1 SEED: Burlington Department of Public Works Spring Interim Presentation

2 Equipment Installed on the S74 Truck Cirus Data Logger Drive-by Download System Temperature Sensor Salt Spreading Sensor GPS System

3 Salt Spreader

4 Salt Spreader Controls Temperature Sensor

5 GPS AntennaDrive-by Download Transmitter

6 ArcGIS

7

8 Equipment on the Way General Dynamics Tablet PCGeneral Dynamics Tablet PC Second Cirus Logger SystemSecond Cirus Logger System

9 Short-Term Goals: Continue Development of User InterfaceContinue Development of User Interface Develop Interface between Cirus Logger and Tablet PCDevelop Interface between Cirus Logger and Tablet PC Continue Testing of ArcGIS to display Desired DataContinue Testing of ArcGIS to display Desired Data

10 Critical Issues Still don’t have a Cirus logging box in our hands There may be a compatibility / availability issue with our in-truck computer and wireless systemThere may be a compatibility / availability issue with our in-truck computer and wireless system Can we get our hands on the ArcGIS SDK