Intelligent Placement of Datacenters for Internet Services Íñigo Goiri, Kien Le, Jordi Guitart, Jordi Torres, and Ricardo Bianchini 1.

Similar presentations


Presentation on theme: "Intelligent Placement of Datacenters for Internet Services Íñigo Goiri, Kien Le, Jordi Guitart, Jordi Torres, and Ricardo Bianchini 1."— Presentation transcript:

1 Intelligent Placement of Datacenters for Internet Services Íñigo Goiri, Kien Le, Jordi Guitart, Jordi Torres, and Ricardo Bianchini 1

2 Motivation Internet services require thousands of servers Use multiple “mirror” datacenters – High availability and fault tolerance – Low response time Spend millions building and operating datacenters Consume enormous amounts of brown energy 2

3 Datacenter construction costs Each datacenter costs >$100M to construct – The smaller datacenters are rated at ~25MW Examples: – Microsoft DCs in Virginia & Chicago: $500M each 3

4 Energy costs and carbon emissions Company#Servers Energy/year (MWh) Energy cost/year CO 2 /year (Metric tons) eBay16K0.6 x 10 5 $3.7M0.4 x 10 5 Akamai40K1.7 x 10 5 $10M1.0 x 10 5 Rackspace50K2 x 10 5 $12M1.2 x 10 5 Microsoft>200K>6 x 10 5 >$36M>3.6 x 10 5 Google>500K>6.3 x 10 5 >$38M>3.8 x 10 5 Sources: [Qureshi’09], EPA 4

5 Intelligent Placement of Datacenters Goal: Manage the monetary and environmental costs Define framework Model costs and datacenter characteristics Define optimization problem Create solution approaches Collect cost and location-related data Create placement tool 5

6 Outline Motivation Placing datacenters Evaluation Conclusion 6

7 Selecting datacenter locations Model datacenter placement – Network latencies – Availability 7

8 Selecting datacenter locations Model datacenter placement – Network latencies – Availability CAPEX costs – Distance to electricity and networking infrastructure – Land and construction (maximum PUE) – Power delivery, cooling, backup equipment – Servers and networking equipment 8

9 Selecting datacenter locations Model datacenter placement – Network latencies – Availability CAPEX costs – Distance to electricity and networking infrastructure – Land and construction (maximum PUE) – Power delivery, cooling, backup equipment – Servers and networking equipment OPEX costs – Maintenance and administration – Electricity and water prices (average PUE) 9

10 Selecting datacenter locations Model datacenter placement – Network latencies – Availability CAPEX costs – Distance to electricity and networking infrastructure – Land and construction (maximum PUE) – Power delivery, cooling, backup equipment – Servers and networking equipment OPEX costs – Maintenance and administration – Electricity and water prices (average PUE) Incentives (taxes) 10

11 Selecting datacenter locations Model datacenter placement – Network latencies – Availability CAPEX costs – Distance to electricity and networking infrastructure – Land and construction (maximum PUE) – Power delivery, cooling, backup equipment – Servers and networking equipment OPEX costs – Maintenance and administration – Electricity and water prices (average PUE) Incentives (taxes) 11

12 Formulating the problem Goal – Minimize CAPEX and OPEX Constraints – Response times < MAX LATENCY for all users – Min consistency delay between 2 DCs < MAX DELAY – Min system availability > MIN AVAILABILITY Output – Number of servers at each location – Minimum cost 12

13 Solving the (non-linear) problem Linear Programming – Does not support non-linear costs Brute force – Too slow Simple heuristics – May not produce accurate results efficiently 13

14 Our approach for solving the problem Evaluate each potential solution – Quickly via Linear Programming (LP) Consider neighboring configurations – Simulated annealing (SA) Cost optimization process – Combine SA and LP 14 Current solutionNear neighbor LP SA LP

15 Our approach for solving the problem 15 LP SA LP SA LP SA $13.8M/month $9.2M/month$10.7M/month $10.3M/month

16 Summary of our approach Generate a grid of tentative locations Collect data about each location Define datacenter characteristics Instantiate optimization problem Solve optimization problem 16

17 Tool demo We built a tool that – Embodies the problem – Input data for the US – Multiple solution approaches Short video at: http://www.darklab.rutgers.edu/DCL/dcl.html 17

18 Outline Motivation Placing datacenters Evaluation Conclusion 18

19 Comparing locations for 60k-server DC 19

20 Interesting questions How much does… … lower latency cost? … higher availability cost? … faster consistency cost? … a green DC network cost? … a chiller-less DC network cost? 20

21 Cost of 60k-server green DC network 21 Green DC network costs $100k/month more, except when latency <70ms

22 Cost of a 60k-server chiller-less DC network 22 Chiller-less DC network is cheaper but it cannot achieve low latencies

23 Conclusions First scientific work on smart datacenter placement – Proposed framework and optimization problem – Proposed solution approach – Characterized many locations across the US – Built a tool to automate the process – Answered many interesting questions Results show that smart placement can save millions Work enables smaller companies to reap the benefits 23

24 Intelligent Placement of Datacenters for Internet Services Íñigo Goiri, Kien Le, Jordi Guitart, Jordi Torres, and Ricardo Bianchini 24

25 Future work Extend with data from Europe Include tax incentives Test the tool with data from real services 25

26 Maximum user response time 26 Maximum latency of 75 milliseconds

27 Location-dependent data Network backbones – Connectivity – Response time Power plants and transmission lines – Power capacity – CO 2 emissions Pricing – Land – Electricity – Water Weather – Temperature → PUE 27

28 Location-dependent data Example: – Network backbones – Major cities – Electricity price 28

29 Datacenter characteristics Number of servers and internal networking Cooling cost (function of PUE) Infrastructure cost (power and networking) Building costs Land required Water consumption Staff costs Example: Building costs range from $8/W to $22/W 29