TECH 50800 Project Measure Phase QC Throughput Rate Improvement.

Similar presentations


Presentation on theme: "TECH 50800 Project Measure Phase QC Throughput Rate Improvement."— Presentation transcript:

1

2 TECH 50800 Project Measure Phase QC Throughput Rate Improvement

3 Project Review  Productivity is the KPI at our facility. So if productivity is increased the cost decreases.  No project has been done for the AWCC Quality productivity (KPI). Since the repair department is being transferred to another facility, need is to understand the productivity expectations.

4 SIPOC

5 CTQ Tree QC’d Phone Labelers Kitters Final QC check Associates Overall repaired phone Manpower Functional test Components ICE Customers CTQ KPOV KPIVs

6 Process Map

7  Process observation worksheet  Check sheets  Spaghetti diagram

8 Data Collection Plan Historical data Process owner Excel file attached with the presentation

9 Graphical Representation

10 Graphical Representation (haroldo)

11 Graphical Representation (gloria)

12 Mean, Median, Mode, Standard deviation, Range

13

14

15 SWOT StrengthsWeakness  Dedicated manpower  Equipment  55 units/8 hours/person OpportunitiesThreats  Increase production to 60 units/8 hrs/person  Increased customer satisfaction  Increase in soft savings  Associates reluctant to change  Might not understand LSS approach

16 Tollgate Review I Concur that the Measure phase was successfully completed on 10/22/2013 I concur the project is ready to proceed to next phase: Analyze Anil Nair Champion/MBB Greg Malone Process Owner

17 Thank You