14/02/2015 Ernesto Regaño 8 H2O-O2 Analisis rack to be instaled Closed loop (RPC cosmic trigger) ready to be instaled, calibrated and used. W16. Several Mixers (paied by the users) will be build and Instaled. Small closed loop racks (paied by the users) will be build and Instaled. Control rack to be discussed and defined. Other Users needs. Coming upgrades

9 14/02/2015 Ernesto Regaño 9 PH-DT-DI/Gas Service Team Thanks to: