PROJECTS IN THE PIPELINE IN SOUTHERN REGION. PROJECTS IN THE PIPELINE IN SR GENERATION EVACUATION PROJECTS GENERATION EVACUATION PROJECTS GENERATION EVACUATION.

Similar presentations


Presentation on theme: "PROJECTS IN THE PIPELINE IN SOUTHERN REGION. PROJECTS IN THE PIPELINE IN SR GENERATION EVACUATION PROJECTS GENERATION EVACUATION PROJECTS GENERATION EVACUATION."— Presentation transcript:

1 PROJECTS IN THE PIPELINE IN SOUTHERN REGION

2 PROJECTS IN THE PIPELINE IN SR GENERATION EVACUATION PROJECTS GENERATION EVACUATION PROJECTS GENERATION EVACUATION PROJECTS GENERATION EVACUATION PROJECTS SYSTEM STRENGTHENING/ AUGMENTATION PROJECTS SYSTEM STRENGTHENING/ AUGMENTATION PROJECTS SYSTEM STRENGTHENING/ AUGMENTATION PROJECTS SYSTEM STRENGTHENING/ AUGMENTATION PROJECTS INTER REGIONAL PROJECTS INTER REGIONAL PROJECTS INTER REGIONAL PROJECTS INTER REGIONAL PROJECTS

3 GENERATION EVACUATION SCHEMES RAMAGUNDAM STAGE –III RAMAGUNDAM STAGE –III RAMAGUNDAM STAGE –III RAMAGUNDAM STAGE –III KOODANKULAM APP KOODANKULAM APP KOODANKULAM APP KOODANKULAM APP NEYVELI TS-II EXPANSION NEYVELI TS-II EXPANSION NEYVELI TS-II EXPANSION NEYVELI TS-II EXPANSION KAIGA STAGE -II KAIGA STAGE -II KAIGA STAGE -II KAIGA STAGE -II

4 RAMAGUNDAM STAGE - III RAMAGUNDAM-HYDERABAD D/C RAMAGUNDAM-HYDERABAD D/C HYDERABAD-KURNOOL S/C HYDERABAD-KURNOOL S/C KURNOOL – GOOTY S/C KURNOOL – GOOTY S/C GOOTY – NELAMANGALA S/C GOOTY – NELAMANGALA S/C LINES ESTIMATED PROJECT COST: RS 390 CRORES AP KAR RAMAGUNDAM HYDERABAD KURNOOL GOOTY NELAMANGALA

5 NEW PROJECTS ON THE ANVIL KUDANKULAM TRANSMISSION SYSTEM( 2000MW) LINES : 601+ 350 = 950 Km. ESTIMATED COST = 1710 CRORES  KUDANKULAM-TIRUNELVELI 2 X 400 KV D/C LINES WITH 2 X 400 KV D/C LINES WITH QUAD (108 & 83 Km.) QUAD (108 & 83 Km.)  TIRUNELVELI-UDUMALPET D/C LINE WITH TWIN D/C LINE WITH TWIN MOOSE (300Km) MOOSE (300Km)  LILO OF BOTH CIRCUITS OF MADURAI-TRIVANDRUM LINE MADURAI-TRIVANDRUM LINE AT TIRUNELVELI ( 2 X 55 Km) AT TIRUNELVELI ( 2 X 55 Km)  EDAMON-MUVATTUPUZHA D/C LINE QUAD (150Km) D/C LINE QUAD (150Km)  TIRUNELVELI-EDAMON 400KV D/C LINE (110Km).  MUVATTUPUZHA-TRICHUR 400KV D/C LINE WITH QUAD CONDUCTORS (90Km) CONDUCTORS (90Km) T N KARNATAKA KERALA

6 NEW PROJECTS ON THE ANVIL KUDANKULAM TRANSMISSION SYSTEM( 2000MW) SUB-STATIONS  NEW 400/220KV SUBSTATIONS AT TIRUNELVELI, MUVATTUPUZHA MUVATTUPUZHA  AUGMENTATION OF TRANSFORMATION CAPACITY BY ONE TRANSFORMER EACH AT UDUMALPET & TRIVANDRUM S/S TRANSFORMER EACH AT UDUMALPET & TRIVANDRUM S/S SUPPLEMENTARY TRANSMISSION SYSTEM  LILO OF ONE CIRCUIT OF 400KV MADURAI-TRICHY AT KARAIKUDI ( 60 Km) ALONG WITH SUBSTATION AT AT KARAIKUDI ( 60 Km) ALONG WITH SUBSTATION AT KARAIKUDI (TAMILNADU) KARAIKUDI (TAMILNADU)  LILO OF ONE CIRCUIT OF TALAGUPPA-NELAMANGALA 400KV LINE AT HASSAN ( 80 KM) ALONG WITH SUBSTATION AT 400KV LINE AT HASSAN ( 80 KM) ALONG WITH SUBSTATION AT HASSAN.(KARNATAKA) HASSAN.(KARNATAKA)

