Study Committee A3 HIGH VOLTAGE EQUIPMENT Activity Report 2014 WG A3.30 SUBSTATION EQUIPMENT OVERSTRESS Convener: Antonio Carvalho - BR Secretary: Jorge.

Similar presentations


Presentation on theme: "Study Committee A3 HIGH VOLTAGE EQUIPMENT Activity Report 2014 WG A3.30 SUBSTATION EQUIPMENT OVERSTRESS Convener: Antonio Carvalho - BR Secretary: Jorge."— Presentation transcript:

1 Study Committee A3 HIGH VOLTAGE EQUIPMENT Activity Report 2014 WG A3.30 SUBSTATION EQUIPMENT OVERSTRESS Convener: Antonio Carvalho - BR Secretary: Jorge Amon - BR Number of Members:15 Regular Members:11 (BR, CH, USA, NE, IN, CR, FR, SA) Corresponding Members: 4 (D, BR, JP, CA) Dismissed inactive members: 4 Working Group Activity ReportPage No.: 1March 2014

2 Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportPage No.: 2 Activities & discussion items Five meeting until date: September 2011 in Vienna, March 2012 in Baden, August 2012 in Paris,March 2013 in Rio, September 2013 in Johannesburg. Work divided in 6 different topics: 1. Stressing parameters: - Environmental, Electrical, Dielectric, Mechanical, Prioritization of stressing parameters 2. Equipment capabilities - Standards, Test protocols, Specification, Influence of aging (WG A3.29) 3. Review of utilities processes to assess potential overstresses risk 4. Measures for risk mitigation: - What utilities do (or should do) to mitigate equipment´s overstress risks? 5. Proposal for improvements on the overstress management process: - gap analysis of utilities overstress management X main stressing parameters & available information on equipment capabilities -proposals for improvement & recommended processes - suggestions for standards improvements 6. Brochure annexes: - overstress checking procedures for selected equipment and stress parameters. March 2014

3 Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportMarch 2014Page No.: 3 Activities & discussion items State of the work: Item 1 (Stressing parameters) already concluded; Item 2 (Equipment capabilities):  standards analysis to be finalized next meeting;  test protocols and specification analysis to be prepared for sept./2014;  Aging influence: waiting for WG A3.29 results; Item 3 (Review of utilities processes):  Experiences so far collected: ONS, AXPO, EDF, LIANDER, BPA, VLPGO (NG, TERNA, REE, ONS & RTE)  first draft foreseen for sept./2014; Item 4 (Measures for Risk Mitigation):  Experiences so far collected: ONS, AXPO, EDF, LIANDER, BPA, VLPGO (NG, TERNA, REE, ONS & RTE)  first draft foreseen for sept./2014; Item 5 (Proposal for improvements): last task, conclusion foreseen for May 2015 Item 6 (Annexes): already started for CB and CT, conclusion foreseen for March 2015

4 Study Committee A3 HIGH VOLTAGE EQUIPMENT Working Group Activity ReportPage No.: 4 Membership MembersEmailCompanyCountry 1Antonio Carvalho (Convener)antonio.carlos@ons.org.brONSBrazil 2Christian LindnerChristian.Lindner@axpo.chAXPOSwiterland 3Kenn Edwardsksedwards@bpa.govBPAUSA 4Jorge Amon Filhojorgamon@furnas.gov.brFURNASBrazil 5Marcel HooijmansMarcel.Hooijmans@alliander.comLiander NVNetherland 6Robin Kumar Sarkar rksarkar@powerqridindia.com POWERGRIDIndia 7Petr Kopejtkokopejtko@egu-vvn.czEGU HV LaboratoryCzech Republic 8 Reto Karrer Reto.karrer@ch.abb.comABBSwitzerland 9 Santosh Kumar Annadurai santosh.annadurai@alstom.comALSTOMIndia 10Pierre-Daniel Moreau pierre-daniel.moreau@edf.frEDF CISTFrance 11Sphiwe NkosiNkosiSJn@eskom.co.zaEskomSouth Africa Corresponding members 12Armin Schnettlerschnettler@ifht.rwth-aachen.deRWTH Aachen UniversityGermany 13Jonas Oliveirajonas.oliveira@br.abb.comABBBrazil 14 Yubun KomatsuKomatsu.Yuubun@chuden.co.jp Chubu Electric Power Co., Inc. Japan 15André Merciermercier.andre@ireq.caIREQCanada March 2014