Payload Subsystem Integration and Testing Report Team Name 1 Team Name 2 Team Name N Universities/Institutions Team Members Date.

Similar presentations


Presentation on theme: "Payload Subsystem Integration and Testing Report Team Name 1 Team Name 2 Team Name N Universities/Institutions Team Members Date."— Presentation transcript:

1 Payload Subsystem Integration and Testing Report Team Name 1 Team Name 2 Team Name N Universities/Institutions Team Members Date

2 User notes: –This template shall be followed as closely as possible. –Deviations from this template will make it hard to assess your flight readiness. Without an understanding of your level of flight readiness, your chances of being awarded a primary position will be decreased.

3 Mission Overview –Briefly remind everyone what your mission is.

4 Functional Block Diagrams -A Functional block diagram of the entire system should be presented here. -By now, your payload should have excellent block diagrams after CDR completion. -Yes… again… I know.

5 Subsystem Overview -What subsystems do you have?: -Power (EPS) -Software -Command and Data Handling (C&DH) -Structures -Electrical -Science -…

6 Interfaces -Did everything fit together as planned? -What issues (if any) did you run into? -How will issues be resolved?

7 Pictures -Show lots of pictures of your subsystems fully integrated together -You can never have too many pictures!

8 Test Description -Describe the tests that were conducted… -Were all sensors/science experiments poled? -How long were the tests run? -Why were these tests run? -What requirements were verified?

9 Test Results -Did everything work as planned? -Did all electronics communicate? -Did the software work with all subsystems? -Did the sensors return reasonable data? -Will the sensors need calibration? -Most importantly, just summarize your findings -What needs to change before flight? -Action items…

10 Conclusions –Issues and concerns –Closing remarks

11 Canister Integration Plan –One slide for all payloads outlining the plan to ensure that integration of the N payloads will go smoothly.

12 Appendix –Additional data not immediately relevant to the presentation