Energie Bio Bioenergy Village Jühnde Energie Bio Bioenergy Village Jühnde 2012-10-05 1 Jühnde Bio-Energy Village in Germany Parlamentary Hearing on 100%

Similar presentations


Presentation on theme: "Energie Bio Bioenergy Village Jühnde Energie Bio Bioenergy Village Jühnde 2012-10-05 1 Jühnde Bio-Energy Village in Germany Parlamentary Hearing on 100%"— Presentation transcript:

1 Energie Bio Bioenergy Village Jühnde Energie Bio Bioenergy Village Jühnde 2012-10-05 1 Jühnde Bio-Energy Village in Germany Parlamentary Hearing on 100% Renewable Energy in European Regions 2012-10-05 Eckhard Fangmeier

2 Energie Bio Bioenergy Village Jühnde Energie Bio Bioenergy Village Jühnde 2012-10-05 2 750 inhabitants 9 farmers 1300 ha fields 800 ha wood First Bioenergy Village in Germany Renewable Energy since Sept.2005 What is Jühnde and where is it located?

3 Energie Bio Bioenergy Village Jühnde Energie Bio Bioenergy Village Jühnde 2012-10-05 3 Motivation for a Bioenergy Village The Idea came from University of Göttingen: „Self-sufficient Heating and Electricity Supply Using Biomass“ Goals of the project: economical (independent, agriculture income, middle term investment) ecological ( CO-2 neutral, lesser mineral fertilizer, biodiversity) social (stronger local society, responsibility for each other, democratic decisions) Village Jühnde has been inspired by the idea, took the challenge, has build an cooperative society, made a investment decision for 5,2 Mio € and is now responsible for the business Electricity produced = 2x Electricity consumed

4 Energie Bio Bioenergy Village Jühnde Energie Bio Bioenergy Village Jühnde 2012-10-05 4 Milestones 2001-Jan Information meeting for inhabitants 2002-Oct Contracts with customers; 70% 2003-Dez Building application for approval availible 2004-Oct Build cooperative association, Decision for investment 2004-Nov Start of implementation 2005-SeptStart of energy production … 2012-Sept7 years experience

5 Energie Bio Bioenergy Village Jühnde Energie Bio Bioenergy Village Jühnde Electricity about 5 million kWh / year Heating supplies village, a 70% Participation of the people through the cooperative Reduction of approximately 60% CO2 / a / Inhabitants Economy operating with approximately € 1.3 million turnover / a 80% of revenues in the region remains Pilot project with many visitors 7 years RE in Jühnde based on biomass Biogasplant 712 kW Heating system 550 kW Hot water grid app. 5,5 km Peak load system oil bases 1.700 kW

6 Energie Bio Bioenergy Village Jühnde Energie Bio Bioenergy Village Jühnde Benifits for the community B. Ecological Effects CO2 reduction plant diversity odor reduction drinking Water Protection C. Social effects Strengthening the Community Identification Responsibility A. Economic effects Independence of fossil resources Additional pillar for agriculture Additional jobs Perspective for the region Regional value increase

7 Energie Bio Bioenergy Village Jühnde Energie Bio Bioenergy Village Jühnde What paved the way for transition 2012-10-05 7 The technologies were available (500 Biogasplants, wooden chip oven, Hotwater grids) Motivated people to use the technologies together with the available renewable resources and to adapt it The national policy framework §

8 Energie Bio Bioenergy Village Jühnde Energie Bio Bioenergy Village Jühnde Keys to achieve the high share of RE 2012-10-05 8 Renewable Ressources availible University at the beginning helped with independend information and teamwork Motivation initiated by a competition Payed feasibility study Engineers who helped us Motivated Farmers Key-people in the village Motivated people in the village Local economic Advisors Local politicans

9 Energie Bio Bioenergy Village Jühnde Energie Bio Bioenergy Village Jühnde Role of national policy framework 2012-10-05 9 01.08.2004: A new version of the EEG with higher compensation for biomass Our business plan worked ~ 17,12 Cent/kWh Our business plan worked ~ 17,12 Cent/kWh Effects Jühnde 01.09.2009 : The amendment of 2008 had the objective of increasing the share of renewables in electricity supply by 2020 to a level of at least 35% Additional income ~21 Cent/kWh Manure Formaldehyde-Bonus Heat out of CHP- process Additional income ~21 Cent/kWh Manure Formaldehyde-Bonus Heat out of CHP- process National Legislation

10 Energie Bio Bioenergy Village Jühnde Energie Bio Bioenergy Village Jühnde It was the right time for Transition to 100% RE

11 Energie Bio Bioenergy Village Jühnde Energie Bio Bioenergy Village Jühnde New Projects 2012-10-05 11 E-mobility 4-5 Windmills in Jühnde European Network of Self-sustaining communities

12 Energie Bio Bioenergy Village Jühnde Energie Bio Bioenergy Village Jühnde 2012-10-05 12 Contact Eckhard Fangmeier Chairman and Executive Director Bioenergiedorf Jühnde eG Koppelweg 1 D-37127 Jühnde Mobil: +49 (0) 160 977 137 44 Phone: +49 (0) 5502 998 384 Phone priv: +49 (0) 5502 4407 Fax: +49 (0) 5502 999 391 E- Mail: Eckhard.Fangmeier@Bioenergiedorf.de Internet: www.bioenergiedorf.dewww.bioenergiedorf.de

13 Energie Bio Bioenergy Village Jühnde Energie Bio Bioenergy Village Jühnde 2012-10-05 13 Appendix