K. Long, 13 July, 2015  Target K. Long, Monday, 06 July 2009.

Similar presentations


Presentation on theme: "K. Long, 13 July, 2015  Target K. Long, Monday, 06 July 2009."— Presentation transcript:

1 K. Long, 13 July, 2015  Target K. Long, Monday, 06 July 2009

2 Critical path: Issue: target shaft: – Two approaches to shaft manufacture planned: ‘One piece’: weld two pieces together, then grind to size ‘Two piece’: grind to size, then weld – One-piece shaft has failed: Grinding company removed too much material and compromised weld: – One shaft ‘fell apart’ at grinders; – Others have too little material for weld to be considered sound – Therefore now moving on to weld preparation for two-piece shafts

3 Impact on schedule: Shaft manufacture now ~3 weeks behind schedule Can recover, but need to take care fixing two pieces of shaft together: – Electron-beam weld ‘baseline’: – Alternatives are being considered: Pin, pin and weld, … – If Jason concludes that an alternative fixing scheme should be adopted will present paper to TB for consideration There is risk here! – Well aware of need to install target in August shutdown Also well aware of continuing requirement to maintain high standards of quality control and tracking of manufacture


Download ppt "K. Long, 13 July, 2015  Target K. Long, Monday, 06 July 2009."

Similar presentations


Ads by Google