Senior Design Team 12: Chase Bryant Alexandra Callich Jonathan Meyer-Senior Elliot Popper Rayford Rahming Christian Scott.

Similar presentations


Presentation on theme: "Senior Design Team 12: Chase Bryant Alexandra Callich Jonathan Meyer-Senior Elliot Popper Rayford Rahming Christian Scott."— Presentation transcript:

1 Senior Design Team 12: Chase Bryant Alexandra Callich Jonathan Meyer-Senior Elliot Popper Rayford Rahming Christian Scott

2

3 Horizontal-Axis Turbine Quadruped-Foundation Hinged Tower with Counterweight Wind Turbine Systems Induction Generator System Control System Braking System Hydraulic Drive System

4

5

6  During the raising/lowering process  When is it finished?  Possible Solutions  Hydraulic Cylinder State  Time-based

7 Microcontroller New Turbine Blades Wind Turbine – Induction Generator Data-Logging Anemometer

8 Hydraulic Cylinder Hydraulic Power Unit with Solenoid Control Switch

9 Located in Thomasville, GA. Southern Division focuses primarily on the Southeast Greg Orff – General Manager

10

11 Welding on Gussett Plates Completed Legs Cutting pipes at 60° angles

12 Drilling holes in Gussett Plates Completed Upper Assembly Welding of Upper Assembly

13

14  MATLAB – Simulink  Simulink block diagram is fully constructed with minor issues to be worked out.  Provides time-based performance information in graphical form  Flow rate (hydraulic fluid)  Pressures  Forces  Issues  Additional assistance  Certain component specifications need to be known

15  Finding a location for permanent placement  Functional lowering mechanism  Power production  Estimated Completion Date: April 1, 2013  Remainder of time for operating and testing the system