Presentation is loading. Please wait.

Presentation is loading. Please wait.

Assembly of Passive sampler PUF setting Passive sampler setting 1 month later PUF withdrawal PUF shipping Passive sampling Takeshi Nakano Osaka Unversity.

Similar presentations


Presentation on theme: "Assembly of Passive sampler PUF setting Passive sampler setting 1 month later PUF withdrawal PUF shipping Passive sampling Takeshi Nakano Osaka Unversity."— Presentation transcript:

1 Assembly of Passive sampler PUF setting Passive sampler setting 1 month later PUF withdrawal PUF shipping Passive sampling Takeshi Nakano Osaka Unversity

2 Small bowl Big bowl Small bowl Big bowl Lower side Upper side Lower side Upper side long short long short

3 Long side screw to Small bowl Long side screw to Small bowl Small bowl Lower side Small bowl Lower side nut as stopper

4 Long side screw Small bowl Long side screw Small bowl Long side screw Small bowl Long side screw Small bowl Start to fix outside by a nut

5 Fixed outside by a nutRing mounting Finish lower side (small bowl)

6 Upside down PUF setting PUF center cutting to pass through rod

7 Lower side Small bowl Upper side Big bowl Upper side Big bowl Upper side Big bowl

8 Passive sampler Dry deposition sampler Passive sampler

9 Active sampler Low volume mini pump Passive sampler

10 Active sampler Low volume mini pump Flow meter Thermometer / Humidity Thermo / Humidity recorder Solid phase adsorbent (PS-Air cartridge) Active sampler Low volume mini pump

11 Solid phase adsorbent (PS-Air cartridge) Thermo / Humidity recorder Active sampler Low volume mini pump

12 PUF shipping 1 month later after passive sampler setting

13

14

15

16 PUF shipping

17


Download ppt "Assembly of Passive sampler PUF setting Passive sampler setting 1 month later PUF withdrawal PUF shipping Passive sampling Takeshi Nakano Osaka Unversity."

Similar presentations


Ads by Google