7 NEW PROJECTS ON THE ANVIL KAIGA 3 & 4 TRANSMISSION SYSTEM LINES : 413 Kms  MYSORE-KOZHIKODE D/C LINE  LILO OF KOLAR-SRIPERUMBADUR AT MELAKOTTAIYUR (40KM) AT MELAKOTTAIYUR (40KM)  NARENDRA-DAVANGERE D/C LINE SUB-STATION : 2 Nos. New  NEW 400/220KV SUBSTATION AT KOZHIKODE & MELAKOTTAIYUR KOZHIKODE & MELAKOTTAIYUR  2 ND 315MVA TRANSFORMER AT HIRIYUR S/S. HIRIYUR S/S.  BAY EXTENSION AT NARENDRA, DAVANGERE (KPTCL) & HIRIYUR. HIRIYUR. COST ESTIMATE : 512 CRORES KERALAKERALA

8 NEW PROJECTS ON THE ANVIL NLC-TS-II EXPANSION TRANSMISSION SYSTEM LINES : 467 Km.  2 NOS. 400KV S/C LINES FROM NEYVELI-TS-II (EXISTING) NEYVELI-TS-II (EXISTING) TO NLC TS-II (EXPAN) (8 KM). TO NLC TS-II (EXPAN) (8 KM).  NEYVELI-PUGALUR D/C LINE  PUGALUR-MADURAI D/C LINE  UDUMALPET-ARASUR D/C LINE  LILO OF NEYVELI-SRIPERUMBU- DUR LINE AT PONDY. DUR LINE AT PONDY. SUB-STATION  NEW 400/220KV SUBSTATIONS AT PUGALUR, ARASUR & PONDICHERRY. PONDICHERRY. COST ESTIMATE : 721 CRORES T N KERALAKERALA KARNATAKA

9 SYSTEM STRENGTHENING SCHEMES 400 KV D/C KAIGA-NARENDRA 400 KV D/C KAIGA-NARENDRA 400 KV D/C MADURAI-TRIVANDRUM 400 KV D/C MADURAI-TRIVANDRUM 400 KV D/C NELMANGALA-SOMANAHALLI 400 KV D/C NELMANGALA-SOMANAHALLI 400 KV D/C RAICHUR-GOOTY LINE 400 KV D/C RAICHUR-GOOTY LINE LILO OF SRISAILAM-NUNNA AT N’SAGAR LILO OF SRISAILAM-NUNNA AT N’SAGAR LILO OF N’SAGAR-RAICHUR AT MEHBOOBNAGSR LILO OF N’SAGAR-RAICHUR AT MEHBOOBNAGSR LILO OF NELLORE-MADRAS D/C AT ALMATHI LILO OF NELLORE-MADRAS D/C AT ALMATHI 2X315 MVA, 400/220 KV SS AT ALMATHI 2X315 MVA, 400/220 KV SS AT ALMATHI

10 INTER REGIONAL SCHEMES 2 ND POLE AT GAZUWAKA ASSOCIATED SCHEMES ASSOCIATED SCHEMES PROVIDING 50% SERIES COMPENSATION ON JEYPORE GAZUWAKA LINE AT JEYPORE END PROVIDING 50% SERIES COMPENSATION ON JEYPORE GAZUWAKA LINE AT JEYPORE END GAZUWAKA-NUNNA D/C LINE WITH 63 MVAR LINE REACTOR AT BOTH ENDS GAZUWAKA-NUNNA D/C LINE WITH 63 MVAR LINE REACTOR AT BOTH ENDS AP ERER JEYPORE GAZUWAKA


Download ppt "PROJECTS IN THE PIPELINE IN SOUTHERN REGION. PROJECTS IN THE PIPELINE IN SR GENERATION EVACUATION PROJECTS GENERATION EVACUATION PROJECTS GENERATION EVACUATION."